Mt Boppy Gold Project Exploration Update
Released
Released
Announcement PDF
ASX Announcement
28 April 2026
ASX: MKR
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
MT BOPPY GOLD PROJECT EXPLORATION UPDATE
Highlights
• Three RC collared diamond holes targeting depth and strike extension zones of
Mt Boppy-style mineralisation completed
• Results returned localised low-grade gold intersections, consistent with early-
stage testing
• Sulphide mineralisation intersected, including up to 46g/t Ag
• Structural interpretation has refined targeting for follow-up drilling
• Pipeline Ridge gold resource definition drilling now commenced
• Exploration supports future gold growth alongside near-term production restart
Manuka Resources Limited (“Manuka” or the “Company”) confirms that the initial phase of
exploration diamond drilling at its Mt Boppy gold project (as outlined on 6 November 2025), has
been completed. Final pXRF multi element analyses and structural modelling are in progress.
Mt Boppy has historically produced ~500,000oz Au at an average grade of ~15g/t Au from a
combination of early underground mining (circa 1900-1950’s) and more recent open pit
operations (1995-2021). The current programme comprised three diamond drill holes targeting
potential depth and strike extensions of known mineralisation.
While results returned localised low-grade gold intersections, the programme has delivered
important geological and structural insights, improving the Company’s understanding of
structural controls and refining targeting for future work.
Executive Chairman Dennis Karp said:
“We acquired Mt Boppy in 2019 and until now, have not had the opportunity to test the
depth and strike extensions of the existing gold system. These are the first deeper drill
holes completed since acquisition and represent an important step in advancing our
understanding of the broader deposit.
While these were early-stage scout holes, they have provided valuable structural insights
and helped refine our targeting. The results are already directing our focus toward priority
zones to the south-east of the current pit for follow-up drilling.
Importantly, this work is being undertaken alongside our near-term production restart,
with the focus firmly on delivering first production later this quarter, followed by growing
gold and, subsequently, silver contributions over time. Our confidence remains that Mt
Boppy sits within a larger mineralised system consistent with the Cobar Basin.”
Page | 2
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Mt Boppy Drilling Programme
Exploration Results to date (Figures 1-8)
Figure 1: General locality of drilling targets
Page | 3
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 2: Locality of 3 diamond holes
The initial three-hole diamond drill holes (MSDD001, 004, 005) were designed to target potential
southern strike and depth extensions of the Mt Boppy gold mineralisation at depths of approximately
300–500 metres.
The drill holes were located between 300m and 1,000m to the south of the current Mt Boppy open
pit (Figure 2), targeting mineralised zones up to 200-300m in strike length and up to 30m wide.
Key outcomes from the programme include:
- Limited development of Boppy style brecciated zones within the tested areas;
- The extension of strongly mineralised quartz breccia mineralisation at the southern end of
the current open pit has been truncated by a NW-SE structure that may have continuity to
the Boppy South gold deposit;
- The western bounding fault is now interpreted to have been reactivated and truncates/
displaces the main Mt Boppy gold orebody on the west side;
- Previous drillhole PMS 129 intersected 27m @ 1.28g/t from 72m to the west of Mt Boppy
open pit and will be the focus now for further drill evaluation
While no significant high-grade gold zones were intersected in this phase, the programme has
materially improved geological understanding and targeting confidence for subsequent drilling.
Page | 4
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Pipeline Ridge Gold Project – Resource Definition Drilling
Resource definition drilling at the Pipeline Ridge gold project commenced on 24 April 2026,
targeting shallow oxide gold mineralisation suitable for open pit extraction.
The Pipeline Ridge project is located approximately 28km south of the Mt Boppy gold mine
within the Company’s broader Cobar Basin footprint.
• ~3,165m RC drilling programme (to ~60m depth) underway
• Exploration target: 187kt–365kt @ 1.1–1.5g/t Au
• Objective to deliver a maiden gold resource in 2026
Pipeline Ridge represents a near-term opportunity to supplement gold feed into the Wonawinta
processing plant.
Future work
The exploration programme will continue with the following priority activities:
1 Ongoing Pipeline Ridge RC drilling – targeting shallow open pit gold mineralisation.
2 Mt Boppy Exploration depth and strike extensions will move to testing shallow (0-150m) deep
satellite deposits (Figure 3).
Initial exploration targets are estimated at ~30-40koz of shallow, open pit gold mineralisation,
based on historic drilling and current work - Table 1 provides indications of follow up Mt Boppy
targets from historic drilling.
Strategic Context
While Manuka’s immediate focus remains the restart of silver production at its Wonawinta
processing plant in Q2 2026, the current exploration programmes are directed towards building
out a broader Cobar Basin production platform.
The Company’s strategy is underpinned by a 10-year production plan, centred on the
Wonawinta processing facility and incorporating multiple gold and silver feed sources across its
regional asset base. This approach is focused on:
• increasing near-term gold feed into the plant
• extending mine life beyond the current plan
• identifying additional satellite deposits within trucking distance
Over time, this positions Manuka to transition from a single-asset restart to a multi-source
production system, supporting sustained production and cash flow growth.1,2
1
ASX Release 30 May 2025
2
ASX Release 5 August 2025
Page | 5
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 3: Mt Boppy-Canbelego satellite shafts and prospects
Page | 6
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Table 1: Mt Boppy-Canbelego satellite shaft targets and historic drilling intersections
Page | 7
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Production Timetable and Milestones
Manuka continues to progress through the final execution phase toward first production, with
key milestones outlined below:
Completed
✅ Refinancing secured
✅ All major approvals in place and in good standing
✅ Care & maintenance phase completed
✅ Key on-site management team and workforce secured
✅ Processing equipment upgrades (deslime / dewatering circuit) ordered
✅ Gold ore haulage from Mt Boppy underway
June 2026
quarter
Reserve upgrade and revised mine-plan at Wonawinta (May 2026)
ROM gold material stockpile continues to build at Wonawinta
Commissioning and ramp-up of silver and gold-bearing ROM stockpiles
First gold processing commences (May/June)
Sept 2026
quarter
☐ Plant upgrade and refurbishment to production-ready state
☐ First silver production and sales
☐ Commencement of mining silver ores
☐ Ramp-up to nameplate production
☐ Steady state production and cash flow generation
This announcement has been approved for release by the Board of Directors of Manuka
Resources Limited
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. 02 7253 2020
admin@manukaresources.com.au
Page | 8
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
ANNEXURE 1: Mt Boppy diamond drill plans and cross sections
Figure 4: Locality of Mt Boppy extension boreholes completed to date
Figure 5: Mt Boppy Southern extension Phase 1 conceptual drill targets and actual
boreholes N-S section
Page | 9
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 6: MSD001 Cross section looking north
Figure 7: MSD004 Cross section looking north
Page | 10
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 8: MSDD005 Cross section looking north
.
ANNEXURE 2: Pipeline Ridge Gold Project
The Pipeline Ridge prospect is a volcanic massive sulphide (“VMS”) style deposit located
approximately 28km south of Mt Boppy. The prospect historically has attracted a number of
phases of exploration drilling (totalling 6,590m DD; 6,079m RC and 4,832m RAB or Air Core).
Evaluation of the various drilling campaigns (some were for base metals and others gold) has
delineated a structurally controlled zone of shallow gold mineralisation.
Two zones of gold mineralisation (295m & 180m strike) locate within a larger ~1,000m strike
length with intersections occurring down to over 150m depth (Figure 3) have been delineated.
The Phase 1 drilling at Pipeline Ridge is designed to delineate shallow (60m deep) free-milling
gold oxide resource for potential open pit extraction, with Phase 2 drilling follow up evaluation
of the deeper gold mineralisation.
Page | 11
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 9 above: (Left) Pipeline Ridge phase 1 drill collars (Blue) with gold intersections
in relationship to north and south oxide open pit target zones. (Right) View looking north
showing distribution of deeper gold mineralisation relative to shallow oxide target zones
Compliance Statements
The information in this announcement that relates to previously reported Exploration Results, Exploration
Targets, Mineral Resources, Ore Reserves, Production Targets and Financial Forecasts is extracted from
the Company’s ASX announcements and are available to view on the Company’s website. The Company
confirms that in the case of estimates of Mineral Resources and Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant announcement
continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not been materially altered.
Important Information
This report includes forward-looking statements and comments about future events, including the
Company’s expectations about the performance of its businesses. Forward-looking words such as
“expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other
similar expressions are intended to identify forward-looking statements. Such statements involve known
and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company, and which may cause actual results, performance or achievements to differ
materially from those expressed or implied by such statements. Forward-looking statements are provided
as a general guide only and should not be relied on as an indication or guarantee of future performance.
Given these uncertainties, recipients are cautioned to not place undue reliance on any forward-looking
statement. Subject to any continuing obligations under applicable law, the Company disclaims any
obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in
this report to reflect any change in expectations in relation to any forward-looking statements or any
change in events, conditions or circumstances on which any such statement is based. No Limited Party
or any other person makes any representation or gives any assurance or guarantee that the occurrence
of the events expressed or implied in any forward-looking statements in the report will occur.
Share your feedback
Discover