Half Yearly Report and Accounts
Released
Released
Announcement PDF
Manuka Resources Ltd ABN 80 611 963 225
HALF YEAR REPORT 2023
31 December 2023 Interim Financial
Report
For the 6-month period ended 31 December 2023
Manuka Resources Ltd and its
controlled entity
ABN 80 611 963 225
Manuka Resources Ltd
For the half-year ended 31 December 2023
i
CORPORATE DIRECTORY
Directors
Dennis Karp – Executive Chairman
Alan J Eggers – Executive Director
Anthony McPaul – Non-Executive
Director
John Seton – Non-Executive Director
Key Management
Haydn Lynch – Chief Operating Officer
Company Secretary
Toni Gilholme
Registered Office
Level 4, Grafton Bond Building
201 Kent Street
Sydney NSW 2000
www.manukaresources.com.au
Lawyers
K&L Gates
Level 31, 1 O’Connell Street
Sydney NSW 2000
Auditor
Ernst & Young
200 George Street
Sydney NSW 2000
Share Registry
Automic Group Pty Ltd
Level 5, 126 Phillip Street
Sydney NSW 2000
Stock Exchange Listing
Manuka Resources Limited shares (Code:
MKR) are listed on the Australian
Securities Exchange.
Manuka Resources Ltd
For the half-year ended 31 December 2023
ii
Contents
Page
Directors’ Report
3
Auditor’s Independence Declaration
9
Consolidated Statement of Profit or Loss and Other Comprehensive Income
10
Consolidated Statement of Financial Position
11
Consolidated Statement of Changes in Equity
13
Consolidated Statement of Cash Flows
14
Notes to the Financial Statements
15
Directors’ Declaration
33
Independent Auditor’s Report
34
Manuka Resources Ltd
For the half-year ended 31 December 2023
3
Directors’ Report
The Directors of Manuka Resources Ltd (‘Manuka Resources’) present their report together with the financial
statements of the Entity or the Group, being Manuka Resources (‘the Company’) and its subsidiaries Mt Boppy
Resources Pty Ltd (‘Mt Boppy’) and Trans-Tasman Resources Ltd (TTR) for the six months ended 31 December
2023.
Director details
The following persons were Directors of Manuka Resources during or since the end of the financial period and
up to the date of this report:
•
•
•
•
Mr Dennis Karp
Mr Anthony McPaul
Mr John Seton
Mr Alan J Eggers
Review of operations and financial results
The past six months of operations focused on the recommencement of gold production operations at Mt
Boppy. There is a combined total of almost 4.0Mt of waste material and tailings sitting adjacent to the existing
Mt Boppy pit, and following an in-depth geological review, it was determined that the residual quantity of gold
contained within the material could be screened and then economically recovered though the Company’s
100% owned Wonawinta plant.
As advised previously, Manuka Resources welcomed Phil Bentley into the position of Chief Geologist a little
over 12 months ago. It is noteworthy that a significant portion of Phil’s career was based mining in Southern
Africa, focussed on low grade gold recoveries from waste dumps. This input was extremely valuable in assisting
the Company bring its Mt Boppy Screening Project into production over the second half of calendar 2023. The
initial production results were positive and we enjoyed increasing recoveries and sales over each of the
months comprising the September 2023 Quarter. The December Quarter was disappointing, albeit that
quarterly sales were higher than those in the previous Quarter. However, we weren’t able to maintain the
positive increases in production seen over the initial three months, largely due to a tapering off of the grades
of the ore processed, which was first noted during November. This proved to be extremely frustrating for all
concerned, as the Company’s preparation prior to commencement of mining was comprehensive. In light of
the reduced grades, we commenced a sonic drill program during the second half of November, to more fully
understand the zonal make-up of the dump and the extent and locations of the mineralised material
throughout the full waste dump and tailings. While our receipt of assays from the sonic drill samples submitted
to an independent laboratory have been delayed due to external operational matters outside our control, we
do expect full receipt by the middle of March. This will provide us with the opportunity to revise our mine plan
and determine optimal processing and recovery zones. This will be completed by Manuka Resources as a
priority. On-site processing and production has been suspended until receipt of the full suite of assay results
and revision of the mine plan.
On 7 March 2024, the recently elected NZ government introduced Fast Track Consenting (FTC) legislation into
parliament. This is discussed more fully below, but clearly any legislation which assists the final completion of
permitting for our Trans-Tasman Resources’ (TTR) Taranaki project would be extremely beneficial to Manuka
Resources and its shareholders.
Manuka Resources Ltd
For the half-year ended 31 December 2023
4
Taranaki VTM Project
In a significant and highly positive turn of events, the election of the new coalition government in New Zealand,
led by the National party and new PM Christopher Luxon, has dramatically altered the political landscape for
the country’s resource sector.
The Government’s initiatives in their coalition agreements include a ‘100 Day Plan’:
•
•
•
•
•
•
Updating the Crown Minerals Act to promote the use of Crown Minerals;
Creating a Critical Minerals list likely to include vanadium and titanium;
Prioritising regional and national projects of significance;
Amending the Resource Management Act (RMA);
A ‘fast track’ one stop shop consenting and permitting process for natural resource projects of national
significance; and
Investigate the strategic opportunities in New Zealand’s mineral resources, including vanadium, and
develop a plan to develop these opportunities.
The newly appointed Minister for Resources, Hon Shane Jones, is strongly supportive of the country’s mining
industry, in particular the development of offshore titanomagnetite iron sand and vanadium resources in the
South Taranaki Bight. Minister Jones stated1
“Seabed mining has a legitimate place in New Zealand’s regional economy.” and “Unless we use our natural
resources of our country, unless we maintain investment in our natural resource sector we won’t get the rare
earth minerals that are in New Zealand, we won’t keep the young people who are desperate to improve the
quality of their life in New Zealand – they’ll go to Australia to dig up Kalgoorlie and that’s something grossly
hypocritical about the green movement.2”
Manuka’s wholly owned subsidiary, Trans-Tasman Resources Limited (TTR), was granted Mineral Mining
Permit MMP55581 located 22km to 36km offshore in New Zealand’s South Taranaki Bight (STB) in 2014.
Expert reports have concluded the proposed VTM mineral recovery in STB will avoid material harm, will favour
caution and environmental protection in relation to the effects of the proposed mining operations and
resulting sedimentation on biota in the STB including no adverse ecological effects on marine mammals and
seabirds. Accordingly, there are no known aspects of TTR’s 2017 environmental Consents that are an
impediment to having them re-approved.
TTR intends to commission additional metallurgical test work to optimise the flowsheet for processing of the
VTM concentrate (including the recovery of vanadium and titanium) during 2024 and undertake marketing
(and related) studies building on work completed during the Pre-Feasibility Study (PFS).
The key attributes of the VTM Project are as follows:3
•
•
•
•
•
A 914Mt JORC Resource in MMP55581 Mine Area
Minimum 20 year Life of Mine
C1 costs approximately US$20 - US$24 / tonne of concentrate
VTM Concentrate Grade 0.5%V205, 8.5%Ti02 and 55% - 57%Fe
Total 3.2Bt STB JORC Resource Base
1 https://realitycheck.radio/shane-jones-nz-first-cabinet-minister-a-coalition-update-and-the-recent-policy-gains-for-nz-first/
2 Ibid
3 ASX release 1 August 2022
Manuka Resources Ltd
For the half-year ended 31 December 2023
•
5
60-year resource at 5Mtpa production rate
Globally VTM titanomagnetite iron sands are in strong demand as feed for electric arc furnaces (EAF) to
produce low carbon “green steel”. EAF steel making burns 50% less coal, reduces emissions by more than 45%
in the steel making process and sets the platform for meeting net zero goals by 2050.
The extraction and recovery of iron ore concentrate from the STB’s iron sand deposits will be one of the lowest
CO2 emitters for iron ore producers globally. Taranaki VTM will produce an estimated 62kg/t CO2 of emissions
compared to the international average of 125 to 250kg/t of concentrate.
Iron ore is critical to the clean energy transition, because steel is required in large quantities to build the wind
turbines and new transmission infrastructure the transition requires.
Vanadium, apart from its widespread application as a steel alloying element to strengthen steel and
reinforcing bar, is rapidly building demand as an electrolyte in vanadium redox flow batteries (VRFB) which
are fast becoming the preferred IP for large grid-scale high-capacity battery stations to store renewable energy
due to their longevity and fire safety characteristics, ahead of all competing technologies.
Australia is now building its first 850Mw, with 1,680Mwh capacity, VRFB Waratah Super Battery at the former
Munmorah coal fired power station in NSW to drive Australia’s transition to a low carbon economy.
With concerns over the sovereign security of vanadium supply from key producing nations China (comprising
55% of global production), Russia (20% of global production), Brazil (15%) and South Africa (10%), vanadium
now has “critical mineral” status in Australia, USA, Canada and the EU. The demand for VTM concentrate for
EAF low carbon green steel production together with the rapidly growing demand underpinning rising prices
for vanadium, suggests the potential of our Taranaki VTM Project, hosting one of the largest known vanadium
resources in the world with 1.6Mt contained V2O5 metal, will attract the competitive capital investment and
metal producer offtake interest required to develop the project.
The Taranaki VTM Project, when in production with an estimated annual production of 10,000 tonnes of
vanadium metal, will make Manuka one of the leading vanadium producers in the world and propel NZ into
the third largest producer of the metal after China and Russia.
Operating Summary
The loss for the consolidated entity for the half-year ended 31 December 2023 was $8,565,882 (2022 Loss:
$13,246,268). As at 31 December 2023, the consolidated entity had $551,195 in cash. The Company produced
4,332 ounces of Au during the half-year and sold at an average unhedged price of $AU3,006/oz.
Production summary
Tonnes Milled
Gold in Circuit
Silver Sold
Gold Sold
Gold Recoveries
Revenues
t
oz
oz
oz
%
AUD$’000
31 Dec 2023
136,728
316
23,900
4,625
70.1 %
14,458
Resource Growth and Exploration Outlook
During the period under review the Company’s geological team has continued to implement in part the
exploration work programmes established from the Q1 2023 Strategic Review. Planned drilling of Pipeline
Manuka Resources Ltd
For the half-year ended 31 December 2023
6
Ridge and Mt Boppy deeps was deferred to H1 2024. A sonic drilling program was completed on the Mt Boppy
waste dump, results from which will progress establishing the viability of future processing. The MKR Resource
Triangle (Fig. 1) shows the current classification of the exploration targets, and those in highlighted on which
work was undertaken during Q3 and Q4 2023.
Figure 1
The resource base at Mt Boppy outside of the in-pit resources continues to expand. The Mt Boppy waste
dump is estimated to contain approximately 3.92 Mt of variably mineralised waste rock and old tailings
material. Of this, between 1.6-1.9Mt is targeted as a screened product. A Sonic drilling programme was
completed on the Main Waste dump during December 2023 and results are still coming to hand and will be
reported next quarter. Twenty-six boreholes totalling 503m were drilled, and the whole core recovered
screened to -10, +10-22, and +22mm fractions, and fire assayed and bottle rolled to provide insitu and
recoverable gold grade estimates. The drilling programme will underpin the assessment of the economic
viability of the Main waste dump and the TSF3 tailings repository. Material has also been specifically sampled
for future metallurgical testwork.
Bulk sampling of the McKinnons low grade rock dumps has continued intermittently during the period under
review and are planned to be completed during the March 2024 quarter.
Other work programmes that have been progressed include:
• Continued geological modelling and assessment of historic drilling data of the Pipeline Ridge base metal –
gold deposit, assessment of available diamond core. The initial drilling programme is now scheduled
during calendar H1 2024;
• Follow up examination of targets generated from a detailed regional geophysics synthesis of the Mt Boppy
and Wonawinta ML’s and exploration tenements, including conducting a merged data reinterpretation of
all available magnetic data and a revised IP interpretation for the McKinnons gold prospect; and
• Continued analysis and reorganisation of the Company’s extensive drilling and geochemical sampling
database.
Drill programmes for 2024 have been scoped in-line with prioritisation of the targets on Figure 1 with
encouraging engagement with local drilling contractors for these activities. Exploration of the Pipeline Ridge
prospect and Mt Boppy mine deeps drilling are priority targets, and these activities are expected to start during
Calendar H1 2024.
Manuka Resources Ltd
For the half-year ended 31 December 2023
7
Significant changes in state of affairs
During the half-year there have been no significant changes in the state of affairs of the Group, but the
following events are noteworthy:
•
Further Extension of Secured Debt Facility
Since the end of the reporting period, the Company successfully negotiated to extend the term of the
secured debt facility to 30 September 2024. The extension has been granted on existing terms and rates
with no extension penalties or cash fees. The Company has resolved at a Board meeting held 19 September
2023 to grant the issue of 25Million options in four tranches with an exercise price based on the 5-day
VWAP plus a 10% premium.
•
Mt Boppy Resource Update4
The Company released a Mt Boppy Gold Project Resource Upgrade showing a 357% increase in contained
ounces. The mineral resource estimate for Mt Boppy is contained within:
- in situ rock dumps and tailings depositories, with in situ gold grades derived from bulk sampling
material derived from mechanically pitting and trenching to 2-3m depth and screening +200, 200+20, +8-20, and -8mm size fractions, with cone measurements to ascertain mass % distribution
and total volume treated.
- an open cut pit shell that reaches a depth of 215m below surface at the southern end of the Mt
Boppy deposit. Resources were reported July 2022 with respect to the current pit design.
Material within the pit design is reported at a 1.6 g/t Au cut off and material below the pit design
is reported to a 3.0 g/t Au cut off. The open cut is currently flooded and inaccessible for mining.
Dewatering and a sidewall pushback is necessary to access and mine these resources.
- a grade shell modelled at a 1.6 g/t cut off over the Boppy South mineral zone. This prospect still
requires final drilling and evaluation before assessing establishing a small opencast.
Resource Category
Tonnes
Grade
Contained gold
g/t Au
Troy ounces
Measured
107
5.25
18.0
Indicated
605
3.01
58.5
Inferred
1,770
1.47
83.6
Total
2,482
2.01
160.1
Table 6: Mt Boppy Resource Update per ASX release 25 August 2023
*The preceding statements of Mineral Resources conforms to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. Due to rounding to
appropriate significant figures, minor discrepancies may occur. All tonnages reported are dry metric.
•
Completion of Sonic Drill Program
A Sonic drilling programme was completed on the Main Waste dump during December 2023 and results
are still coming to hand and will be reported next quarter. Twenty-six boreholes totalling 503m were
drilled, and the whole core recovered screened to -10, +10-22, and +22mm fractions, and fire assayed and
bottle rolled to provide insitu and recoverable gold grade estimates. The drilling programme will underpin
the assessment of the economic viability of the Main waste dump and the TSF3 tailings repository.
Material has also been specifically sampled for future metallurgical testwork.
4 Refer ASX announcement dated 25 August 2023
Manuka Resources Ltd
For the half-year ended 31 December 2023
8
Events arising since the end of the reporting period
•
Share Placement and Share Purchase Plan (SPP)
On 7th February 2024 the Company successfully completed a Share Placement to new and existing
sophisticated investors to raise $3.178 million cash together with $3.089 million debt conversion to give a
total Placement of over $6 million5. $970,000 of the debt conversion is to Director related entities and will
be subject to approval by Shareholders at a General Meeting to be held on 2nd April 2024. In addition to
the Placement, the company completed a Share Purchase Plan on 26 February 2024. A total of $717,275
was raised by this SPP.
•
Conversion $3.089 million debt to equity
On 7th February 2024 as part of the successful Share Placement noted above, the Company negotiated
the conversion of $3.089 million in debt to equity. Of this amount $1.835 million related to the conversion
of a portion of the Company’s working capital facility into shares. Director related entities have agreed to
the conversion of $970,000 debt to equity (included in the $3.089 million above) which is subject to
shareholder approval at a meeting of shareholders scheduled to be held on 2 April 2024.
Apart from the matters noted above and as disclosed in the financial statements, there are no other matters
or circumstances that have arisen since the end of the period that has significantly affected or may significantly
affect either:
•
•
•
the entity’s operations in future financial years;
the results of those operations in future financial years; or
the entity’s state of affairs in future financial years.
Dividends
No dividends were paid or declared during the period and no recommendation is made as to dividends.
Auditor’s Independence Declaration
A copy of the Auditor’s Independence Declaration as required under s.307C of the Corporations Act 2001 is
included on the following page of this financial report and forms part of this Director’s Report.
Signed in accordance with a resolution of the Directors.
Dennis Karp
Director
Date: 14 March 2024
5 Refer ASX Announcement dated 7 February 2024 and amended Appendix 3B dated 26 February 2024
Ernst & Young
200 George Street
Sydney NSW 2000 Australia
GPO Box 2646 Sydney NSW 2001
Tel: +61 2 9248 5555
Fax: +61 2 9248 5959
ey.com/au
Auditor’s Independence Declaration to the Directors of Manuka Resources
Limited
As lead auditor for the review of the half-year financial report of Manuka Resources Limited for the
half-year ended 31 December 2023, I declare to the best of my knowledge and belief, there have
been:
a.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review;
b.
No contraventions of any applicable code of professional conduct in relation to the review; and
c.
No non-audit services provided that contravene any applicable code of professional conduct in
relation to the review.
This declaration is in respect of Manuka Resources Limited and the entities it controlled during the
financial period.
Ernst & Young
Siobhan Hughes
Partner
14 March 2024
A member firm of Ernst & Young Global Limited
Liability limited by a scheme approved under Professional Standards Legislation
Manuka Resources Ltd
For the half-year ended 31 December 2023
10
Consolidated Condensed Interim Statement of Profit
or Loss and Other Comprehensive Income
For the half-year ended 31 December 2023
Notes
31 December
2023
$
$
Sales revenue
5(a)
14,458,032
8,926,069
Cost of sales
6(a)
(17,992,997)
(16,456,776)
(3,534,965)
(7,530,707)
Operating profit / (loss)
31 December
2022
Other income
5(b)
260,122
385,225
Other expenses
6(b)
(2,209,733)
(5,309,258)
828,177
356,353
(4,656,399)
(12,098,387)
(3,909,483)
(1,147,881)
(8,565,882)
(13,246,268)
-
-
Foreign exchange gains / (losses)
Profit /(loss) before finance expenses
Finance expenses
6(c)
Profit / (loss) before income tax
Income tax expense
Profit / (loss) for the period attributable to
members of Manuka Resources Limited
(8,565,882)
Other comprehensive income / (loss)
Total comprehensive loss for the period
attributable to members of Manuka Resources
Limited
(13,246,268)
320,790
-
(8,245,092)
(13,246,268)
Loss per share for loss attributable to the
ordinary equity holders of the Company
Basic profit /(loss) per share (cents per share)
15
(1.54)
(4.61)
Diluted profit /(loss) per share (cents per share)
15
(1.54)
(4.61)
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2023
11
Consolidated Condensed Interim Statement of
Financial Position
As of 31 December 2023
31 December
2023
30 June
2023
$
$
Cash and cash equivalents
551,195
265,833
Trade and other receivables
10,948
685,660
1,042,981
2,307,345
97,510
404,429
Notes
Assets
Current
Inventories
7
Prepayments
Other financial assets
8
Total current assets
209,565
186,000
1,912,199
3,849,267
Non-current
Mine properties and development assets
9
639,680
638,743
Exploration and evaluation assets
10
36,315,654
35,200,653
Property, plant and equipment
11
15,321,098
15,879,924
Other financial assets
8
6,147,833
5,937,068
Total non-current assets
58,424,265
57,656,388
Total assets
60,336,464
61,505,655
Liabilities
Current
Trade and other payables
12
10,111,446
Provisions
13
712,789
643,823
64,528
968,646
27,507,088
24,524,576
471,110
147,233
Contract liabilities
Borrowings
14
Lease liabilities
Total current liabilities
38,866,961
7,138,892
33,423,170
Non-current
Provisions
13
7,857,703
7,773,532
28,813
111,807
14
221,170
255,172
Total non-current liabilities
8,107,686
8,140,511
Total liabilities
46,974,647
Net assets
13,361,817
Lease liabilities
Borrowings
41,563,681
19,941,974
Manuka Resources Ltd
For the half-year ended 31 December 2023
12
Consolidated Condensed Interim Statement of
Financial Position (continued)
As of 31 December 2023
Notes
31 December
2023
30 June
2023
$
$
58,178,807
57,038,387
4,766,565
4,242,049
360,950
40,160
Accumulated losses
(49,944,505)
(41,378,622)
Total equity
13,361,817
19,941,974
Equity
Share Capital
16
Share based payment reserve
Other reserves
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2023
13
Consolidated Condensed Interim Statement of
Changes in Equity
For the half-year ended 31 December 2023
Balance at 1 July 2022
Share Capital
Share-based
payment
reserve
Other
reserves
Accumulated
losses
Total equity
$
$
$
$
$
25,771,113
2,839,254
-
(15,036,602)
13,573,765
Loss for the period
-
-
-
(13,246,268)
(13,246,268)
Other comprehensive profit
Total comprehensive profit
for the period
Contribution of equity
-
-
-
-
-
-
-
-
(13,246,268)
(13,246,268)
29,766,053
-
-
-
29,766,053
Share based payments
(513,470)
975,065
-
-
461,595
Share issue costs
(261,542)
-
-
-
(261,542)
Reserves
-
-
(17,127)
-
(17,127)
Balance at 31 December
2022
54,762,154
3,814,319
(17,127)
(28,282,870)
30,276,476
Balance at 1 July 2023
57,038,387
4,242,049
40,160
(41,378,623)
19,941,973
Loss for the period
-
-
-
(8,565,882)
(8,565,882)
Other comprehensive loss
-
-
320,790
-
320,790
Total comprehensive loss
for the period
-
-
320,790
(8,565,882)
(8,245,092)
Contribution of equity
1,313,399
-
-
-
1,313,399
Share based payments
-
524,516
-
-
524,516
Share issue costs
(172,979)
-
-
-
(172,979)
Balance at 31 December
2023
58,178,807
4,766,565
360,950
(49,944,505)
13,361,817
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2023
14
Consolidated Condensed Interim Statement of Cash
Flows
For the half-year ended 31 December 2023
31 December
2023
31 December
2022
$
$
Receipts from customers
14,256,647
8,982,216
Payments to suppliers and employees
(15,001,051)
(14,826,247)
236,247
385,225
Operating activities
Other income
Finance costs paid
(320,813)
(66,346)
Net cash from/ (used in) operating activities
(828,970)
(5,525,152)
(6,808)
(597,410)
Investing activities
Acquisition of property, plant and equipment
Disposal of property, plant and equipment
-
224,068
Payments for development and exploration assets
(557,787)
(377,270)
Payment for other assets
(23,565)
-
Net cash used in investing activities
(588,160)
(750,612)
Repayments of borrowings
(2,491,141)
(1,556,673)
Proceeds from borrowings
3,425,980
3,857,094
Repayment of lease liabilities
(202,631)
(81,191)
Proceeds from issues of ordinary shares
1,047,500
4,110,00
Financing activities
Costs of issue of ordinary shares
(77,216)
(261,543)
Net cash from / (used in) financing activities
1,702,492
6,067,687
Net change in cash and cash equivalents
285,362
(208,077)
Cash and cash equivalents, at beginning of the
period
265,833
Cash and cash equivalents, at end of period
551,195
This statement should be read in conjunction with the notes to the financial statements.
1,160,615
952,538
Manuka Resources Ltd
For the half-year ended 31 December 2023
15
Notes to the Financial Statements
1
Nature of operations
The principal activities of Manuka Resources Ltd comprise of exploration, mine development, mining and
processing of silver and gold.
During the financial half-year ending 31 December 2023, the Company’s principal activities related to the
processing of mineralised gold material from Mt Boppy (Mt Boppy Stockpile Reprocessing) including bulk
sampling and screening and haulage of screened material. Field activities focused on a comprehensive review
of all exploration prospects and completion of a sonic drill programme. In addition, Trans-Tasman Resources
Limited has been progressing its EPA approvals for its Taranaki VTM project through the EPA’s Decision Making
Committee (DMC) process.
2
Basis of preparation
The interim consolidated financial statements of the Group are for the six months ended 31 December 2023
and are presented in Australian dollars ($), which is the functional currency of the parent company.
These interim condensed consolidated financial statements have been prepared in accordance with the
requirements of the Corporations Act 2001 and AASB 134 Interim Financial Reporting. They do not include all
the information required in annual financial statements in accordance with Australian Accounting Standards
and should be read in conjunction with the consolidated financial statements of the Group for the year ended
30 June 2023 together with any public announcements made during the half-year ended 31 December 2023.
The interim financial report has been approved and authorised for issue by the board of directors on 14 March
2024.
2.1
Going Concern
The financial report has been prepared on a going concern basis, which contemplates continuity of normal
business activities and realisation of assets and settlement of liabilities in the ordinary course of business.
During the six months to 31 December 2023, the Group generated operating loss of $8,565,882 (2022: Loss
$13,246,268) and negative operating cash flows of $828,970 (2022: ($5,525,152)). This was primarily driven
by high fixed production and operating costs at the Wonawinta plant and declining gold recoveries during
December 2023. In addition, the Group experienced a period of minimal sales during July and August 2023
whilst the Group recommenced mining and built up gold in circuit to recoverable levels.
As a consequence, at 31 December 2023 the Group had $551,195 of cash on hand and remained in a net
current liability position of $36,954,762 (30 June 2023: $29,573,903) due primarily to $27,507,088 in current
debt. The most significant loan balance amounts to $15,173,988 million which is repayable at 30 September
2024. In addition, the Company has a trade finance facility with rolling quarterly repayment requirements and
has other short term loans due to related parties and asset backed funding. In addition, at period end, the
Group had current payables of $10,111,445, many of which were long dated or past due.
Subsequent to year end, the Company successfully completed a placement to sophisticated investors and a
Share Purchase Plan for existing shareholders which together raised $3,894,725 million in cash and $3,088,938
Manuka Resources Ltd
For the half-year ended 31 December 2023
16
million of debt to equity conversion. Proceeds from the Offer have been used by the company to advance
regulatory approvals for the Taranaki VTM Project, progress studies at Mt Boppy and pay some of the long
dated creditors.
Additionally, the Group has been managing its cash position though the negotiation of payment plans with
creditors, the negotiation of loan repayment deferrals with lenders, and the use of an existing working capital
facilities to manage short term cash flow needs. Importantly, the majority of the current debt balance has
been successfully deferred, to a
Share your feedback
Discover