Half Yearly Report and Accounts
Released
Released
Announcement PDF
Interim Financial Report
31 December 2025
For the 6-month period ended 31 December 2025
Manuka Resources Ltd
and its controlled entities
ABN 80 611 963 225
Manuka Resources Ltd
For the half-year ended 31 December 2025
i | P a g e
CORPORATE DIRECTORY
Directors
Dennis Karp – Executive Chairman
Alan J Eggers – Executive Director
John Seton – Non-Executive Director
Key Management
Haydn Lynch – Chief Operating Officer
Rod Griffiths – Executive General
Manager
Joint Company Secretaries
Eryn Kestel
Alex Sutton
Registered Office
Level 4, Grafton Bond Building
201 Kent Street
Sydney NSW 2000
www.manukaresources.com.au
Lawyers
K&L Gates
Level 31, 1 O’Connell Street
Sydney NSW 2000
Auditor
RSM Australia Partners
Level 7, 1 Martin Place,
Sydney NSW 2000
Australian Share Registry
Automic Group Pty Ltd
Level 5, 126 Phillip Street,
Sydney NSW 2000
1300 288 664 (within Australia)
+61 2 9698 5414 (from overseas)
hello@automicgroup.com.au
investor.automic.com.au
New Zealand Share Registry
MUFG Corporate Markets Ltd
Level 30, PWC Tower
15 Customs Street West,
Auckland 1010 New Zealand
Telephone +64 9 375 5998
Stock Exchange Listing
Manuka Resources Limited shares (Code:
MKR) are listed on the Australian
Securities Exchange and the New Zealand
Stock Exchange.
Manuka Resources Ltd
For the half-year ended 31 December 2025
ii | P a g e
Contents
Page
Directors’ Report 3
Auditor’s Independence Declaration 9
Consolidated Statement of Profit or Loss and Other Comprehensive Income 10
Consolidated Statement of Financial Position 11
Consolidated Statement of Changes in Equity 13
Consolidated Statement of Cash Flows 14
Notes to the Financial Statements 15
Directors’ Declaration 31
Independent Auditor’s Report 32
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 3
Directors’ Report
The Directors of Manuka Resources Ltd (‘Manuka Resources’) present their report together with the financial
statements of the Entity or the Group, being Manuka Resources (‘the Company’) and its subsidiaries Mt Boppy
Resources Pty Ltd (‘Mt Boppy’) and Trans-Tasman Resources Limited (TTR) for the six months ended 31
December 2025.
Director details
The following persons were Directors of Manuka Resources during or since the end of the financial period and
up to the date of this report:
• Mr Dennis Karp
• Mr Alan J Eggers
• Mr John Seton
Review of operations and financial results
The last six months of calendar 2025 were largely spent focussing on the refinance of Manuka’s senior secured
debt facility, the arrangement of a restart finance package and operational preparation for implementation
once the dual finance components had been completed. In September 2025 the refinance of TransAsia’s senior
debt facility was completed and four weeks later the Company completed a two-tranche capital raising. The
first tranche to be paid promptly with funds from the second tranche to occur following shareholder approval
from Manuka’s AGM, which was granted in late November. On 1 December 2025 the Company announced
through the ASX on 9 March 2026, that it had executed a draft term sheet for a comprehensive restart debt
facility with Nebari Natural Resources Credit Fund. At time of writing, this facility has been completed and the
first tranche – US$26million out of a total of US$30 million, has now been drawn.
On 26 September 2025 Manuka announced that it had received approval to list on the New Zealand Stock
Exchange (“NZX”) with trading to commence on 29 September 2025. This listing was driven by the fact around
30% of the Company’s shareholders are New Zealand based and the Company’s Taranaki VTM Project is
located in the South Taranaki Bight of New Zealand.
Also on 26 September 2025, the Company released it plans to restart silver and gold production with a
proposed 10 year mine plan. Both silver and gold metals enjoyed exceptional price increases during calendar
2025 (the price of silver increased by ~160%, while the price of gold increased by 65%). These elevated prices,
which continue to hold into 2026 (silver up a further 20% at time of writing and gold up 15%), provide fantastic
momentum to the Company’s restart plans. Production of silver and gold is expected to restart through our
100% owned Wonawinta plant during mid 2026 and accordingly plans are well progressed. The Company
announced that it had ended its Care and Maintenance program through the ASX on 9 March 2026 and was
now in an operational mode. An announcement of the restart of the trucking of ores from Mt Boppy is
imminent. With the recommencement of silver and gold production the next six-month period is going to be
a very exciting time for Manuka Resources and its shareholders.
In December 2024 the New Zealand government passed the Fast-track Approvals Act 2024 (the “Fast-track
Act”) into law. TTR’s Taranaki VTM Project, listed in Schedule 2 of the Fast Track Act, was considered to meet
the Fast-track Act’s purpose including being a project of regional or national significance for final project
consents to develop.
TTR lodged a substantive Fast Track application on 15 April 2025. Following the release of a draft decision by
the expert panel on 5 February 2026 to decline the marine and discharge consents, TTR withdrew its Fast-
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 4
track application and is now considering a number of options to progress the final environmental approvals
for the project.
Cobar Basin Silver and Gold Projects
On 30 January 2026 Manuka released the updated 10-year Mine Plan for the Wonawinta Silver and Mt Boppy
Gold Mines1, respectively located 80km due south and 50km due east of Cobar, within the prolific Cobar Basin
mining province of New South Wales.
Wonawinta comprises a granted mining lease, existing open pit mines, an existing 1Mtpa CIL processing plant
and associated infrastructure including approved tailings dams and accommodation facilities.
The Production Plan described in the ASX announcement outlined the upgrading and recommissioning of the
Wonawinta processing plant to enhance throughput and leach performance and deliver a Production Target
that comprises:
• 10.4Mt silver ore from selected stockpiles and 5 open pits located adjacent to the Wonawinta
processing plant;
• an initial 0.2Mt of gold ore from selected areas of larger 2.2Mt Rock Dump, Tailings and Stockpile
Resource located at Mt Boppy; and
• 0.3Mt of high-grade gold ore from the existing Open Pit at Mt Boppy.
The Production Plan estimated a capital requirement of A$26.6 million to bring the processing plant into
production, of which A$11.4 million will be spent on a new desliming circuit to remove clays that have
previously inhibited mill throughput and CIL recoveries. The upgrade and refurbishment of the processing
plant is now underway with first production from Wonawinta Stockpiles and Mt Boppy Stockpiles in Q2 2026.
Mining at Wonawinta open pits is scheduled to commence in Q3 2026.
Over the 10-year Mine Plan, the Project is forecast to generate an average EBITDA of A$127 million p.a.
at a C1 cost of A$34.4/oz silver (including gold credits) resulting in an NPV8 of A$805 million and an IRR of
1,092%.
The 10.9Mt Mine Plan is underpinned by 6.9Mt Reserves and comprises 8% Measured Resources, 54%
Indicated Resources and 39% Inferred Resources. There is a low level of geological confidence associated with
Inferred Resources and there is no certainty that further exploration work will result in the conversion of
Inferred Resources to Indicated Resources or return the same grade and tonnage distribution.
During the reporting period significant efforts were made to bring these assets back into production,
accelerated by the appreciation in silver and gold prices over the period. Post balance date many critical hires
have been completed whilst recruitment activities for the balance of roles are progressing with many
candidates from the surrounding regions. The Company acknowledges community support for the projects
which further adds to the importance of mining in the Central West NSW.
Taranaki VTM Project
Manuka holds a 100% interest in the Taranaki VTM Iron Sands Project via its wholly owned subsidiary TTR.
1 Manuka ASX release 30 January 2026
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 5
Located offshore in the STB, within New Zealand’s Exclusive Economic Zone (“EEZ”), the project comprises a
3.2 billion tonne (“Bt”) vanadiferous titanomagnetite (“VTM”) iron ore resource2 at 10.17% Fe2O3, 0.05% V2O5
(containing 1.6Mt V2O5) and 1.03% TiO2 (Table 2), ranking it as one of the largest drilled vanadium projects
globally. Indicated Resources comprise 65.7% of the total Resources with the balance being Inferred.
Table 2: Taranaki VTM Iron Sands Project Mineral Resource
Resource Bt Fe2O3 (%) TiO2 (%) V2O5 (%)
Indicated 2.1 10.45 1.06 0.05
Inferred 1.1 9.64 0.99 0.04
Total 3.2 10.17 1.03 0.05
TTR has granted mineral mining permit MMP55581 within the EEZ containing 1.88Bt VTM resource where the
current PFS mine plan can deliver production of 5Mt export concentrates a year grading 56-57%Fe, 0.5%V2O5
and 8.5%TiO2. TTR’s adjoining mineral exploration permit, MEP54068 (currently under application to be
converted mineral mining permit MMP61486) inside the 12Nm limit within the Coastal Management Area
(“CMA”), contains a reported additional 1.29Bt VTM iron sands resource.
In January 2025 the New Zealand government released the Critical Minerals List to identify minerals essential
to the economy and technological needs. Both vanadium and titanium are included in the Critical Minerals
List, which is a further positive for TTR’s Taranaki VTM Project.
The Critical Minerals List, alongside the Minerals Strategy for New Zealand 2040, also released in January 2025,
and the GNS Report on the NZ’s Potential Economic Mineral Deposits released in August 2024, all include
offshore Taranaki VTM deposits containing vanadium and titanium in the STB controlled 100% by TTR. The
MBIE reports provide the government with insight and facts as to the potential for the development of these
mineral resources in New Zealand.
The New Zealand government has identified TTR’s world-class vanadium rich iron sands project as one of
national significance that has the ability to contribute to New Zealand’s economy and export earnings and to
the government’s resource objective of doubling the value of New Zealand’s mineral exports to $3 billion by
2035.
The Taranaki VTM Project, when in production with an estimated annual production of 10,000t of vanadium,
has the potential to make Manuka one of the leading vanadium producers in the world and propel NZ into the
third largest producer of the metal after China and Russia.
In December 2024 the New Zealand government passed the Fast-track Act into law. TTR’s Taranaki VTM
Project is listed in Schedule 2 of the Fast-track Act to be considered by an expert panel for final approvals to
develop. Schedule 2 projects, including TTR’s, were considered to meet the Fast-track Act’s purpose including
being projects of regional or national significance.
TTR lodged a substantive Fast-track application on 15 April 2025 and followed up with a number of
presentations, expert reports and submissions to the Fast-track panel during 2025. Following the release of a
draft decision by the expert panel on 5 February 2026, to decline the marine and discharge consents required
under the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012, TTR withdrew its
Fast-track application.
2 ASX Release 1 March 2023
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 6
Following the withdrawal of the Fast-track application, the Company is now working through and getting
advice and direction on a number of options to progress the final environmental approvals for the Taranaki
VTM Project.
Financial Summary
The loss for the consolidated entity for the half-year ended 31 December 2025 was $12,875,283 (2024 Loss:
$8,369,652). As at 31 December 2025, the consolidated entity had $2,439,885 in cash.
In addition, the Company had the ability to draw down an additional $6.0m available in short term liquidity.
As at time of writing, the Company has $11.1m in cash plus an additional $9.3m available in short term
liquidity.
Resource Growth and Exploration Outlook
During the period under review the Company’s geological team has continued to implement in part, the
exploration work programmes established from the Q1 2023 Strategic Review. Specific targets were Au-Cu
south of Mt Boppy and a detailed review of the Pipeline Ridge historic drilling (see below). An initial drilling
phase of Mt Boppy deeps and southern extension targets was approved by the MKR Board in September 2025
and initiated during December 2025. Planned resource delineation drilling of Pipeline Ridge will be undertaken
in Q2 2026 after the Mt Boppy South exploration drilling. The MKR Resource Triangle (Fig. 1) shows the current
classification of the exploration targets.
Figure 1: MKR Resource Triangle December 2025
During H2 2025, planning for Phase 2 infill sonic drilling of the Mt Boppy Main Waste dump was completed.
The sonic drilling commenced during Q1 2026 which will improve evaluation of screened dump material
planned for trucking to and processing at the Wonawinta plant during 2026-2027.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 7
Pipeline Ridge (Figure 2) has potential for a gold open pit operation, and analysis and modelling of this target
has continued to be progressed during H2 2025. Work on Pipeline Ridge involved a comprehensive review
of historic reports plus all resource evaluation drilling to date. An assessment of developing an open pit gold
operation has been progressed, and an infill drilling programme for this purpose designed. Historic drilling
includes 32 diamond drill holes (6,590m) and 116 Reverse Circulation (RC) boreholes (6,059m). Based on
preliminary geological modelling the initial startup open pit target is between 200 - 1,145Kt grading between
1.4 and 2.1 g/t Au, containing between 17 and 53 Koz Au. The development of this operation is strategically
aligned with future mining plans over the next 3-4 years at Mt Boppy, located approximately 30km to the
north.
Figure 2: Mt Boppy Southern Extensions and Pipeline Ridge exploration projects
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 8
Other activities included the following:
- Updating and completing various rehabilitation cleanups from historic drilling programmes.
- The reopening of the Wonawinta silver mine has fast tracked a review of existing mineral resource
delineation and exploration drilling on the project. Certain infill programmes converting Inferred
mineral resources to an Indicated classification were assessed during H2 2025.
- Analysis and construction of a Wonawinta geometallugical management model was progressed.
- Continued examination of targets generated from a detailed regional geophysics synthesis of the Mt
Boppy and Wonawinta ML’s and exploration tenements, including conducting a merged data
reinterpretation of all available magnetic data and a revised IP interpretation for the McKinnon’s gold
prospect.
- Continued analysis and reorganisation of the Company’s extensive drilling and geochemical sampling
database.
Significant changes in state of affairs
During the half-year there have been no significant changes in the state of affairs of the Group.
Events arising since the end of the reporting period
There are no other matters or circumstances that have arisen since the end of the period that has significantly
affected or may significantly affect the entity’s operations in future financial years, the results of those
operations in future financial years or the entity’s state of affairs in future financial years, except:
a) On 27 February 2026, the Company entered into a definitive loan documentation for a US$30 million
senior secured term facility with US global resource fund Nebari Natural Resources Credit Fund II LP.
The funds were utilised to repay existing secured debt and provide working capital for the
recommencement of Wonawinta silver and Mt Boppy gold mining and metal processing.
b) A total of 73.4 million unlisted options were exercised, resulting in the issuance of 73.4 million
fully paid ordinary shares and proceeds of $4.6 million, (before costs).
Dividends
No dividends were paid or declared during the period and no recommendation is made as to dividends.
Auditor’s Independence Declaration
A copy of the Auditor’s Independence Declaration as required under s.307C of the Corporations Act 2001 is
included on the following page of this financial report and forms part of this Director’s Report.
This report is made in accordance with a resolution of directors, pursuant to section 306(3)(a) of the
Corporations Act 2001.
Signed in accordance with a resolution of the Directors.
Dennis Karp Alan J Eggers
Executive Chairman Director
Date: 16 March 2026 Date: 16 March 2026
RSM Australia Partners is a member of the RSM network and trades as RSM. RSM is the trading name used by the
members of the RSM network. Each member of the RSM network is an independent accounting and consulting firm
which practices in its own right. The RSM network is not itself a separate legal entity in any jurisdiction.
RSM Australia Partners ABN 36 965 185 036
Liability limited by a scheme approved under Professional Standards Legislation
RSM Australia Partners
Level 7, 1 Martin Place
Sydney
NSW 2000
Australia
T +61 (02) 8226 4500
F +61 (02) 8226 4501
rsm.com.au
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the financial report of Manuka Resources Limited for the half-year ended 31
December 2025, I declare that, to the best of my knowledge and belief, there have been no contraventions of:
(i) the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
(ii) any applicable code of professional conduct in relation to the review.
RSM AUSTRALIA PARTNERS
Cameron Hume
Partner
Sydney, NSW
Dated: 16 March 2026
P a g e | 9
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 10
Consolidated Condensed Interim Statement of Profit
or Loss and Other Comprehensive Income
For the half-year ended 31 December 2025
Notes
31 December
2025
31 December
2024
$ $
Sales revenue 5(a) - -
Operating loss - -
Other income 5(b) 348,376 347,441
Other expenses 6(a) (8,152,749) (3,241,818)
Foreign exchange gains / (losses) 441,987 (2,046,073)
Loss before finance expenses (7,362,386) (4,940,450)
Finance expenses 6(b) (5,512,897) (3,429,202)
Loss before income tax (12,875,283) (8,369,652)
Income tax expense - -
Loss for the period attributable to members of
Manuka Resources Limited
(12,875,283) (8,369,652)
Other comprehensive income / (loss) (1,871,219) (292,923)
Total comprehensive loss for the period
attributable to members of Manuka Resources
Limited (14,746,502) (8,662,575)
Loss per share for loss attributable to the
ordinary equity holders of the Company
Basic profit /(loss) per share (cents per share) 15 (1.20) (1.07)
Diluted profit /(loss) per share (cents per share) 15 (1.20) (1.07)
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 11
Consolidated Condensed Interim Statement of
Financial Position
As at 31 December 2025
Notes
31 December
2025
30 June
2025
$ $
Assets
Current
Cash and cash equivalents 2,439,885 968,645
Trade and other receivables 1,204,463 8,696
Prepayments 18,727 34,472
Inventories 7 234,696 237,899
Other financial assets 8 50,044 21,000
Total current assets 3,947,815 1,270,712
Non-current
Mine properties and development assets 9 629,900 629,900
Exploration and evaluation assets 10 37,161,295 37,934,470
Property, plant and equipment 11 13,574,270 13,752,823
Right-of-use Assets 255,068 334,568
Other financial assets 8 5,481,357 5,475,357
Total non-current assets 57,101,890 58,127,118
Total assets 61,049,705 59,397,830
Liabilities
Current
Trade and other payables 12 5,883,166 8,467,206
Provisions 13 335,585 294,699
Borrowings 14 19,279,253 40,278,049
Lease liabilities 123,678 111,183
Total current liabilities 25,621,682 49,151,137
Non-current
Provisions 13 7,631,165 7,620,743
Lease liabilities 152,569 231,609
Borrowings 14 4,654,124 98,605
Total non-current liabilities 12,437,858 7,950,957
Total liabilities 38,059,540 57,102,094
Net assets 22,990,165 2,295,736
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 12
Consolidated Condensed Interim Statement of
Financial Position (continued)
As at 31 December 2025
Notes 31 December
2025
30 June
2025
$ $
Equity
Share Capital 16 105,436,223 72,948,453
Share based payment reserve 17 4,654,306 1,701,146
Foreign Currency Translation reserve (1,512,744) 358,475
Accumulated losses (85,587,620) (72,712,338)
Total equity 22,990,165 2,295,736
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 13
Consolidated Condensed Interim Statement of
Changes in Equity
For the half-year ended 31 December 2025
Share
Capital
Share-based
payment reserve
Foreign
Currency
Translation
Accumulated
losses
Total equity
$ $ $ $ $
Balance as at 1 July 2024 71,396,811 5,253,710 (27,113) (59,613,257) 17,010,151
Loss for the period - - - (8,369,652) (8,369,652)
Other comprehensive loss - - (292,923) - (292,923)
Total comprehensive loss for the period - - (292,923) (8,369,652) (8,662,575)
Contribution of equity 253,000 - - - 253,000
Share based payments - 181,638 - - 181,638
Share issue costs (147,148) - - - (147,148)
Balance as at 31 December 2024 71,502,663 5,435,349 (320,036) (67,982,908) 8,635,068
Balance as at 1 July 2025 72,948,453 1,701,146 358,475 (72,712,338) 2,295,736
Loss for the period - - - (12,875,283) (12,875,283)
Other comprehensive loss - - (1,871,219) - (1,871,219)
Total comprehensive loss for the period - - (1,871,219) (12,875,283) (14,746,502)
Contribution of equity 34,004,887 - - - 34,004,887
Share based payments - 2,953,160 - - 2,953,160
Share issue costs (1,517,117) - - - (1,517,117)
Balance as at 31 December 2025 105,436,223 4,654,306 (1,512,744) (85,587,620) 22,990,165
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 14
Consolidated Condensed Interim Statement of Cash
Flows
For the half-year ended 31 December 2025
31 December
2025
31 December
2024
$ $
Operating activities
Receipts from customers - 3,627
Payments to suppliers and employees (7,914,501) (3,345,209)
Other income 201,583 347,441
Finance costs paid - (277,595)
Net cash used in operating activities (7,712,918) (3,271,736)
Investing activities
Acquisition of property, plant and equipment (104,490) -
Disposal of property, plant and equipment - 61,127
Payments for development and exploration assets (715,696) (204,743)
Exploration Bonds (3,000) 26,000
Security Bond (32,044) 23,565
Net cash used in investing activities (855,230) (94,051)
Financing activities
Repayments of borrowings (40,374,910) (15,915,895)
Proceeds from borrowings 30,536,384 19,224,285
Repayment of lease liabilities 12,495 (135,284)
Proceeds from issues of ordinary shares 21,382,536 253,000
Costs of issue of ordinary shares (1,517,117) (147,148)
Net cash from financing activities 10,039,388 3,278,958
Net change in cash and cash equivalents 1,471,240 (86,829)
Cash and cash equivalents, at beginning of the period 968,645 2,125,350
Cash and cash equivalents, at end of period 2,439,885 2,038,521
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 15
Notes to the Financial Statements
1 Nature of operations
The principal activities of Manuka Resources Ltd comprise exploration, mine development, mining and
processing of silver and gold, as well as completing the approval process and bringing its Taranaki VTM project
into production.
During the financial half-year ending 31 December 2025, the Company’s principal activities related to the
refinance of Manuka’s senior secured debt facility, the arrangement of a restart finance package and
operational preparation for implementation once the dual finance components had been completed. In
September 2025 the refinance of TransAsia’s senior security was completed and four weeks later the Company
completed a two-tranche capital raising (first tranche to be paid promptly with funds from the second tranche
to occur following shareholder approval from Manuka’s AGM, which was granted in late November. On 1
December 2025 the Company announced that it had executed a draft term sheet for a comprehensive restart
debt facility with Nebari Natural Resources Credit Fund.
At time of writing, this facility has been completed and the first tranche – US$26million out of a total of US$30
million, has now been drawn.
2 Basis of preparation
The interim consolidated financial statements of the Group are for the six months ended 31 December 2025
and are presented in Australian dollars ($), which is the functional currency of the parent company.
These interim condensed consolidated financial statements have been prepared in accordance with the
requirements of the Corporations Act 2001 and AASB 134 Interim Financial Reporting. They do not include all
the information required in annual financial statements in accordance with Australian Accounting Standards
and should be read in conjunction with the consolidated financial statements of the Group for the year ended
30 June 2025 together with any public announcements made during the half-year ended 31 December 2025.
The interim financial report has been approved and authorised for issue by the board of directors on 16 March
2025.
2.1 Going Concern
The financial statements have been prepared on the going concern basis, which contemplates continuity of
normal business activities and the realisation of assets and discharge of liabilities in the normal course of
business.
As disclosed in the financial statements, the group incurred a loss of $12,875,283 and had net cash outflows
from operating activities of $7,712,918 for the half-year ended 31 December 2025. As at that date the
company had net current liabilities of $21,673,867.
These factors indicate a material uncertainty which may cast significant doubt as to whether the Group will
continue as a going concern and therefore whether it will realise its assets and extinguish its liabilities in the
normal course of business and at the amounts stated in the financial report.
The ability to continue as a going concern is dependent on several factors, including:
• Continue to manage the creditor book and repayment of long dated and past due creditors via funds
from capital raising, conversion of debt to equity or the use of working capital/short term loan
facilities as required.
Manuka Resources Ltd
For the half-year ended 31 December 2025
P a g e | 16
• The Company has entered into definitive loan documentation for a US$30 million senior secured term
facility. The facility will be used to refinance the Group’s existing debts (note 14) as well as providing
further funding for its silver and gold mining projects.
• The ability of the Group to commence silver production profitably and consistently as planned at
Wonawinta.
• Raising additional funds in the capital markets.
• Sell down, divest or farm out its non-current assets.
The Directors are confident that the above steps can be achieved based on:
• History of success in raising funds in the market, as previously demonstrated since Manuka’s IPO in
July 2020.
• The level of support extended from key suppliers and creditors to date all of whom are displaying a
strong interest in seeing the Company return to steady gold or silver production.
• High gold and silver prices which both lend themselves to a profitable resumption of production from
material from either the Wonawinta silver project or the Mt Boppy gold project.
Accordingly, the Directors believe that the Group will be able to continue as a going concern and that it is
appropriate to adopt the going concern basis in the preparation of the financial report.
The financial report does not include any adjustments relating to the amounts or classification of recorded
assets or liabilities that might be necessary if the Group does not continue as a going concern.
3 Material accounting policies
These general-purpose financial statements for the interim half-year reporting period ended 31 December
2025 have been prepared in accordance with Australian Accounting Standard 134 ‘Interim Financial Reporting’
and the Corporations Act 2001, as appropriate for for-profit oriented entities. Compliance with AASB 134
ensures compliance with International Financial Reporting Standard IAS 34 ‘Interim Financial Reporting’.
These general-purpose financial statements do not include all the notes of the type normally included in
annual financial statements. Accordingly, these financial statements are to be read in conjunction with any
public announcements made by the Company during the interim reporting period in accordance with the
continuous disclosure requirements of the Corporations Act 2001.
The accounting policies adopted are consistent with those of the previous financial year and corresponding
interim reporting period, unless otherwise stated.
New, revised or amending Accounting Standards and Interpretations adopted
The consolidated entity has adopted all of the new or amended Accounting Standards and Interpretations
issued by the
Australian Accounting Standards Board ('AASB') that are man