High Grade Gold Drill Intersections from Pipeline Ridge
Released
Released
Announcement PDF
ASX Announcement
10 September 2026
ASX: MKR
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
OUTSTANDING GOLD DRILL INTERSECTIONS FROM THE
PIPELINE RIDGE PROJECT
Including 32m at 7.98g/t Au from 34 metres
Highlights
• Manuka Resources has received high-grade gold assays from its initial Pipeline
Ridge RC drilling programme
• The assays received are from the completed 56-hole, 3,133 m RC drilling
programme at Pipeline Ridge
• Selected shallow high-grade gold drill intersections include:
PRRC054: 32m @ 7.98 g/t Au from 34 m
PRRC007: 8m @ 12.96 g/t Au from 37m
PRRC035: 5m @ 8.59 g/t Au from 37m
PRRC008: 10m @ 2.89 g/t Au from 24m
• Historic and current drilling indicates that the Pipeline gold mineralised zones
are open in all directions, including at depth, across section to the east and west
and along strike both to the north and the south
• First pass Pipeline Ridge gold mineral resource estimation will now be
undertaken based on these positive drill results
• Manuka’s exploration results support future gold resource growth alongside
near-term production restart now underway at Wonawinta
• Further drilling is planned for October 2026 to test extensions at depth, across
section and along strike
Manuka Resources Limited (“Manuka” or the “Company”) is pleased to report high-grade assay
results from its recently completed drilling programme at the Pipeline Ridge Project, located
28km south of Canbelego (and the Mt Boppy Gold Mine site; Figure 1) within its Cobar Basin
operations.
The drilling has returned multiple high-grade, shallow gold intersections across the Pipeline
Ridge prospect, validating the northern and southern zones of mineralisation targeted by the
program. Mineralisation remains open at depth, across section and along strike to both the north
and south.
Importantly, Pipeline Ridge is being evaluated as a potential future satellite gold deposit within
trucking distance of Manuka’s Wonawinta processing facility (120km away), where gold
processing has recently recommenced using Mt Boppy ore. Pipeline Ridge therefore has the
potential to provide an additional source of gold feed as Manuka builds a broader, multi-source
precious metals production platform across its Cobar Basin assets.
Receipt of these gold drill assays enables Manuka to commence its maiden Mineral Resource
Estimate (“MRE”) for Pipeline Ridge, subject to completion of modelling, validation and
Competent Person review planned for release in 2026. Further drilling is now planned to
Page | 2
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
commence in October 2026 to test extensions of the mineralisation at depth, across section and
along strike.
Executive Chairman Dennis Karp said:
“These are exceptionally encouraging results from shallow RC drilling at our Pipeline Ridge
project and confirm the potential to generate future gold resources for treatment either at
Wonawinta or Mt Boppy.
Importantly, this precious and base metal exploration is being undertaken alongside
Manuka’s production restart, which will deliver first revenues from the processing of Mt
Boppy gold bearing stockpiles this quarter.1
Our confidence remains that Mt Boppy sits within a larger mineralised system consistent
with Manuka’s broader Cobar Basin Project. Pipeline Ridge, which is located just 28km
south of Mt Boppy, appears to be confirming this conviction.
Manuka plans to release a maiden resource estimate (MRE) for Pipeline Ridge in 2026
which will be an exciting step towards adding to its future gold resources and production
profile. Further drilling is planned for Pipeline Ridge later in October 2026.”
Project Background
Pipeline Ridge is located 28km south of Canbelego (and the Mt Boppy Gold Mine site; Figure
1) and has attracted historic exploration dating back to the 1970’s. Pipeline Ridge is a
polymetallic Cu-Pb-Zn and Au deposit with volcanic massive sulphide (“VMS”) affinities. The
current drilling has targeted a later stage phase of gold mineralisation that appears mostly
controlled by brecciation within volcanic tuff host rocks. Historic drilling (Table 1) has tested
both base metal and gold mineralization, and totals 195 drillholes for 13,237m.
Figure 1 Locality of Pipeline Ridge
1
ASX Announcement: Gold Production Restarts at Wonawinta 21 August 2026
Page | 3
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Table 1: Pipeline Ridge historical drilling
The locality of these drilling collars is shown in Figure 2, and comprises
- 72 Rotary Air Blast (“RAB”), Aircore (“AC”) and Percussion (“PC”) drillholes for 3,071m;
- 94 Reverse Circulation Percussion (“RC”) drillholes for 4,240m; and
- 29 Diamond (“DD”) drillholes for 5,926m.
The current drilling has involved 56 RC drillholes for 3,133m, along 17 heel-toe lines (Figure 2).
The prime focus of the drilling has been validation and infill of historic drilling, and delineation of
mineral resources over a zone striking 350m to a depth of 60m.
Page | 4
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 2: Historic and current collar location for MKR Pipeline Ridge drilling with indicated g/t x
m gold (g/t Au) content.
The RC drillholes were sampled each metre, and Fire Assays (50g) completed at SGS Orange
Laboratory. Collar information, assay intersections using a 0.25g/t Au cut-off and representative
cross sections are given in Annexure 2. Highlighted intersections with Au content greater than 10
g/t x m Au are shown below in Table 2.
Page | 5
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Table 2: Pipeline Ridge highlighted intersections
The current drilling programme has validated the northern and southern target zones of gold
endowment, as well as demonstrating that the mineralised zone is open in all directions, including
at depth, across section and both to the north and south. A second phase of RC and diamond drilling
is planned which will test both the near surface extensions to 100m depth, (potentially, subject a
MRE being completed, supporting a 100m open cut) as well as along strike north and south of the
current drilling.
Future exploration and assessments at Pipeline Ridge will involve:
- more detailed analysis and construction of a geological model, an alteration model
based on pXRF analyses on each metre drilled, progressing to block modelling and
mineral resource estimation;
- bottle roll testwork of a suite of samples, which will give indicative estimations of the
amenability of the mineralisation to cyanide leaching; and
- six diamond core drillholes are also scheduled to enable collection of representative
material for diagnostic leach metallurgical testwork; and
RC drill samples to undergo hyperspectral scanning at the NSW Geology unit at Londonderry,
which will provide mineralogical data to be integrated with the pXRF multielement database and
support the MRE.
Page | 6
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Strategic Context
While Manuka’s immediate focus remains on the restart of precious metals production at its
Wonawinta processing plant in Q3 2026, the current exploration programmes are directed
towards building out a broader Cobar Basin Project production platform.
The Company’s strategy is underpinned by a 10-year production plan, centred on the
Wonawinta processing facility and incorporating multiple gold and silver feed sources across its
regional asset base.2
This approach is focused on:
• increasing near-term gold feed into the plant;
• extending Wonawinta silver mine life beyond the current plan;
• identifying additional satellite gold and silver deposits and resources within trucking
distance of Wonawinta and or commissioning a gold treatment facility at Mt Boppy.
Successful exploration could increase future operating flexibility. There is no certainty that
exploration will result in a Mineral Resource or future mining operation.
This announcement has been approved for release by the Board of Directors of Manuka
Resources Limited
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. 02 7253 2020
admin@manukaresources.com.au
Compliance Statements
The information in this announcement that relates to previously reported Exploration Results, Exploration
Targets, Mineral Resources, Ore Reserves, Production Targets and Financial Forecasts is extracted from
the Company’s ASX announcements and are available to view on the Company’s website. The Company
confirms that in the case of estimates of Mineral Resources and Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant announcement
continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not been materially altered.
Important Information
This report includes forward-looking statements and comments about future events, including the
Company’s expectations about the performance of its businesses. Forward-looking words such as
“expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other
similar expressions are intended to identify forward-looking statements. Such statements involve known
and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company, and which may cause actual results, performance or achievements to differ
2
ASX Announcement of 23 March 2026
Page | 7
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
materially from those expressed or implied by such statements. Forward-looking statements are provided
as a general guide only and should not be relied on as an indication or guarantee of future performance.
Given these uncertainties, recipients are cautioned to not place undue reliance on any forward-looking
statement. Subject to any continuing obligations under applicable law, the Company disclaims any
obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in
this report to reflect any change in expectations in relation to any forward-looking statements or any
change in events, conditions or circumstances on which any such statement is based. No Limited Party
or any other person makes any representation or gives any assurance or guarantee that the occurrence
of the events expressed or implied in any forward-looking statements in the report will occur.
Competent Person
The information in this report that relates to Pipeline Ridge exploration drilling and exploration targets is
based on, and fairly represents, information and supporting documentation prepared by Mr Philip Bentley,
who is a Certified Professional by The South African Council for Natural Sciences (SACNASP #
400208/05 ) and is the Chief Geologist employed by Manuka Resources Ltd. Mr Bentley has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Bentley consents to the inclusion in the statement of the matters based on his information in the form and
context in which it appears
ANNEXURE 1 – JORC 2012 TABLE 1
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria JORC Code Explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed
information.
• Diamond Drilling
• A portion of the data used for
exploration and evaluation of the
Pipeline Ridge project has been
gathered from diamond core. PQ,HQ
and NQ core sizes have been used
historically at the Pipeline Ridge
prospect. This core is geologically
logged and subsequently halved for
sampling.
• Reverse Circulation (RC) Drilling
• Drill cuttings are extracted on a one
metre basis from the RC return via
cyclone. Representivity of sampling is
achieved from either
- a 3-bag rotational sampler
• Approximately three kilograms of the
recovered material is bagged into calico
bags for analysis. Sample material is
submitted for gold analysis by 50g Fire
assay. pXRF measurements are taken
every metre drilled.
• Residual material may be retained on
the ground near the hole till evaluation
is complete. Composite samples may be
obtained from the residue material for
Page | 8
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
initial analysis, with the split samples
remaining with the individual residual
piles until required for re-split analysis
or eventual disposal.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.) and
details (e.g. core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc.).
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Diamond Drilling
• Diamond drilling involves the coring of
rock by a rotating diamond bit, which
cuts through rock and emplaces the
core in a variable 1.5-commonly 3m –
6m core barrel located immediately
behind the bit. The core barrel is
retrieved at the discretion of the driller
(e.g. depending on ground conditions)
or when it is full. The core can be
marked to provide orientation data of
bedding or structures etc. Double barrel
and triple tube (in difficult ground to
protect washout of core) core barrels
are used for diamond drilling.
• RC Drilling
• Down hole rock cuttings are generated
by a down-the-hole (DTH) rotating
hammer bit, which breaks and
pulverises the rock, which under high air
pressure is passed up the inner tube and
extracted from the RC return via
cyclone. Normally material is sampled
on a 1 metre basis (see above).
Drill sample
recovery
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
• All geology input is logged and validated
by the relevant area geologists,
incorporated into this is assessment of
sample recovery. No defined
relationship exists between sample
recovery and grade. Nor has sample bias
due to preferential loss or gain of fine or
coarse material been noted.
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
• The total length and percentage of the relevant
intersections logged
• Manuka surface diamond drill-holes are
all orientated and have been logged in
detail for geology, veining, alteration,
mineralisation and orientated structure.
Core has been logged in enough detail
to allow for the relevant mineral
resource estimation techniques to be
employed.
• Surface core is photographed both wet
and dry. All photos are stored on the
Company’s servers, with the
photographs from each hole contained
within separate folders.
• RC chips are geologically logged.
• Logging is quantitative in nature.
• All holes are logged completely.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of
the material being sampled.
• RC – Pulverised material is sampled from
either a 3 tier riffle splitter or 3 sample
rotating splitter (producing 3 - 5kg
sample). Samples are generally dry.
• Diamond Drilling - Half-core niche
samples, sub-set via geological features as
appropriate.
• Chips / core chips undergo total
preparation.
• Samples undergo fine pulverisation of the
entire sample by an LM5 type mill to
achieve a -75µm product prior to splitting.
• QA/QC is currently ensured during the sub-
sampling stages process via the use of the
systems of an independent NATA / ISO
accredited laboratory contractor.
• The sample size is considered appropriate
Page | 9
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
for the grain size of the material being
sampled.
• The un-sampled half of diamond core is
retained for check sampling if required. For
RC chips
• regular field duplicates are collected
and analysed for significant variance to
primary results.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
• Recent drilling was analysed by fire
assay and pXRF,
• The current drill programme will be
analysed by pXRF, and sample prep and
gold analyses by Fire assay analysis at
SGS Orange.
• All gold diamond drilling samples
submitted for assay include at least one
blank and one Certified Reference
Material ("CRM") per batch, plus one
CRM or blank every 20 samples. In the
case of samples with observed visible
gold mineralization, a coarse blank is
inserted after the visible gold
mineralization to serve as both a coarse
flush to prevent contamination of
subsequent samples and a test for gold
smearing from one sample to the next
which may have resulted from
inadequate cleaning of the crusher and
pulveriser. The lab is also required to
undertake a minimum of 1 in 20 wet
screens on pulverised samples to ensure
a minimum 85% passing at -75µm. No
significant QA/QC issues have arisen in
recent drilling results.
•
• Historical drilling has used a combination
of Fire Assay, and Aqua Regia / AAS
analysis.
• These assay methodologies are
appropriate for the resources under
evaluation.
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical and
electronic) protocols.
• Discuss any adjustment to assay data.
• Currently no independent or alternative
verifications are available.
• There have been no twinned holes
drilled on the Pipeline Ridge projects.
• Primary data will be collected utilising
LogChief. The information is imported into
a Datashed5 (SQL database server) and
verified.
• All data used in the calculation of
resources and reserves are compiled in
databases which are overseen and
validated by senior geologists.
• No adjustments have been made to any
assay data.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• All data is spatially oriented by survey
controls via direct pickups by the
exploration team using either handheld
GPS or Differential GPS. Drillholes are all
surveyed downhole, deeper holes with a
Gyro tool if required, the majority with
single / multishot cameras.
• All drilling and resource estimation (if
applicable) is preferentially undertaken
in the UTM grid system at the various
sites.
• Topographic control is generated from a
combination of remote sensing methods
including Drone and LIDAR surveys and
ground-based surveys. This
methodology is adequate for the
Page | 10
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
resources in question.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Data spacing is variable dependent upon
the individual orebody under
consideration. A lengthy history of
mining has shown that this approach is
appropriate for the Mineral Resource
Estimation process and to allow for
appropriate classification of the
resources.
• In the first instance no compositing is
undertaken. If applied it is carried out
based upon the modal sample length of
each individual domain.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if
• material.
• Drilling intersections are nominally
designed to be normal or close to normal
to the mineral zones as far as geological
controls allow.
• It is not considered that drilling
orientation has introduced an
appreciable sampling bias.
Sample
security
• The measures taken to ensure sample security. • Manuka exploration samples are
assayed off-site, and samples are thus
delivered to a third-party transport
service, who in turn relay them to the
independent laboratory contractor.
Samples are stored securely until they
leave site.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data
• Audits and reviews on sampling
techniques have been undertaken on
previous resource estimations for the Mt
Boppy mine, with no significant flaws.
SECTION 2: REPORTING OF EXPLORATION RESULTS
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code Explanation Commentary
Mineral tenement and land
tenure status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• The MKR tenements are held by Mt Boppy
Resources Pty Ltd., a wholly owned
subsidiary of Manuka Resources Ltd.
• The current drilling exploration targets
locate on EL 5842.
• Native title interests are recorded against EL
5842 in the Mt Boppy Mine area.
• There are no third-party royalties on EL
5842 at present.
• The tenure is currently in good standing.
• There are no known issues regarding security
of tenure.
• MKR operates in accordance with all
landholder access and environmental
conditions set down as conditions for
grant of the lease.
Exploration done by other
parties
• Acknowledgment and appraisal of exploration by other
parties
• Historic exploration is acknowledged by
Golden Cross, Homestake, CPMS, and
Polymetals.
Geology • Deposit type, geological setting and style of mineralisation.
Pipeline Ridge
• The Pipeline Ridge Au-Cu-Pb-Zn deposit in
the Cobar District of central New South
Wales is contained within the Sarona
Downes tuff member of the Kopyje Shelf, 20
km southeast of the town of Canbelego. The
Page | 11
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
subregional geological setting locates the
deposit adjacent to the Coonara Fault, which
is part of a north-northwest striking terrane
termed as the Canbelego-Mineral Hill
volcanic belt.
• The prospect is marked by extensive
hydrothermal alteration in the form of
sericitisation and chlorite alteration
emplaced on volcanics with an alkali-rich (A-
type) affinity. The deposit appears a
combination of an early Kuroko-style VMS
deposit associated with the initial eruption of
felsic volcanics in a marine environment,
with a later intermediate sulphidation
epithermal overprint, characterized by the
strong hydrothermal alteration with
chalcedonic, coliform and vuggy quartz
veining.
Drill hole Information • A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
• Provided in Annexure 3
Data aggregation methods • In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g., cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• All results presented are length weighted.
• No high-grade cuts are used.
• Reported results contain no more than two
contiguous metres of internal dilution
below 0.25g/t.
• Results are reported above a variety of
gram / metre cut-offs dependent upon the
nature of the hole. Grade cut-offs if
applied are clearly stated in the relevant
tables.
• All reported intersections are downhole
lengths. True widths are not yet known..
Relationship between
mineralisation widths and
intercept lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(e.g., ‘down hole length, true width not known’).
• Unless indicated to the contrary, all results
reported are downhole width.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of
• drill hole collar locations and appropriate sectional views.
• Included in this press release
Balanced reporting • Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low
and high grades and/or widths should be practiced to
avoid misleading reporting of Exploration Results.
• All material assay resultrs and holes without
significant intersections are reported in
Table 2 and Annexure 3.
Page | 12
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Other substantive
exploration data
• Other exploration data, if meaningful and
Share your feedback
Discover