Investor Presentation
Released
Released
Announcement PDF
Manuka Resources Limited
• Operating gold & silver producer
Exceptional exploration potential within
the Cobar Basin, NSW Australia
• Valuable production infrastructure,
strategically located
A unique portfolio of assets
February 2024
South Taranaki Bight Project
• World class tier 1 project
• Offshore Vanadium Titaniferous Iron
Sands
• West Coast, North Island
New Zealand
Disclaimer
This disclaimer applies to this presentation and the information contained in it (the Presentation). By reading this disclaimer you
agree to be bound by it. The Presentation has been prepared by Manuka Resources Limited and relates to its subsidiaries,
related parties and any new assets or entities subsequently acquired or incorporated (collectively the Company). The
Presentation was prepared on 25 January 2024 and the information in it is subject to change without notice.
Purpose
The Presentation is for information purposes only and is an overview of the Company and its assets at the time of preparation.
This Presentation does not contain all information necessary to make an investment decision or that would be required in a
prospectus or product disclosure statement prepared in accordance with the requirements of the Corporations Act 2001 (Cth)
(Corporations Act). The Presentation is of a general nature and does not purport to be complete or verified by the Company or
any other person.
Distribution outside Australia
Distribution or release of this document outside Australia may be restricted by law. This document may only be distributed or
released to a person that is not in the United States except as permitted under the U.S. Securities Act. Persons who come into
possession of this document who are not in Australia should seek advice on and observe any such restrictions. Any failure to
comply with such restrictions may constitute a violation of applicable securities laws.
Not an offer or financial product advice
The Presentation does not constitute an offer, invitation, solicitation or recommendation with respect to the purchase or sale of
any security in the Company nor does it constitute financial product advice. The Presentation is not a prospectus, product
disclosure statement or other offer document under Australian law or under any other law. The Presentation has not been filed,
registered or approved by any regulatory authority in any jurisdiction. The Presentation is not intended to be relied upon as
advice or a recommendation to investors and does not take into account the investment objectives, financial situation, taxation
situation or needs of any particular investor.
An investor must not act on the basis of any matter contained in the Presentation and must make its own assessment of the
Company and conduct its own investigations and analysis. Investors should assess their own individual financial circumstances
and consider talking to a financial adviser, professional adviser or consultant before making any investment decision. Neither this
Presentation nor anything contained in it forms the basis of any contract or commitment and no agreement to subscribe for
securities will be entered into on the basis of this Presentation.
No guarantee, representation or warranty
all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of or
reliance on information contained in the Presentation including representations or warranties or in relation to the accuracy or
completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied, contained in,
arising out or derived from, or for omissions from the Presentation including, without limitation, any financial information, any
estimates or projections and any other financial information derived therefrom.
Forward-looking statements
The Presentation includes forward-looking statements and comments about future events, including the Company’s
expectations about the performance of its businesses. Forward-looking words such as “expect”, “should”, “could”, “may”,
“predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other similar expressions are intended to identify forwardlooking statements. Such statements involve known and unknown risks, uncertainties, assumptions and other important factors,
many of which are beyond the control of the Company and which may cause actual results, performance or achievements to
differ materially from those expressed or implied by such statements. Forward-looking statements are provided as a general
guide only, and should not be relied on as an indication or guarantee of future performance. Given these uncertainties,
recipients are cautioned to not place undue reliance on any forward-looking statement. Subject to any continuing obligations
under applicable law, the Company disclaims any obligation or undertaking to disseminate any updates or revisions to any
forward-looking statements in the Presentation to reflect any change in expectations in relation to any forward-looking
statements or any change in events, conditions or circumstances on which any such statement is based. No Limited Party or any
other person makes any representation, or gives any assurance or guarantee that the occurrence of the events expressed or
implied in any forward-looking statements in the Presentation will occur.
Past performance
Past performance is not indicative of future performance and no guarantee of future returns is implied or given.
Previously reported information
The information in this presentation that relates to previously reported exploration results, Mineral Resources and Ore Reserves
is extracted from the Company’s ASX announcements noted in the text of the presentation and are available to view on the
Company’s website. The Company confirms that, other than mining depletion, it is not aware of any new information or data
that materially affects the information included in the original announcements and, in the case of estimates of Mineral
Resources and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
announcement continue to apply and have not materially changes. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially altered.
While reasonable care has been taken in relation to the preparation of the Presentation, none of the Company or their
respective directors, officers, employees, contractors, agents, or advisers nor any other person (Limited Party) guarantees or
makes any representations or warranties, express or implied, as to or takes responsibility for, the accuracy, reliability,
completeness or fairness of the information, opinions, forecasts, reports, estimates and conclusions contained in the
Presentation. No Limited Party represents or warrants that the Presentation is complete or that it contains all information about
the Company that a prospective investor or purchaser may require in evaluating a possible investment in the Company or
acquisition of shares in the Company. To the maximum extent permitted by law, each Limited Party expressly disclaims any and
February 2024
2
Corporate Summary
ASX: MKR
Share price (25 January 2024)
A$0.084
Shares on issue
565.1m
Market capitalisation (undiluted)
A$47.47m
Listed and unlisted options ($0.05 to $0.35 strikes) 92.3m
Board of Directors & Senior Management
Executive Chairman
Dennis Karp
Executive Director (TTR)
Alan Eggers
Non-executive Director
Anthony McPaul
Non-executive Director
John Seton
Company Secretary
Toni Gilholme
Chief Operating Officer
Haydn Lynch
Shares held by board and management
18.3%
“Manuka intends to grow shareholder
value by optimising quality resource
assets. The emerging green fuelled
global economy is providing such
opportunities.”
February 2024
3
Board of Directors & Management
Dennis Karp –
Executive Chairman
Alan Eggers –
Executive Director
Anthony McPaul –
Non-Executive Director
John Seton
–
Non-Executive Director
Toni Gilholme –
Company Secretary
Haydn Lynch –
Chief Operating Officer
Dennis commenced his
career in the Australian
financial markets in
1983. He was the Head
of Trading at HSBC
Australia prior to joining
Tennant Limited in
1997, one of Australia’s
largest physical
commodities trading
companies with
operations in Asia and
Europe. He was a
principal shareholder of
Tennant Metals until
2010, and a director
until December 2014,
Alan is a geologist with
over 40 years of local &
international experience.
He brings with him
exceptional commercial
expertise and was a
founding director of
Summit Resources Ltd
which they built from
listing on the NZX in
1987 into an ASX top 200
company and an ultimate
takeover by Paladin
Energy for A$1.2B in
2007. He holds a number
of private directorships.
Tony is a senior mining
executive with over 40
years’ experience in
mining operations and
mineral processing,
(both underground &
opencut operations).
He was most recently
the general manager
for Newcrest’s Cadia
Valley Operations, in
Orange NSW, and
formally retired from
Newcrest in 2016.
John is an Auckland
based lawyer with
extensive experience in
commercial law and the
mineral resources
sector. He was a
director of Summit
Resources Limited until
its sale in 2007, as well
as being a director of a
number of other ASX
and NZX listed private
companies. He was a
former Chairman of the
Vietnam/New Zealand
Business Council.
Toni is an experienced
Chartered Accountant
with over 20 years’
experience in Financial
Accounting and
Company Secretarial
matters and over 10
years of experience in a
variety of roles in Public
Practice. She has
worked in a range of
senior positions both in
the UK and in Australia
and has a strong focus
on efficiency gains
through improving
processes and
strengthening internal
controls.
Over 25 years of
experience in M&A,
financial markets and
private equity, and with
a substantive track
record in the origination
and execution of
domestic & crossborder transactions in
metals & mining in
Australia, Africa, Japan,
China, and Mongolia.
He led the syndicate
which purchased the
Manuka assets in 2016.
He holds a Bachelor of
Commerce from the
University of Cape Town
Alan holds Bachelor of
Science, Honours and
Master of Science
degrees from Victoria
University of Wellington.
He’s a Fellow of the
Society of Economic
Geologists, & a member
of AusIMM, & Australian
Institute of Geoscientists
Tony has sat on a range
of Boards and industry
bodies including the
Minerals Council
Executive Committee
and Mineral Industry
Advisory Council. He
qualified in automotive
engineering from
Goulburn TAFE.
John holds a Bachelor
of Laws from Victoria
University, Wellington,
and a Masters of Law
(Honours) from the
University of Auckland
and was a Chartered
Fellow of the New
Zealand Institute of
Directors until 2023.
She holds a Bachelor of
Business from the
University of
Technology, Sydney
and is a qualified
Chartered Accountant
Senior management
experience includes
Bankers Trust Australia,
Investec Bank, RBC
Capital Markets and
Southern Cross Equities.
Haydn has degrees in
Mechanical Engineering
and Economics from the
University of Qld and a
Masters in Commerce
from the University of
New South Wales.
February 2024
4
The world class
Taranaki VTM Project
New Zealand
V Ti Fe
Taranaki VTM Project – project highlights
• World class resource 3.2bt vanadium, titanium & magnetite (iron ore)
• Targeted lowest quartile carbon emissions* of Fe producers globally (62kg
CO2/t vs 125-250kg CO2/t)
• Anticipated lowest quartile costs for Fe producers* US$20-24/t FOB (PFS
2013 adj. inflation) EXCLUDING credits from vanadium or titanium
• Located within NZ EEZ (exclusive economic zone targeting gas, oil, mining)
• NZD$85m invested to date (~US$50m).
• Mining Licence granted 2014 (MP55581) – 5Mt pa production for 20 years
• Granted initial EPA environmental consents to operate 2017 – final
approval process nearing completion
• New Zealand government focused on implementing mining code subject
to appropriate environmental safeguards
• Announced Maiden Vanadium JORC Resource** 1.6Mt of contained V2O5
* based on TTR PFS: https://www.manukaresources.com.au/site/investor-centre/pending-acquisitions and as per ASX releases
dated 1 August 2022 and 1 March 2023
** ASX release 1 March 2023
February 2024
5
Taranaki VTM Project
New Zealand
Positive Recent Developments in NZ
• National ACT NZ First coalition government elected November 2023
• Seismic shift in government sentiment for minerals and mining
• First 100 Day Plan Policies include:
➢ Update Crown Minerals Act to promote use of Crown Minerals
➢ Create critical minerals list with preferred pathway to
development (V & Ti) .
➢ Prioritise regional and national projects of significance
➢ Fast track one stop shop consenting for natural resource projects
of significance
➢ Identify strategical opportunities in mineral resources, including
vanadium, and develop plans to develop these opportunities
February 2024
6
Taranaki VTM Project
New Zealand
The Vanadium Market is Coiled Like a Spring
• Demand for vanadium expected to grow & double by 2030
• Extensively used as a strengthener in steel & catalyst for industrial
processes
• Emerging demand in utility scale battery storage (VRFBs):
➢ China leading the charge with development of VRFBs
. by 2030 China will go from
➢ If China builds half its planned VRFBs
largest vanadium exporter in world to net importer
➢ Each 1,000Mw (1Gw) battery requires 10,000 tonnes vanadium
➢ 180 1Gw batteries planned build next 7 years will consume 100%
global supply
➢ In 2018 10% deficit in vanadium supply rockets vanadium price 6x to
US$30lb
February 2024
7
Taranaki VTM Project
Mining Permit MP55581
12Nm Limit
Taranaki VTM Mining Licence
February 2024
8
TTR JORC Resource Estimates
• TTR has drilled a 914Mt JORC Resource in
MP55581 (Stage 1) Mine Area
• 3.2Bt Indicated and Inferred Mineral Resource
• Existing approval of 5mtpa mining licence
(MP55581) with initial 20 year mine life**
• VTM Concentrate Grade 0.5%V205 8.5%Ti02 55%
- 57%Fe
Taranaki VTM Resource Estimates Summary
Indicated and Inferred Mineral Resources
DTR Concentrate
Inside 12Nm (RMA)
Cook North Block
Cut-Off Grade
3.5% DTR*
Mt
274
Fe2O3%
11.90
TiO2%
1.19
V2O5%
0.06
Mt
21
Fe%
57.19
TiO2%
8.12
V2O5%
0.52
Kupe North Block
Tasman North Block
Total VTM Resource RMA
3.5% DTR*
7.5% Fe2O3
417
585
1,275
11.48
9.02
10.44
1.21
0.88
1.05
0.06
0.04
0.05
31
57.07
8.35
0.51
Outside 12Nm (EEZ)
Cook South Block
3.5% DTR*
914
10.95
1.12
0.05
63
55.84
8.45
0.50
Kupe South Block
Tasman South Block
3.5% DTR*
7.5% Fe2O3
272
695
9.76
8.81
0.98
0.89
0.05
0.04
16
56.33
8.43
0.50
1,881
3,157
9.99
10.17
1.01
1.03
0.05
0.05
Total VTM Resource EEZ
Taranaki VTM Resource Total
*Davis Tube Recovery (DTR) Estimate is based on analytical DTR and calculated DTR values
** JORC (2012) refer ASX release dated 1st March 2023
February 2024
9
Taranaki VTM Project
New Zealand
Environmental Advantages
• Operation has small environmental footprint with only 300m x
900m area of disturbance at any time
• Very low carbon emissions (<50%) compared to other hard rock
iron ore deposits with no: Heavy machinery mining fleet, Open pits,
Waste dumps, Haul roads, Energy intensive crushing & grinding
circuits, Railroad or ports
.
• No chemical additives in processing
or tailings
• Natural processes delivers rapid rehabilitation of mined areas
• Short term confined environmental impact with rapid recovery
• No impact on fish, whales or dolphins
• No legacy issues with rehabilitation part of recovery process
February 2024
10
TTR Project Metal Production
ANNUAL CONCENTRATE PRODUCTION
• Iron Ore (57%Fe)
5Mt
• Vanadium Pentoxide
20,000t V2O5 (11,000t V 80% recovery)
• Titanium Dioxide
340,000t TiO2 (80% recovery)
GLOBAL VANADIUM METAL PRODUCERS1
• China
40,000t V
• Russia
18,000t V
• New Zealand (TTR STB)2
11,000t V
• South Africa
7,700t V
• Brazil
5,500t V
1 USGS 2022: V vanadium metal Project Economics based on 57% Fe iron ore concentrate only. Metallurgical
test work to be completed to establish recoverable vanadium and titanium credits
2 Based on proposed 5Mt annual VTM concentrate production
February 2024
11
TTR Project Economics
COMMODITY PRICES JANUARY 2024
• Iron Ore (62%Fe)
US$136.00t
• Vanadium Pentoxide
US$6.00lb
• Titanium Dioxide
US$3,500t
TTR METAL IN CONCENTRATE VALUE TONNE1
• Iron Ore
US$119
• Vanadium2
US$55
• Titanium2
US$240
(11.0% discount applied to 62%)
Metal in concentrate value US$414
1 Note: Project Economics based on 57% Fe iron ore concentrate only. Metallurgical test work to be completed to
establish recoverable vanadium and titanium credits
2 Based on 80% metallurgical recoveries
February 2024
12
Taranaki VTM Project
New Zealand
Economic Benefits to NZ
• Directly employs 270 operational staff & 30 Admin HO
support
• Indirect around 1,665 jobs nation wide
• Operation has annual operating spend $250m
• Generates royalty revenues $70m & corporate taxes $180m pa
.
• Foreign exchange earnings US$580m pa
• No government infrastructure or handouts required
• TTR iron sand resource provides strong commercial base that
will weather shifts in commodity price cycles
• Project will be profitable long term producer >60 years
February 2024
13
TTR Integrated Mining Vessel (IMV)
▪
▪
▪
▪
Length
335m
Breadth
60m
Depth
26.25m
Design Draught
12m
February 2024
14
TTR Submerged Crawler Technology
▪ Integrated Mining Solution Proven Design
▪ DeBeers & IHC Marine to Supply (Have Built 8 Crawlers over 20 Years Experience)
▪ DeBeers to Commission and Operate First 2 years (Option to Extend)
▪ DeBeers to Provide Local Training
• Technology & Skills Transfer to NZ
▪ Reduced Commissioning Risk for TTR
February 2024
15
TTR Trans Shipment & Export
▪ Iron Ore Concentrate Transferred to the FSO (Floating Storage Offloading) from IMV
▪ FSO Dewaters Ore
▪ FSO Tranships to Cape Sized Ore Carriers
▪ Cape Sized Vessel Delivers VTM Ore Concentrate to customers
▪ An Anchor Handling Tug (AHT) Assists with:
Anchor Moving, Provisioning, Refuelling and Safety Response
ORE TRANSFER
ANCHOR HANDLING TUG
February 2024
16
Taranaki VTM Project
New Zealand
Business Milestones
STB Iron Sands Project – What’s Next
• EPA Consents reissued
Q2 2024
• Metallurgical Tests and Marketing Report
Q3 2023
• Final Design & BFS
Q4 2024
• Finance USD$600m
.
A$250m
• Construction Contracts & Build
• Commission & First Production
Q1 2025
Q1 2025
Q3 2026 – Q4 2026
February 2024
17
Taranaki VTM Project
New Zealand
Development of STB Seabed Mineral Recovery Project is a
significant opportunity for New Zealand
Delivers essential and critical minerals for the shift towards net zero carbon
• World demand for VTM product, diversification of supply and
security of supply chains of critical minerals for western nations
• NZ will be a global leader in Seabed Mining including:
• Mineral recovery technology
• Marine environmental research, monitoring & permitting
• Potential to propel NZ to world’s third largest vanadium supplier
• Western world’s largest supplier vanadium at 20,000t V2O5
• STB operation will set a benchmark for seabed mining operations
• EEZ well regulated, has high environmental safeguards and protection
February 2024
18
Cobar Assets –
gold and silver
precious metal
assets in the
Cobar Basin
Mt Boppy Gold Project (100% owned)
Au
Restarted Mt Boppy screening project in May 2023
• Open pit mine (previously produced circa 500,000oz Au @ 15g/t Au)
• 42 person mining camp, power & water, administration office, exploration office
• Currently reprocessing tailings, ROM stockpiles and waste dump
• Mineral Resource update 160,100oz gold @2.01g/t*, currently awaiting results of
Sonic drill program over waste dump
• Fantastic exploration potential from Mt Boppy (beneath pit) and also Pipeline
Ridge etc
• Mt Boppy was previously one of the richest gold mines in NSW
Ag
Wonawinta Silver Project (100% owned)
• Total resource 38.3Mt @ 41.3g/t Ag & 0.54% Pb (containing 50.94M oz Ag, 207,200t Pb)**
• ~200,000t stockpile remaining – production halted January 2023
• 850,000t-1.0Mt.p.a. plant, mine camp and all necessary infrastructure
• Further confirmation of Cobar style Pb Zn Ag Wonawinta Deeps as announced 1 June
2021
• Exceptional exploration potential
*Refer ASX release dated 25 August 2023 ** Refer ASX release dated 1 April 2021
February 2024
19
Mt Boppy tenements – key exploration
programs 2023/24 financial year
2023/24 exploration activities are to be focussed on the
following:
Mt Boppy
Central Structural Zone
1. Pipeline Ridge
Targeting: add substantially to existing resource est.
(looking to add up to 210,000oz Au @2.4g/t Au)
Objective: evaluate for shallow oxide opencut gold, as
well as copper, zinc & lead underground options
Activity: in-fill, RC & DD
2. Mt Boppy (beneath recently mined pit shell)
Targeting: resource expansion within existing ML
Pipeline
Ridge
Objective: grow existing resource >100,000oz Au
Activity: combine RC and DD drill programs, targeting
mineralisation between 300m – 600m deep
February 2024
20
Manuka’s Gold and Silver Resource Base
On 25th August 2023 a Resource Update was announced for the Mt Boppy gold project.
On 1st April 2021 a Resource Upgrade was provided for Wonawinta Silver Project reflecting a 43% increase in the Measured and
Indicated Resource Categories.
Mineral Resource Summary 25 August 2023
Mt Boppy Resources
JORC Resources
Wonawinta Silver Project as at 1 April 2021*
Resource Category
Tonnes
Grade Au
(g/t)
Contained gold
ounces
Resource
Category
Material
(Mt)
Ag
(g/t)
Ag Moz
Pb
(%)
Pb kt
Measured
106,850
5.25
18,028
Measured
1.1
47.3
1.65
0.69
7.5
Indicated
605,200
3.01
58,500
Indicated
12.3
45.5
18.04
0.83
102.8
Inferred
1,770,355
1.47
83,608
Inferred
24.9
39
31.25
0.39
96.9
Total
2,482,405
2.01
160,100
Total
38.3
41.3
50.94
0.54
207.2
Stockpile
0.515
70
1.16
February 2024
21
Mt Boppy (past, present & future) Au
Mt Boppy produced 500koz @ 15 g/t from a very contained area
Manuka commenced production of Mt Boppy ores in April 2020 IPO estimated Phase 1
of 22-24koz Au (actual >41,000koz)
Higher grades + plant operating efficiencies combined to drive Phase 1 production to
nearly double original forecast*
Mt Boppy is open at depth with along-strike extensions to the South
Currently includes Measured** resource of ~107,000t @ 5.25g/t Au (18,020oz gold) as
well as an Indicated resource of 605,000t @3.01g/t Au (58,500oz gold)
Awaits Mt Boppy Deeps drill program (now planned to commence H1 2024)
Perspective view
looking southeast. West lode
is shown in
orange, east lode
shown in yellow
and current pit
design in blue,
and high-grade
zone (5 g/t Au)
shown in red.
Historical
workings are
shown in grey
•
Refer ASX releases dated 4 March 2022
•
**refer ASX release dated 19 May 2022
February 2024
22
Silver production at Wonawinta
• Wonawinta produced approx. 3.0Moz silver during 2012-2013,
and an additional 500,000oz silver in 2022
• Previously Australia’s largest primary silver producer
• JORC mineral resource estimate following extensive infill
drilling ~51M oz silver (also 207Kt Pb not included as silver
equivalent)
• Substantial plant capacity >850k-1.0m t/a (processed part of
the stockpiles in bottom photo on the right during 2nd half
2022 as a trial program, for recoveries of approx. 400,000oz
silver)
• Provides fantastic optionality for future silver production,
project fully permitted, plant and all infrastructure operational
February 2024
23
Share your feedback
Discover