Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
31 July 2023
ASX: MKR
June 2023 Quarterly Activities Report
Key Points
• Gold production from Mt Boppy screened historic rock and tailings
dump material restarted during June Quarter
• Revenues from gold sales to ABC Refinery resumed in July
• No Operating Cash Flow for the Quarter - results partially impacted
by mismatch between costs incurred (June Quarter) and first
receipts from gold sales proceeds (current quarter)
• Positive operating cashflow expected in the Sept Quarter with zero
mining costs plus benefit of existing gold in the tanks at the
Wonawinta plant waiting to be stripped as at beginning of August
• Activities during the Quarter primarily focused on preparations at Mt
Boppy for commencement of the screening project
• Average grade of material screened in June Quarter was ~1.8g/t Au
• Reprocessing of Mt Boppy ROM, waste and tailings estimated to
continue for ~3 years at 20-25kozpa rate
• Revenue from Mt Boppy screening program expected to fully fund
Manuka’s exploration programs over the coming 3 years
• Mt Boppy Deeps exploration program targeting 5 drill holes to 500600m beneath Mt Boppy pit, likely to commence during September
2023
• Gold JORC Resource update expected to be announced in August
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Dennis Karp, Manuka’s Executive Chairman noted: “The Company is about to realise
the benefits of the Mt Boppy gold bearing, screening program. Whilst from a cashflow
perspective the June Quarter was difficult, this is set to be decisively reversed in the
September Quarter.
The Company expects a big Quarter with continued gold production and first revenue
inflow. The funding will underpin a restart of a more aggressive exploration effort
across a highly prioritised portfolio of targets to help build upon the JORC resource
upgrade we anticipate releasing in the Quarter.”
Mt Boppy Gold Project
• Consistent with our schedule, a JORC Resource Update is planned for
release in August
• Although its only early days for the Mt Boppy screening project, gold
grades and recoveries are in line with expectations
• Test work undertaken on these has highlighted the economic viability of
the material which is now being processed at the Wonawinta plant
• Project to end of June Quarter had screened 71,327t of the Mt Boppy ROM
rock dump, producing 34,227t <8mm ore and an additional 7,372t 8mm20mm ore, with the balance going to waste
• Screening of the material started in early May (and the Wonawinta plant
started processing of the screened product on 14 June)
• Next phase of the Mt Boppy exploration program, the Mt Boppy Deeps drill
program, is scheduled for September with a 5 hole program
Taranaki VTM Iron Sand Project
• The Company’s wholly owned subsidiary, TTR, owns 100% of the world
class Taranaki vanadiferous titanomagnetite (VTM) iron sand project
located offshore in NZ’s South Taranaki Bight (STB)
• The project has a reported 3.2Bt VTM iron sand resource1 with 1.6Mt of
contained V2O5 (vanadium pentoxide)
• This makes it one of the largest known drilled vanadium resources worldwide and potential producers on ASX
• The Taranaki VTM Project has a granted mining licence (Mineral Mining
Permit MMP55581)
• Manuka’s vision is for a project initially recovering ~5Mt of VTM iron ore
concentrate, containing 10,000t recoverable vanadium metal, a year over a
20-year mine life
• The next milestone is the regranting of EPA’s environmental consents to
commence mining operations
1 Released ASX 1 March 2023
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
• The EPA’s Decision Making Committee (DMC) commenced this process in
March 2023 and TTR provided the requested expert reports in May 2023
Wonawinta Silver Project
• As previously advised Manuka suspended the processing of all silver
stockpiles until a decision to commence silver mining and production is
made
• Manuka intends to complete a silver JORC Reserve Statement during the
September Quarter in anticipation of future production
• The Wonawinta exploration targets remain a high priority following drilling
at Mt Boppy Deeps and Pipeline Ridge
Overview of the June Quarter 2023
The June Quarter was the first quarter of nil revenues for the Company since its July 2020
IPO. This followed the suspension of the Wonawinta silver stockpile project. The June
Quarter also preceded the inflow of revenues from our initial gold sales. The gold in circuit
(gold residing in the tanks within the Wonawinta plant) at the end of June was building
consistently in line with forecasts and exceeded 600oz gold.
A total of 71,327t of Mt Boppy waste and dumps were screened in the June Quarter,
generating 34,227t of <8mm material and 7,372t of 8-20mm material (with the balance going
to waste). Average grades to date are ~1.8g/t Au.
The Company has encountered certain restart delays which have had the effect of delaying
gold revenues by about 6 weeks (and into the September Quarter). These were largely
centred around LNG supply issues and a shortage of available trucks to complete the Mt
Boppy to Wonawinta haulage of screened material. LNG supply has been resolved and
securing available trucking haulage capacity will be an ongoing challenge requiring day-today management.
Taranaki VTM Project
Manuka’s wholly owned subsidiary, Trans-Tasman Resources Limited (TTR), was granted
Mineral Mining Permit MMP55581 located 22km to 36km offshore in New Zealand’s South
Taranaki Bight (STB) in 2014. In 2017 the NZ Environmental Protection Authority (EPA)
granted the environmental marine and marine discharge consents (Consents) to operate.
The grant of these Consents was then subject to third party legal challenge. Judgments in
the High Court in 2018, the Court of Appeal in 2020 and particularly the Supreme Court
(SC) in 20212 summarised the legal deficiencies of the EPA’s Decision Making Committee’s
(DMC) Consents grant and the legal framework for the DMC to address when the grants
are reconsidered.
2 Judgement delivered 30 September 2021
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
The SC referred the Consents back to the EPA for reconsideration by its DMC on five
narrowly defined points of law. The new DMC reconvened in March 20233 and requested
TTR provide expert evidence to satisfy the SC’s ruling on information deficits. In May 2023
TTR provided the expert evidence to the DMC to satisfy the SC’s requirements and legal
tests to reissue the Consents. These expert reports concluded the proposed VTM mineral
recovery in STB will avoid material harm, will favour caution and environmental protection
in relation to the effects of the proposed mining operations and resulting sedimentation on
biota in the STB including no adverse ecological effects on marine mammals and seabirds.
Accordingly, there are no aspects of TTR’s 2017 environmental Consents that are an
impediment to having them re-approved by the reconvened DMC4.
In parallel with this formal EPA engagement process, TTR will commission additional
metallurgical test work to optimise the flowsheet for processing of the VTM concentrate
(including the recovery of vanadium and titanium) during 2H 2023 and undertake marketing
(and related) studies building on work completed during the Pre-Feasibility Study (PFS).
Globally VTM titanomagnetite iron sands are in strong demand as feed for electric arc
furnaces (EAF) to produce low carbon “green steel”. EAF steel making burns 50% less coal,
reduces emissions by more than 45% in the steel making process and sets the platform for
meeting net zero goals by 2050. Vanadium, apart from its widespread and increasing
application as a steel alloying element to strengthen steel, is rapidly building demand as an
electrolyte in vanadium redox flow batteries (VRFB) which are fast becoming the preferred
IP for large grid-scale high-capacity battery stations to store renewable energy due to their
longevity and fire safety characteristics, ahead of all competing technologies.
Australia is now building its first 850Mw, with 1,680Mwh capacity, VRFB Waratah Super
Battery at the former Munmorah coal fired power station in NSW to drive Australia’s
transition to a low carbon economy.
With concerns over the sovereign security of vanadium supply from key producing nations
China (comprising 55% of global production), Russia (20% of global production), Brazil
(15%) and South Africa (10%), vanadium now has “critical mineral” status in Australia, USA
and the EU. The demand for VTM concentrate for EAF low carbon green steel production
together with the rapidly growing demand underpinning rising prices for vanadium, suggests
the potential of our Taranaki VTM Project, hosting one of the largest known vanadium
resources in the world with 1.6Mt contained V2O5 metal, will attract the competitive capital
investment and metal producer offtake interest required to develop the project.
The Taranaki VTM Project, when in production with an estimated annual production of
10,000 tonnes of vanadium metal, will make Manuka one of the leading vanadium producers
in the world and propel NZ into the third largest producer of the metal after China and
Russia.
Refer EPA Public consultation disclosures at www.epa.govt.nz/public-consultations/in-progress/trans-tasman-resourceslimited-2016/
4 Refer ASX announcement 1 August 2022
3
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Resource Growth and Exploration Outlook
The Company’s geological team has continued to implement the exploration work
programmes established from the Q1 2023 Strategic Review. The MKR Resource Triangle
(Fig. 1) shows the current classification of the exploration targets, and those highlighted on
which work was undertaken during Q2 2023.
Figure 1
The resource base at Mt Boppy outside of the in-pit resources continues to expand. This
has been achieved through continued bulk sampling of the Mt Boppy Main Waste dump
material and screening into sub 8mm and sub 12 mm fractions, which comprise
approximately 40-50% by mass. The Mt Boppy waste dump is estimated to contain
approximately 3.92 Mt of variably mineralised waste rock and old tailings material. Of this,
between 1.6-1.9Mt is targeted as a screened product. Systematic excavation and screening
of the Main Waste dump is steadily building incremental (currently over 120kt) screened
product resources that are viable to truck to the Wonawinta plant. This material will be
processed after completion of current mining of the Mt Boppy ROM pad and rock dump
during the September Quarter.
Bulk sampling of the McKinnons low grade rock dumps was initiated during the Q2, and
results will be reported in Q3 2023.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Other work programmes that have been progressed include,
•
Evaluation of the Mt Boppy mine depth extensions on the back of the 2020-21
Mining Associates mineral resource model and designing deeper diamond
drilling to test and potentially establish incremental resources;
•
Initiation of geological modelling of the Pipeline Ridge base metal – gold deposit,
resampling and analysing available diamond core, and design of a drilling
programme that enables completion of a Feasibility study level mine plan (open
cut and or underground);
•
Completion of a detailed regional geophysics synthesis of the Mt Boppy ML’s and
Canbelego (EL5482) tenements, including conducting a merged data
reinterpretation of all available magnetic data and a revised IP interpretation for
Hardwicks and Pipeline Ridge; and
•
Detailed analysis and reorganisation of the Company’s extensive drilling and
geochemical sampling database.
Drill programmes for 2023 and 2024 have been scoped in-line with prioritisation of the
targets on Figure 1 with encouraging engagement with local drilling contractors for these
activities. Exploration below the historic Mt Boppy mine underground infrastructure and
stoping is a priority target, and these activities are expected to start during Q3 and Q4 2023.
Cashflow and Hedging
Manuka reported ($3.599) million in negative EBITDA over the June Quarter. Operating
cash flow for the Quarter was ($6.2) million. Cashflow was adversely affected by the
mismatch in timing between expense incurred for gold production activities during the
Quarter versus the commencement of cash receipts.
The Company did not have any open hedge contracts as at 30 June 2023.
The principal amount outstanding at Quarter end to the Company’s senior secured lender,
TransAsia Private Capital (TA) was US$8.0 million. This amount is due in a single repayment
on 30 September 2023.
Total borrowings as at 30 June 2023 were A$24.85 million. Unused facilities available at
Quarter end were A$3.46 million and the cash balance was $265,833. Furthermore, there
was another A$1.8m equivalent of gold in the tanks, with stripping and sales to commence
in July.
In accordance with ASX Listing Rule 5.3.3, during the quarter, the Company made cash
payments of $0.275 million to related parties and their associates (refer items 6.1 and 6.2
of the Appendix 5B). This was the aggregate amount paid to the directors including salary,
directors’ fees, consulting fees and superannuation.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Mining Exploration Activities
In accordance with ASX Listing Rule 5.3.1 cash outflows for the quarter in relation to
exploration and evaluation activities were $0.172 million (refer Item 2.1(d) of the Appendix
5B) and predominantly comprised expenditure on:
•
Continued bulk sampling of gold mineralised material continued at Mt Boppy on
both the ROM and Main waste dump. This sampling will be used to generate a
resource report for these areas in the current quarter. Initial bulk sampling also
commenced on the former McKinnons gold mine waste dump;
•
Assessment of the deeper mineralisation in the Mt Boppy orebody continued
along with further inspection of historic drill core. Several deep boreholes are
planned for the current quarter to build on the current known resource; and
•
Further geophysical analysis resulted in all Canbelego historic magnetic data
being merged into a single database, reprocessed and filtered. A number of
untested geophysical targets emerged from this study and will be progressed in
the next two quarters.
Mining Development Activities
In accordance with ASX Listing Rule 5.3.2 cash outflows for the quarter in relation to mining
development activities were $73,000 (refer items 1.2(b) and 2.1(f) of the Appendix 5B).
These outflows relate to establishment of screening and mobile equipment at Mt Boppy.
Mining Production Activities
In accordance with ASX Listing Rule 5.3.2 cash outflows for the quarter in relation to mining
production activities were $2.34 million (refer Item 1.2(c) of the Appendix 5B) and comprised
the following:
Mining and crushing contractors $0.21 million
Hauling contractors
$0.12 million
Processing
$2.01 million
Mining Tenements
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter
ended 30 June 2023.
Wonawinta Silver Project tenements are located approximately 90 kilometres to the
south of Cobar, NSW, and comprises one (1) granted mining lease and seven (7)
granted exploration licences as below, plus processing plant and associated
infrastructure.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Tenement
ML1659
EL6482
EL7345
EL6155
EL6302
EL7515
EL6623
EL8498
Percentage held / earning
100%
100%
100%
100%
100%
100%
100%
100%
Change during Quarter
-
Mt Boppy Gold Project tenements are located approximately 45 kilometres east of
Cobar, NSW, adjacent to the Barrier Highway. The Project comprises four gold
leases, two mining leases, one mining purpose lease and one exploration licence
which encompasses the MLs and extends the project area to the south.
Tenement
GL3255
GL5836
GL5848
GL5898
ML311
ML1681
MPL240
EL5842
Percentage held / earning
100%
100%
100%
100%
100%
100%
100%
100%
Change during Quarter
-
Taranaki VTM Iron Sand Project tenements are located offshore in the South
Taranaki Bight of the North Island, New Zealand. Tenements acquired as a result of
the acquisition5 of TTR comprise one granted mining permit and one granted
exploration permit.
Tenement
MMP55581
MEP54068
Percentage held / earning
100%
100%
Change during Quarter
-
There were no tenements disposed of during the Quarter.
5 ASX disclosure 11 November 2022
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
This announcement has been approved for release by the Directors of Manuka Resources Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
02 7253 2020
Media Contact
Angela East
M+C Partners
0428 432 025
Important Information
This report includes forward-looking statements and comments about future events, including the Company’s expectations about
the performance of its businesses. Forward-looking words such as “expect”, “should”, “could”, “may”, “predict”, “plan”, “will”,
“believe”, “forecast”, “estimate”, “target” or other similar expressions are intended to identify forward-looking statements. Such
statements involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company and which may cause actual results, performance or achievements to differ materially from those
expressed or implied by such statements. Forward-looking statements are provided as a general guide only and should not be
relied on as an indication or guarantee of future performance. Given these uncertainties, recipients are cautioned to not place
undue reliance on any forward-looking statement. Subject to any continuing obligations under applicable law, the Company
disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in this report
to reflect any change in expectations in relation to any forward-looking statements or any change in events, conditions or
circumstances on which any such statement is based. No Limited Party or any other person makes any representation, or gives
any assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in the
report will occur.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
About Manuka Resources Limited
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration company with key assets
located in the Cobar Basin, central west New South Wales. In addition to its recent acquisition of TransTasman Resources Limited owner of the Taranaki VTM Project, it is the 100% owner of two fully permitted
mining projects, one gold and one silver, both within the Cobar Basin, which include the following:
▪
Gold - Mt Boppy Gold mine, 48-person mine camp and neighbouring tenements, hosting an existing
open pit mineral resource6 and combined ROM, waste and tailings material all of which lend
themselves to upgrading through screening. The Company has commenced a screening and gold
recovery project, processing the product at its Wonawinta plant. It has confidence the gold from these
sources can be extracted profitably and over a period of ~3 years. Manuka also awaits the outcome of
its forthcoming exploration program to determine as to whether the future for mining any Mt Boppy
extensions will be as an underground or open cast mine.
▪
Silver - Wonawinta silver project, with mine, 84 person mine camp, processing plant and neighbouring
tenements. Previously renowned as the largest primary producer of silver in Australia, the mine hosts
a significant JORC resource7. The Wonawinta processing plant has a nameplate capacity of >850,000
tonnes per year (which the Company now sees expanded to >1.0Mt/yr. The Company has recently
completed a plant and metallurgical recovery optimisation.
There exists a number of highly prospective base metals exploration targets on Manuka’s ~1,150km 2
tenement package within the Cobar Basin.
The Taranaki VTM Iron Sand Project recently released its maiden vanadium resource 8 which ranks it as
one of the largest drilled vanadium projects globally. The Project has a granted mining licence and is in the
lowest quartile of the iron ore production cost curve. The Company awaits the reissuance of its
Environmental Approval before completing its Bankable Feasibility Study.
6 ASX release 29 July 2022
7 ASX release 1 April 2021
8 ASX release 1 March 2023
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
APPENDIX 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Manuka Resources Ltd
ABN
Quarter ended (“current quarter”)
80 611 963 225
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 June 2023
Current quarter
$A’000
Year to date
(12 months)
$A’000
(453)
9,645
(a) exploration & evaluation
(6)
(6)
(b) development
(73)
(117)
(c) production
(2,343)
(13,230)
(d) staff costs
(1,892)
(8,278)
(785)
(2,271)
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
(570)
(730)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
(85)
482
1.9
Net cash from / (used in) operating
activities
(6,207)
(14,506)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(217)
(596)
(d) exploration & evaluation
(172)
(686)
-
-
-
(5)
(e) investments
(f)
other non-current assets – (mine
properties and development)
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
2.2
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
-
(390)
(1,286)
Proceeds from issues of equity securities
(excluding convertible debt securities)
2,398
6,247
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(262)
3.5
Proceeds from borrowings
6,021
15,232
3.6
Repayment of borrowings
(3,875)
(6,552)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(43)
(131)
3.10
Net cash from / (used in) financing
activities
4,501
14,796
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,362
1,263
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(6,207)
(14,506)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(390)
(1,286)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4,501
14,796
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
266
266
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
266
2,362
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
266
2,362
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
275
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: 6.1 This is made up of amounts paid to the directors including salary, directors’ fees, consulting fees and
superannuation.
Note: 6.2 This is made up of amounts paid to the directors including consulting fees in respect of exploration activities.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
26,928
24,849
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
26,928
24,849
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Lender
Facility type
TransAsia
Private Capital
Limited
ResCap
Investments
Pty Ltd
Growfunding
Pty Ltd
Various
Secured Senior
Debt Facility
plus interest
Unsecured
Working
Capital Loan
Vehicle
Finance
Short-term
finance
Tennant Metals
Trade Finance
stockpile facility
Total Facility
2,079
Rate
Maturity
13,647
13%
30/09/2023
2,000
16%
30/09/2023
318
11%
29/04/2025
1,956
20%
9,005
8.8%
31/08/2023
3 year trade
finance facility
expiring April
2026
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
2,079
8.6
Total available funding (item 8.4 + item 8.5)
2,345
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.37
(6,207)
(172)
(6,380)
266
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3, answer item 8.7 as
“N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
The Company has recommenced gold production as announced to the ASX on 14
June 2023 and first cash inflows from gold sales occurred during July 2023.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
At 30 June 2023 the Company has excess finance facilities available for use and
gold recoveries are already underway. At the time of writing the gold in circuit
exceeds $A4 Million and sales to the refinery have commenced.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
During the quarter the Company recommenced gold production as announced to the
ASX on 14 June 2023 and first cash inflows from gold sales occurred during July
2023.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above mu