Area of existing mining permit MMP55581 now expanded by 375% to cover
243km2
•
MMP55581 now includes an additional permitted 967Mt of VTM resource yielding
a >200% increase in MMP55581’s VTM permitted resource to 1.88Bt VTM1.
•
Increase in permitted resource provides additional flexibility when optimizing the
Taranaki VTM Project mine plan, including scope for increased production rates.
•
Larger scale of permitted resource may also yield economies of scale, further
improving the financial returns of the Project (subject to BFS).
Manuka Resources Ltd (Manuka or the Company) is pleased to announce the receipt of approvals
from the New Zealand Government regulatory authority that have significantly expanded its mining
permit MMP55581, while additional approvals have improved the tenure of the Company’s permit
holdings in the Southern Taranaki Bright (STB) and thus significantly increased the potential scope
of the Taranaki VTM (vanadiferous titanomagnetite) iron sands project.
On 11 July, Manuka’s 100% owned subsidiary, Trans-Tasman Resources Limited (TTR), had its
extension of area application for granted mining permit MMP55581 approved by New Zealand
Petroleum and Minerals (NZPaM). The MMP55581 permit, expanded by 375%, now covers
243km2 (formerly 66km2) of the STB. 967Mt of the previously reported Maiden VTM Resource is
now within the increased MMP55581 permitted area which is in the Kupe South and Tasman South
Blocks and therefore yielding over 200% increase in reported VTM resource to 1.88Bt VTM2 in
MMP55581 (Figure 1 and Table 1).
Also on 11 July 2024, NZPaM granted TTR a four-year extension to the term of the 635km2 mineral
exploration permit, MEP54068, in the STB. MEP54068 covers an additional reported resource of
1.28Bt VTM3.
At an assumed BFS production rate for the first 20 years of 5mtpa VTM concentrate the Project is
expected to be positioned as a low-cost producer before consideration of vanadium or titanium metal
credits4. At the 5mtpa concentrate rate the annual production would also contain 25ktpa of vanadium
pentoxide (V2O5) making it one of the largest aspiring vanadium producers on the ASX. Specific
operating cost assumptions will be confirmed in the BFS
The increase in the JORC resource now covered by the granted mining permits is very positive. It
provides the Company with additional flexibility when optimizing its mine plan, plus scope for
increased production rates and extended tenure (subject to approvals).
1 See the ASX announcement of 1 March 2023 “Maiden Vanadium Resource at Taranaki VTM Iron Sand Project”
2 ibid
3
ibid
Refer the ASX announcement of 1 March 2023 “Maiden Vanadium Resource at Taranaki VTM Iron Sand Project”, and ASX
announcement of 1 August 2022 “Execution of Binding Term Sheet for the purchase of Trans-Tasman Resources Limited (TTR)”
4
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Figure 1: TTR Mineral Permits showing MMP555815 Containing 1.88 Billion Tonnes of VTM Resource
Taranaki VTM Resource Estimates Summary
Indicated and Inferred Mineral Resources
MEP54068 Inside 12Nm (RMA) Cut-Off Grade
Mt
Fe2O3% TiO2%
V2O5%
Cook North Block
3.5% DTR*
274
11.90
1.19
0.06
Kupe North Block
Tasman North Block
3.5% DTR*
7.5% Fe2O3
417
585
11.48
9.02
1.21
0.88
0.06
0.04
Total VTM Resource MEP54068
1,275
Resource contained with Mineral Mining Permit
10.44
1.05
0.05
Mt
21
DTR Concentrate
Fe%
TiO2%
57.19
8.12
V2O5%
0.52
31
57.07
8.35
0.51
MMP55581 Outside 12Nm (EEZ)
Cook South Block
3.5% DTR*
914
10.95
1.12
0.05
63
55.84
8.45
0.50
Kupe South Block
Tasman South Block
3.5% DTR*
7.5% Fe2O3
272
695
9.76
8.81
0.98
0.89
0.05
0.04
16
56.33
8.43
0.50
1,881
3,157
9.99
10.17
1.01
1.03
0.05
0.05
Total VTM Resource MMP55581
Taranaki VTM Resource Total
Table 1: Taranaki VTM Project Reported Mineral Resources and Concentrate Tonnage and Grades refer ASX
Announcement of 1 March 2023 “Maiden Vanadium Resource at Taranaki VTM Iron Sand Project”. Please
refer to Tables 2 to 6 on pages 10 and 11 of the ASX Announcement of 1 March 2023 “Maiden Vanadium
Resource at Taranaki VTM Iron Sand Project” for the individual resource estimates.
Alan Eggers, Manuka Executive Director and Chairman of the Taranaki VTM Project, commented:
“We are delighted to have received these licence approvals from NZPaM. In short, the potential
scope of our tier one world class VTM Project has increased. In particular, the doubling of the portion
of our reported VTM resource covered by the granted mining permit provides us with greater mining
flexibility, an extended life of mine and potential to scale up annual concentrate production. The larger
resource available may also yield economies of scale, further improving the financial returns of the
Project and more attractive offtake agreements for the concentrates – aspects that will be optimized
as the BFS progresses.”
5 As at 11 July 2024
Page | 2
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. 02- 7253 2020
Media Contact
Ben Henri
M+C Partners
Tel. 0473 246 040
About Manuka
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration company with key gold
and silver assets located in the Cobar Basin, central west New South Wales and offshore vanadium
bearing iron sands in the South Taranaki Bight of New Zealand. These projects include:
The Mt Boppy Gold Mine (Cobar Basin, NSW)
The Mt Boppy gold mine is located 43 km east of Cobar, in the Central West region of New South Wales.
The current Mt Boppy Mineral Resource 6 is estimated at 4.3Mt at 1.19 g/t Au and comprises a mix of
oxidised and transitional/fresh in-ground mineralisation, mineralised rock dumps and mineralised tailings.
The Company has to date processed its stockpiles and gold mineralised waste product through its
Wonawinta plant. Manuka are currently pursuing a strategy of establishing of a fit-for-purpose, on-site
crush-screen-mill-float facility to enhance the economics of the Mt. Boppy Mine and the value of nearmine prospects. The Mt Boppy site includes a 48-person mine camp and is fully permitted for the
proposed processing plant and on-site production.
Mt Boppy Gold mine
The Wonawinta Silver Mine (Cobar Basin, NSW)
Previously Australia’s largest primary silver producer, Wonawinta produced approximately 3 million
ounces of silver during 2012-2013, and an additional 500,000oz of silver in 2022. The mine hosts a
significant Resource7 - including stockpiles and shallow oxide material, Wonawinta contains total
Resources of 38.8 million tonnes at 42 g/t Ag for 52.4 million ounces. Within this there is a higher-grade
component of 4.5 million tonnes at 97 g/t Ag for 14 million ounces. The Wonawinta processing plant has
a nameplate capacity of approximately 850,000 tpa. The Company is reviewing the potential of
recommencing operations at Wonawinta, taking advantage of the strengthening silver price environment.
6 ASX release 16 April 2024
7 ASX release 1 April 2021
Page | 3
Wonawinta Silver Mine and Plant
The Taranaki VTM Project (South Taranaki Bight, New Zealand)
Manuka is the 100% owner of the Taranaki VTM (vanadium titanomagnetite) Iron Sands Project. The
Project production profile sits in the lowest quartile of the iron ore production cost curve.
The Taranaki VTM Project comprises a 3.2Bt Resource8 at 10.17% Fe2O3, 1.03% TiO2 and 0.05% V2O5
(containing 1.6Mt V2O5) ranking it as one of the largest drilled vanadium projects globally. The Project’s
granted mining permit, MMP55581, is located 22 km to 36 km offshore in New Zealand’s Exclusive
Economic Zone (EEZ), outside the 12 nautical mile limit from the shoreline, in waters ranging between
20 to 50 metres depth. Current prefeasibility study (PFS) mine plan can deliver production of 5Mt export
concentrates a year grading 56-57%Fe, 0.5%V2O5 and 8.5%TiO2. On granting of final government
approvals to operate the Company will complete its Bankable Feasibility Study (BFS) on the Project.
Compliance Statements
The information in this announcement that relates to previously reported Exploration Results, Exploration Targets,
Mineral Resources, Ore Reserves, Production Targets and Financial Forecasts is extracted from the Company’s
ASX announcements and are available to view on the Company’s website. The Company confirms that it is not aware
of any new information or data that materially affects the information included in the original announcements and, in
the case of estimates of Mineral Resources and Ore Reserves, that all material assumptions and technical
parameters underpinning the estimates in the relevant announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially altered.
Important Information
This report includes forward-looking statements and comments about future events, including the Company’s
expectations about the performance of its businesses. Forward-looking words such as “expect”, “should”, “could”,
“may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other similar expressions are intended to
identify forward-looking statements. Such statements involve known and unknown risks, uncertainties, assumptions
and other important factors, many of which are beyond the control of the Company and which may cause actual
results, performance or achievements to differ materially from those expressed or implied by such statements.
Forward-looking statements are provided as a general guide only and should not be relied on as an indication or
guarantee of future performance. Given these uncertainties, recipients are cautioned to not place undue reliance on
any forward-looking statement. Subject to any continuing obligations under applicable law, the Company disclaims
any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in this report
to reflect any change in expectations in relation to any forward-looking statements or any change in events, conditions
or circumstances on which any such statement is based. No Limited Party or any other person makes any
representation, or gives any assurance or guarantee that the occurrence of the events expressed or implied in any
forward-looking statements in the report will occur.
8ASX release 1 March 2023
Page | 4
Share your feedback
Discover