Cobar Basin PFS Shows Substantial Increase in Profit and NPV
Released
Released
Announcement PDF
ASX Announcement
30 January 2026
ASX: MKR
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02- 7253 2020 www.manukaresources.com.au
Manuka Provides Updated Cobar Basin PFS
Highlighting Substantial Increase in Profit and NPV
Highlights
• Project NPV8 of A$805 million and IRR of 1,092% based on US$95/oz silver,
US$4,800/oz gold prices and AUD/USD of 0.7000.
• 10-Year Mine Plan to produce 13.2 million ounces of silver and 35 thousand
ounces of gold from existing stockpiles and open pits located at the
Wonawinta Silver Mine and Mt Boppy Gold Mine, Cobar Basin.
• Near term production leveraging existing plant with low capex upgrades
• Existing Wonawinta Processing Plant set to return to production in H1 2026.
• Sensitivity Analysis in Table 7 shows varying NPV outcomes from movements
in Spot Gold & Silver prices.
• The Mine Plan is forecast to generate an average EBITDA of A$127 million p.a.
at an average C1 cost of A$34.4/oz silver (including gold credits).
• Mine Plan of 10.9Mt ore, supported by existing Ore Reserves and Mineral
Resources at both Wonawinta and Mt Boppy.
• Pre-production capital costs are estimated at A$26.6 million (including a
contingency of A$2.2 million).
• The Company raised A$15 million in October 2025 and is in the final stages of
reaching a binding agreement for a US$22.5 million debt facility with Nebari
Natural Resources Credit Fund. This ensures Manuka is fully funded to
production and profitability.
• The Wonawinta plant is a highly strategic asset located within trucking
distance of multiple high grade precious and base metals deposits within the
Cobar Basin, providing the Company with significant commercial optionality.
• Ongoing exploration drilling at Mt Boppy targeting high-grade extensions to
gold mineralisation that has historically delivered ~500,000 ounces grading
~15g/t Au. Assays results due during the current quarter.
• Manuka remains fully unhedged, leaving it leveraged to further upside from
movements in precious metals prices.
Manuka’s Executive Chairman, Dennis Karp, commented:
“Manuka is uniquely positioned among junior ASX resource companies as one that is
well set to translate historically high silver and gold prices into substantial near-term
cash returns for the Company and its shareholders.
With our existing 1Mtpa processing plant set to restart within the coming months, debt
Page 2
funding to support the modest capital costs nearing finalisation, and an initial 10-year
production plan demonstrating outstanding economics, Manuka presents both as a
compelling and significantly undervalued investment opportunity.
Project execution is ramping up, and we look forward to providing updates to the
market as we progress towards first production”
Figure 1: Location Wonawinta and Mt Boppy Projects within the Cobar basin.
Page 3
Project Summary
Manuka Resources Limited (ASX: MKR, “Manuka” or the “Company”) is pleased to
announce the updated 10-Year Mine Plan for the Wonawinta Silver and Mt Boppy Gold
Mines, respectively located 80km due south and 50km due east of Cobar, within the
prolific Cobar Basin mining province of New South Wales (Figure 1).
Wonawinta was built by Cobar Consolidated Resources (“CCR”) in 2011 and acquired
by Manuka in 2016. Wonawinta comprises a granted mining lease, existing open pit
mines, an existing 1Mtpa CIL processing plant and associated infrastructure including
approved tailings dams and accommodation facilities (Figures 2 – 5).
Between 2021 and 2023, Manuka intermittently and separately processed silver ore
from Wonawinta ROM stockpiles and gold ore from the Mt Boppy Gold Mine (“Mt
Boppy”) through the Wonawinta processing plant before placing the operation on active
care and maintenance in early 2024.
The Production Plan described in this announcement outlines the upgrading and
recommissioning of the Wonawinta processing plant to enhance throughput and leach
performance and deliver a Production Target that comprises:
• 10.4Mt silver ore from selected stockpiles and 5 open pits located adjacent to
the Wonawinta processing plant; and
• an initial 0.2Mt of gold ore from selected areas of larger 2.2Mt Rock Dump,
Tailings and Stockpile Resource located at Mt Boppy; and
• 0.3Mt of high-grade gold ore from the existing Open Pit at Mt Boppy.
The Production Plan estimates a capital requirement of A$26.6 million to bring the
processing plant into production, of which A$11.4 million will be spent on a new
desliming circuit to remove clays that have previously inhibited mill throughput and CIL
recoveries. The upgrade and refurbishment of the processing plant is scheduled to
commence in Q1 2026 with first production from Wonawinta Stockpiles and Mt Boppy
Stockpiles in Q2 2026. Mining is scheduled to commence in Q3 2026.
Over the 10-Year Mine Plan, the Project is forecast to generate an average
EBITDA of A$127 million p.a. at a C1 cost of A$34.4/oz silver (including gold
credits) resulting in an NPV8 of A$805 million and an IRR of 1,092%.
The Production Target (Table 1) is supported by Reserves for Wonawinta as well as
Mineral Resource Estimates for Wonawinta in-ground deposits, Wonawinta Stockpiles,
Mt Boppy in-ground deposits and Mt Boppy Rock Dumps, Tailings and Stockpiles
(Tables A2- A6, Appendix A).
The 10.9Mt Mine Plan is underpinned by 6.9Mt Reserves and comprises 8% Measured
Resources, 54% Indicated Resources and 39% Inferred Resources. There is a low level
of geological confidence associated with Inferred Resources and there is no certainty
Page 4
that further exploration work will result in the conversion of Inferred Resources to
Indicated Resources or return the same grade and tonnage distribution.
The Company has determined that the Production Plan presented herein has been
completed at a Pre-Feasibility Study level.
The 10-Year Mine Plan comprises the mining and reclaiming of a total of 10.9Mt ore
containing 19.0Moz of silver and 46koz of gold. Commencing Q2 2026, Existing ROM
Stockpiles located at Wonawinta and Existing Stockpiles located at Mt Boppy will be
reclaimed and processed through the upgraded Wonawinta Processing Plant. Mining at
Wonawinta will commence in Q3 2026 at the existing Manuka open pit, before
progressing to the Belah, Bimble and Pothole Pits and concluding with the existing
Boundary Pit. Mining of the Mt Boppy Open Pit is scheduled to commence in 2028.
Table 1: Production Target
Source
Tonnes
(Mt)
Waste
(Mt)
Ag
(g/t)
Ag
(Moz)
Au
(g/t)
Au
(koz)
Mt Boppy Stockpiles 0.2 - - 0 1.1 7.3
Mt Boppy Open Pit 0.3 7.0 - - 4.17 39.1
Wonawinta ROM Stockpiles 0.2 - 60 0.4 0.07 0.5
Manuka Open Pit 1.4 3.4 61 2.7 - -
Belah Open Pit 1.1 5.5 67 2.4 - -
Boundary Open Pit 5.5 23.9 54 9.6 - -
Bimble Open Pit 1.8 9 57 3.2 - -
Pothole Open Pit 0.4 0.9 41 0.5 - -
Total 10.9 49.7 53.9 19.0 0.1 46.3
Note: Tonnes and Grade are rounded. Discrepancies in calculated Contained Metal are due to rounding.
A new desliming circuit added to the front end of the Processing Plant will be used to
remove the -38µm size fraction from crushed ROM feed to produce a +38µm product
for milling at a rate between 100 and 135tph (0.8-1.0Mtpa).
Milled feed will leach via an existing CIL and elution circuit with metal recovered via zinc
precipitation to a ~70% silver concentrate filter cake with gold credits that will be shipped
on a weekly basis to the ABC refinery in Sydney.
Previous processing of Wonawinta silver ore by the Company delivered a gold
credit of 1 gold ounce per 435 silver ounces over a 9-month period between
May 2022 and February 2023.
No gold credit has been applied to ore mined from the Wonawinta open pits and
therefore represents a significant potential upside to project cashflows over the
Mine Plan should it continue to be recovered.
Page 5
An annual summary of the Mine Plan and forecast cashflows are outlined in Table 2 and
Table 3 respectively.
Figure 2: Location of existing infrastructure, ROM Stockpiles and existing and
proposed open pits at Wonawinta.
Page 6
Figure 3: The existing Wonawinta Processing Plant.
Figure 4: ROM Stockpiles adjacent to the Wonawinta Processing Plant.
Page 7
Figure 5: Existing Manuka Open Pit.
Figure 6: Mt Boppy stockpiles and open pit mine.
Page 8
Table 2: Annual Summary of Mine Plan - Physicals
Calendar Year Units Total 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
WWTA Open Pit Waste Mt 42.7 1.3 6.4 6.7 3.6 4.0 6.5 6.9 5.1 1.6 0.5
WWTA In-Ground Mt 10.2 0.5 1.3 1.0 1.0 1.1 1.2 0.9 1.4 1.4 0.5
Silver Grade g/t Ag 56.5 51 64 59 60 56 54 55 53 53 61
WWTA Stockpiles Mt 0.2 0.2 - - - - - - - - -
Silver Grade g/t Ag 60.3 60 - - - - - - - - -
Mt Boppy Stockpiles Mt 0.2 0.1 0.1 - - - - - - - -
Gold Grade g/t Au 1.1 1.11 1.07 - - - - - - - -
Mt Boppy Open Pit Waste Mt 7.0 - - 2.2 4.2 0.6 - - - - -
Mt Boppy In-Ground Mt 0.3 - - 0.0 0.1 0.2 - - - - -
Gold Grade g/t Au 4.2 - - 1.25 3.26 5.00 - - - - -
Total Ore Mined Mt 10.9 0.8 1.4 1.0 1.1 1.3 1.2 0.9 1.4 1.4 0.5
Total Silver Mined Moz 19.0 1.3 2.6 1.9 1.8 2.0 2.0 1.6 2.4 2.4 1.0
Total Gold Mined koz 46.3 2.8 4.5 0.1 14.1 24.9 - - - - -
Measured % 8% 40% 5% 0% 8% 5% - 9% 15% 1% -
Indicated % 54% 55% 80% 88% 82% 85% 22% 35% 58% 5% -
Inferred % 39% 5% 15% 12% 11% 10% 78% 56% 27% 94% 100%
ROM Feed Mt 10.9 0.6 1.2 1.1 1.2 1.3 1.2 1.0 1.2 1.2 1.0
Milled / Leached Mt 7.8 0.4 0.9 0.8 0.9 0.9 0.8 0.7 0.8 0.8 0.7
Milled/Leached Silver Moz 16.3 0.7 1.7 1.8 1.9 1.8 1.7 1.6 1.6 1.7 1.6
Recovered Silver Moz 13.2 0.6 1.3 1.5 1.6 1.4 1.4 1.3 1.4 1.5 1.4
Recovered Gold koz 35.2 2.9 2.9 - 4.6 18.2 6.6 - - - -
There is a low level of geological confidence associated with Inferred Resources and there is no certainty that further exploration work will
result in the conversion of Inferred Resources to Indicated Resources or return the same grade and tonnage distribution.
Page 9
Table 3: Annual Summary of Mine Plan – Financials
Calendar Year Units Total 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Payable Silver Moz 13.2 0.6 1.3 1.5 1.6 1.4 1.4 1.3 1.4 1.5 1.4
Payable Gold koz 35.2 2.4 3.4 - 4.1 18.2 7.1 - - - -
Silver Price US$/oz 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0
Gold Price US$/oz 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800
Exchange Rate A$:US$ 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
Net Silver Revenue A$M 1,786 74 169 196 209 192 186 176 192 199 192
Net Gold Revenue A$M 241 17 23 - 28 125 48 - - - -
Govt. Royalties A$M (66) (3) (6) (6) (8) (11) (8) (6) (6) (6) (6)
Net Revenue A$M 1,961 88 186 189 229 306 226 170 186 193 186
Wonawinta Mining A$M (274) (11) (35) (36) (27) (29) (35) (36) (33) (23) (11)
Mt Boppy Mining A$M (84) (4) (7) (18) (35) (19) (2) - - - -
Processing A$M (266) (17) (31) (27) (29) (32) (28) (26) (26) (26) (24)
G&A + Logistics A$M (71) (5) (7) (7) (7) (7) (7) (7) (7) (7) (7)
EBITDA A$M 1,265 52 106 101 131 220 153 101 120 136 145
Pre Revenue Capex A$M - - - - - - - - - - -
Sustaining Capex A$M (70) (29) (5) (6) (6) (1) (7) (2) (5) (8) (0)
Net Project Cashflow A$M 1,196 23 101 95 125 219 147 99 114 129 144
Cumulative Cashflow A$M 23 124 219 344 563 710 808 923 1,051 1,196
NPV8 A$M 805.3
IRR % 1,092%
Average EBITDA p.a. A$M 126.5
Page 10
Financial Assumptions
• A silver price of US$95/oz (~25% below spot of US$118/oz) and a gold price of
US$4,800/oz (~15% below spot of US$5,525/oz) have been used for the base
case financial evaluation.
• An AUD/USD exchange rate of 0.7000 has been adopted reflecting the spot
price.
• A refining charge of A$0.25 per recovered ounce has been applied to both silver
and gold based on typical commercial terms.
• A 4% Government Royalty net of allowable deductions including refining costs,
processing costs and depreciation has been applied.
• The model has been prepared on a real, pre-tax, pre-finance basis. It is noted
however that the Company has an accumulated tax loss position of
approximately A$70 million available to offset against future profits.
• A discount rate of 8% has been applied to calculate NPV.
Project Costs
Operating Costs (Table 4) and Capital costs (Table 5) have been built up from first
principles using a combination of supplier/contractor quotes, recent operating
experience and previous actual costs incurred at Wonawinta and Mt Boppy by Manuka.
Table 4: Operating Cost Summary
Item
LOM Total
(A$M)
A$/oz Ag Unit Rate Unit
Open Pit Mining - Wonawinta 273.8 20.7 5.2 $/t Mined
Open Pit Mining - Mt Boppy 63.0 4.8 8.6 $/t Mined
Stockpile Reclamation - Mt Boppy 2.6 0.2 10.2 $/t Mined
Ore Haulage to Wonawinta 18.7 1.4 38.0 $/t Ore Hauled
Processing Costs 266.0 20.1 34.2 $ Ore Milled
G & A & Logistics 71.1 5.4 9.1 $ Ore Milled
Total Opex 695.2 52.6 89.4 $ Ore Milled
Net Gold Credits (241.0) (18.2) (6.8) $ Ore Milled
Net Opex (C1 incl Gold Credits) 454.3 34.4 82.6 $ Ore Milled
Page 11
Table 5: Capital Cost Summary (A$M)
Item
Pre-
Production
During
Production
Total
Crushing/Screening/Deslime Plant 11.1 0.3 11.4
Ads Tk 1
Repairs/Pumpcell/Platforms/Gantry Crane
0.5 0.0 0.5
Control System Upgrade 0.2 0.2 0.4
Product Room (Filter/Retort) 0.4 - 0.4
Restore Site Services 0.5 - 0.5
Elution (Burners/Regen Kiln/Column) 1.1 0.0 1.2
Dewatering Thickener and Detox Upgrade 0.7 1.7 2.3
Plant Repairs/Restoration 0.5 0.4 0.9
Lab Equipment and Restock 0.3 - 0.3
Camp Repairs, Upgrade and Restock 1.1 - 1.1
Offices/Site Ablutions/Laundry 1.2 - 1.2
Replenish Inventory 0.1 - 0.1
Geo Sample Storage/Technical Hardware
and Software
0.7 - 0.7
Safety, Pre-Employment Medicals and
Uniforms
0.3 0.0 0.3
First Fill Reagents 0.5 0.4 0.9
Tailings Dam Lifts 2.3 33.3 36
Mt Boppy Camp Upgrade - 1.4 1.4
Mt Boppy Technical Services - 0.6 0.6
TSF3 Bunding - 3.1 3.1
Sustaining Capex Provision - 3.9 3.9
Contingency 2.2 0.6 2.8
Sub-Total 23.9 45.9 69.7
Processing Staff Ramp Up 1.4 - 1.4
Admin and Management Staff Ramp Up 1.4 - 1.4
Total Capex 26.6 45.9 72.5
Page 12
Project Sensitivities
Table 7: Project Sensitivity Matrix: NPV (A$M) vs Silver (US$/oz) vs Gold (US$/oz) at 10%
price increments and AUD/USD 0.7000
A$M
Silver Price change (US$/oz)
48 57 67 76 86 95 105 114 124 133 143
-50% -40% -30% -20% -10% 0% 10% 20% 30% 40% 50%
Gold
Price
Change
(US$/oz)
7,200 50% 303 421 539 656 774 892 1,009 1,127 1,245 1,362 1,480
6,720 40% 286 404 521 639 757 874 992 1,110 1,227 1,345 1,463
6,240 30% 269 386 504 622 739 857 975 1,092 1,210 1,328 1,445
5,760 20% 251 369 487 604 722 840 957 1,075 1,193 1,310 1,428
5,280 10% 234 352 470 587 705 823 940 1,058 1,176 1,293 1,411
4,800 0% 217 335 452 570 688 805 923 1,041 1,158 1,276 1,394
4,320 -10% 200 317 435 553 670 788 906 1,023 1,141 1,259 1,376
3,840 -20% 182 300 418 535 653 771 888 1,006 1,124 1,242 1,359
3,360 -30% 165 283 401 518 636 754 871 989 1,107 1,224 1,342
2,880 -40% 148 266 383 501 619 736 854 972 1,089 1,207 1,325
2,400 -50% 131 248 366 484 601 719 837 954 1,072 1,190 1,307
Base Case Spot Case
Figure 7: Project Sensitivity Chart (NPV vs Project inputs)
400
500
600
700
800
900
1000
1100
1200
-25% -20% -15% -10% -5% 0% 5% 10% 15% 20% 25%
Project
NPV
Recovery WTA Mining Costs Capex Gold
Silver MtB Mining Costs Processing Costs
Page 13
Implementation Schedule
The Company is targeting financial close on the debt facility and a Final Investment
Decision in Q1 2026. The Company aims to be in production by late Q2 2026 (Table 8).
Table 8: Indicative Implementation Schedule
Workstream
2026
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Debt Funding / Final Investment Decision
Re-establish Camp
Re-establish Offices, Stores & Workshop
Refurbish, Modify & Processing Plant
Commission Process Plant
Steady State Production
Construct TSF Lift 3
First Shipment of Silver Concentrate
Mobilise Mining
Mining Commencement
Value Enhancement Opportunities
• Early Production from Mt Boppy Stockpiles: Mt Boppy ore does not require
processing through the proposed new deslime circuit and therefore can be fed
directly into the existing mill. There is an opportunity, given the current gold price,
to commence hauling ore from Mt Boppy Stockpiles to Wonawinta in Q1 2026
and feeding it to the existing plant to generate immediate gold credits.
• Strategic Opportunities in the Cobar Basin: Operating a processing facility
within the Cobar Basin positions Manuka to unlock strategic value. The plant’s
capacity to treat precious metal ores presents opportunities to monetise and
potentially support nearby stranded assets that lack sufficient scale to justify
standalone processing infrastructure.
• Gold Credit from Wonawinta Silver Ore: As previously noted, Manuka has
been generating a modest but meaningful gold credit while processing stockpiles
of Wonawinta silver ore. If gold continues to be recovered consistently throughout
the life of mine, it could deliver a materially positive impact on both project
cashflows and overall valuation.
• Continued Haulage of Mt Boppy Gold Ore: The current Mine Plan incorporates
0.2Mt of gold ore stockpiles from Mt Boppy—a small fraction of the broader 2.2Mt
Resource of mineralised rock dumps, tailings, and stockpiles at the site. Ongoing
identification of high-grade zones within these materials offers the potential to
further increase gold ore feed and enhance cashflow generation.
Page 14
• Further Resource-to-Reserve Conversion: The current Mine Plan utilises
10.4Mt of ore—approximately 25% of the total defined in-ground and stockpiled
Resources at Wonawinta. Additional drilling and sampling could enable the
conversion of further Resources into Reserves, thereby extending mine life and
strengthening project economics.
• Exploration Drilling at Mt Boppy and Pipeline Ridge: Manuka is currently
undertaking a gold exploration drilling program at Mt Boppy and Pipeline Ridge.
Positive results at the high-grade Mt Boppy gold mine or at the shallow Pipeline
Ridge deposit may lead to an increase in Resource tonnes that could be
incorporated into the mine plan at a later point
• Mining Fleet Optimisation: As procurement discussions with mining contractors
advance, there is scope to reassess and refine equipment requirements and
associated costs. These negotiations offer the potential to reduce unit mining
costs and improve operating margins.
• Re-optimisation of Open Pit Design: The Wonawinta and Mt Boppy Open Pit
designs were based on pit shells optimised for a silver price of A$50/oz and a
gold price of A$4,000/oz respectively. Given the significant change in precious
metal pricing since the optimisations were complete, there exist an opportunity
to update pit optimisations to determine whether additional lower grade or deeper
ore can be brought into the mine plan and therefore extend mine life.
This announcement has been approved for release by the Board of Manuka Resources
Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. +61 412 268 114
About Manuka Resources Limited
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration
company with key gold and silver assets located in the Cobar Basin (NSW), and offshore
vanadium and titanium bearing iron sands in the South Taranaki Bight of New Zealand.
Page 15
Compliance Statements
Information relating to in-ground Mineral Resources Estimate for the Wonawinta Silver
Mine is extracted from the announcement titled “43% Increase in Measured & Indicated
Resources at Wonawinta Silver Project” dated 1 April 2021 and available to view on the
Company’s website. The Company is not aware of any new information or data that
materially affects the information used to compile the Mineral Resource and all material
assumptions and technical parameters underpinning the estimates in the relevant
market announcements continue to apply and have not materially changed.
Information relating to Mineral Resources Estimate for the Wonawinta Stockpiles, Mt
Boppy Rock Dump, Tailings and Stockpiles, and Ore Reserves relating to the in-ground
Wonawinta deposit, the Wonawinta Stockpiles and the Mt Boppy Rock Dump, Tailings
and Stockpiles is extracted from the announcement titled “Updated Cobar Basin
Production Plan” dated 30 May 2025 and available to view on the Company’s website.
The Company is not aware of any new information or data that materially affects the
information used to compile the Mineral Resource and all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed.
Information relating to the Mineral Resource Estimate and Ore Reserves relating to the
in-ground Mt Boppy Deposit, is extracted from the announcement titled “29 July 2025
Announcement Clarification” dated 5 August 2025 and available to view on the
Company’s website. The Company is not aware of any new information or data that
materially affects the information used to compile the Mineral Resource and all material
assumptions and technical parameters underpinning the estimates in the relevant
market announcements continue to apply and have not materially changed.
Page 16
Appendix A: Project Implementation Plan
Location and Access
Wonawinta and Mt Boppy are located 100km south and 50km east respectively of Cobar
in central New South Wales (Figure A1).
Access to Cobar from the major regional centre of Dubbo is via 300km of State
highways. Access to Wonawinta from Cobar is via 70km of sealed highway and 30km
of shire and private unsealed roads. Access to Mt Boppy is via sealed highway and local
sealed road. The distance by road between Mt Boppy and Wonawinta is approximately
150km via Cobar.
Figure A1: Location of and access to Wonawinta and Mt Boppy relative to Cobar.
Page 17
Project Tenure
The granted tenements held by Manuka Resources Ltd and its wholly owned subsidiary
Mt Boppy Resources Pty Ltd that comprise the Project Implementation Plan and Mine
Plan are listed in Table A1.
Table A1: Mining Leases comprising the Mine Plan
ID Holder Area Grant Date Expiry Date
ML1659 Manuka Resources Limited 923.8 Ha 23-11-2011 23-11-2032
EL7345 Manuka Resources Limited 59 Units 25-05-2009 25-05-2028
MPL240 Mt Boppy Resources Pty Ltd 17.8 Ha 17-01-1986 12-12-2033
ML1681 Mt Boppy Resources Pty Ltd 188.1 Ha 12-12-2012 12-12-2033
ML311 Mt Boppy Resources Pty Ltd 10.12 Ha 08-12-1976 12-12-2033
GL5848 Mt Boppy Resources Pty Ltd 8.63 Ha 15-02-1968 15-06-2033
GL5898 Mt Boppy Resources Pty Ltd 7.51 Ha 21-06-1972 12-12-2033
GL3255 Mt Boppy Resources Pty Ltd 8.28 Ha 20-05-1926 20-05-2033
GL5836 Mt Boppy Resources Pty Ltd 6.05 Ha 15-06-1965 15-06-2033
Wonawinta
Manuka is the 100% owner of the Western Lands Lease (pastoral lease) on which the
Project Mining lease and Mineral Resource is situated.
To date, there are no option agreements or joint venture terms in place for the Project
nor are there commercial obligations on ground covered by tenure comprising
Wonawinta. No compensation agreements are in place for the Project.
Mt Boppy
The property on which the Mount Boppy mine situated is Crown Land. A Native Title
Agreement is in place with the traditional owners over a mining lease on the western
edge (ML1681, not within the current project area). The Company notes that no land
within the licence area may be classified as sensitive land and the site has been subject
to over 100 years of intermittent mining activity. No further approvals other than those
required under the Mining Act 1992 are required for current operations.
Site Layout
Recent aerial images of the Wonawinta and Mt Boppy Project areas labelled with key
features are shown in Figure A2 and A3.
Page 18
Figure A2: Existing layout of Wonawinta
Page 19
Figure A3: Existing layout of Mt Boppy
Page 20
Mineral Resource Estimates & Ore Reserves
Wonawinta
The Wonawinta Mineral Resource Estimate comprises:
• 38.3Mt of in-ground Mineral Resource with a grade of 41.3g/t Ag and 0.54% Pb;
• a Stockpile Mineral Resource of 0.2Mt with a grade of 60g/t Ag and 0.07g/t Au.
The Mineral Resource Estimate for Wonawinta was previously released to the ASX on
1 April 2021 and remains unchanged. The Wonawinta Stockpile Mineral Resource
Estimate was previously released to the ASX on 30 May 2025 and remains unchanged.
The Wonawinta Ore Reserve comprises:
• a 6.2Mt of in-ground Reserve with a grade of 56.4g/t Ag;
• a stockpile Reserve of 0.2Mt with a grade of 60g/t Ag and 0.07g/t Au.
The in-ground Ore Reserve and stockpile Ore Reserve for Wonawinta was previously
released to the ASX on 30 May 2025 and remain unchanged.
Mt Boppy
The Mt Boppy Mineral Resource Estimate comprises:
• 0.3Mt in-ground Mineral Resources grading 4.12g/t Au; and
• A Rock Dump, Tailings and Stockpile Resource of 2.2Mt at 0.84g/t Au.
The Mt Boppy Mineral Resource Estimate was previously released to the ASX on 5
August 2025 and remains unchanged. The Rock Dump, Tailings and Stockpile
Resource Estimate was previously released to the ASX on 30 May 2025 and remains
unchanged.
The Mt Boppy Ore Reserve comprises:
• A Rock Dump, Tailings and Stockpiles comprising 0.2Mt at 1.1g/t Au.
• An Open Pit in-ground Reserve comprising 0.3Mt at 4.2g/t Au
The Rock Dump, Tailings and Stockpile Ore Reserve for Mt Boppy was previously
released to the ASX on 30 May 2025 and remain unchanged. The Open Pit Ore Reserve
was previously released to the ASX on 5 August 2025 and remains unchanged.
A breakdown of the Ore Reserves and Mineral Resources underpinning the Cobar
Basin Mine Plan are shown in Tables A2 – A6.
Page 21
Table A2: Mine Plan Ore Reserves
Reserve Category
Tonnes
(Mt)
Ag
(g/t)
Ag
(Moz)
Au
(g/t)
Au
(koz)
Probable – Wonawinta In-Ground 6.2 56.4 11.2 - -
Probable – Wonawinta Stockpiles 0.2 60 0.4 0.07 0.5
Probable – Mt Boppy In-Ground 0.3 - - 4.2 39.0
Probable – Mt Boppy Stockpiles 0.2 - - 1.1 7.3
Total 6.9 52.4 11.6 0.22 46.8
Table A3: Wonawinta In-Ground Mineral Resource Estimate
Resource Category Tonnes (Mt) Ag (g/t) Ag (Moz) Pb (%) Pb (kt)
Measured 1.1 47.3 1.65 0.69 7.5
Indicated 12.3 45.5 18.04 0.83 102.8
Inferred 24.9 39.0 31.25 0.39 96.9
Total 38.3 41.3 50.94 0.54 207.2
Table A4: Wonawinta Stockpiles Mineral Resource Estimate
Resource Category Tonnes (Mt) Ag (g/t) Ag (Moz) Au (g/t) Au (koz)
Measured 0.1 61 0.3 0.03 0.1
Indicated 0.1 58 0.1 0.16 0.4
Total 0.2 60 0.4 0.07 0.5
Table A5: Mt Boppy In-Ground Mineral Resource Estimate
Resource Category Tonnes (Mt) Au (g/t) Au (koz)
Measured 0.2 4.01 21.8
Indicated 0.2 4.24 22.4
Inferred - - -
Total 0.3 4.12 44.2
Table A6: Mt Boppy Mineral Resource Estimate – Rock Dumps, Stockpiles & Tailings
Resource Category Tonnes (Mt) Au (g/t) Au (koz)
Indicated 1.4 0.69 30.0
Inferred 0.9 1.09 30.2
Total 2.2 0.84 60.2
Note: Tonnes and Grade are rounded. Discrepancies in calculated values are due to rounding.
Page 22
Metallurgy - Wonawinta Silver Deposit
Eleven different ore lithologies observed within the Wonawinta Resource have been
grouped into five categories - Oxidised Clays, Fresh Clays, Oxidised Limestone, Fresh
Limestone and Fresh Granite. The proportion of each of these categories within the
Mine Plan is shown in Table A7. These groups have been further assigned a
metallurgical classification of either Clay, Semi-Competent and Competent (Table A8).
The metallurgical characteristics of the Wonawinta ore are intrinsically linked to the
mineralogy of the deposit (Table A8). Analysis of drill cores from the Wonawinta deposit,
were investigated by the CSIRO (2022) utilising a hyperspectral core scanner
(HyLogger3) and X-ray computed tomography to determine mineralogy and 3D
structure. Samples of this core with high Ag content and variable Zn and Pb contents
(from assays provided) were further analysed using the Maia Mapper micro-X-ray
fluorescence scanner to examine the Ag mineralogy and distribution. Characterisation
of the supergene mineralisation and transition zone containing clays and dolostones
indicates Ag occurs along planar features within the cores,and shows that Ag is
transported along cracks within the clay matrix. Pb accumulations are not spatially
correlated with the Ag but, XRF imaging shows they are associated with Mn-oxide and
goethite development in largely clay-rich host rocks. Ag occurs as Ag-halide minerals,
iodargyrite and embolite (a mixture of chlorargyrite and bromargyrite). In some samples
it also occurs with Hg in a phase that preliminary data suggest contains S and Cl but
more work is required to define what this mineral is.
At the top of the underlying dolostone sequence, Ag occurs in clays and goethite
developed in micritic layers and filling vugs in the dolostone. Thermodynamic modelling
shows that Ag mineralogy is controlled by oxidation state within the groundwater, and
that halides can be sourced from the groundwater. Clay mineralogy is controlled by
weathering extent and acidity, while the other economic elements (Zn and Pb) are
deposited in secondary oxide phases and as carbonates respectively.
From a mining perspective the Ag mineralisation is classified into clay, variably oxidised
limestone and dolomite, and fresh limestone and dolomite.
Table A7: Proportion of each Lithology included in the Mine Plan
Lithology Met Class
Tonnes
(Mt)
Oxidised Clays
Clay
5.6
Fresh Clays 2.0
Oxidised Limestone Semi Comp. 1.6
Fresh Limestone
Competent
1.1
Fresh Granite 0.3
Total 10.8
Page 23
Table A8: Stratigraphy and Lithology descriptions for Wonawinta
Ox.
State
Lithology
Met.
Class
Description
Oxidised
Sandstone SST
Clay
S rich (sulphates?) Fe rich fine grained brown sandstone only found in one hole in Bimble in middle of iron rich
clay
Dolomitic and
Limestone
Clays
DOL-CLY +
LST-CLY
High Ca, brown to dk grey clay, well weathered occurring just above, or occasionally within dolomite or
limestone
Light Coloured
Clays
CLY-L
Occurs at the top of drill holes, below soil and silcrete, white, cream, light pink, light grey, light brow, light yellow
etc., low in Fe, Ca and S, except for odd gypsum layer which usually has no silver
Iron Rich Clays CLY-FE
Red, brown, orange with high Fe, low Ca, variable S. Can contain significant proportion of har