Cobar Basin Production Plan
Released
Released
Announcement PDF
3 June 2025
Cobar Basin Production Plan to deliver 13Moz Silver plus
Gold credits from the Existing Wonawinta Processing Plant
An ASX-listed Producer, Developer and Explorer with Precious Metals assets in the
Cobar Basin and Iron Ore and Critical Minerals assets in New Zealand
Disclaimer
This disclaimer applies to this presentation and the information contained in it (the Presentation). By reading
this disclaimer you agree to be bound by it. The Presentation has been prepared by Manuka Resources Limited
and relates to its subsidiaries, related parties and any new assets or entities subsequently acquired or
incorporated (collectively the Company). The Presentation was prepared on 3 June 2025 and the information in
it is subject to change without notice.
Purpose
The Presentation is for information purposes only and is an overview of the Company and its assets at the time
of preparation. This Presentation does not contain all information necessary to make an investment decision or
that would be required in a prospectus or product disclosure statement prepared in accordance with the
requirements of the Corporations Act 2001 (Cth) (Corporations Act). The Presentation is of a general nature
and does not purport to be complete or verified by the Company or any other person.
Distribution outside Australia
Distribution or release of this document outside Australia may be restricted by law. This document may only be
distributed or released to a person that is not in the United States except as permitted under the U.S. Securities
Act. Persons who come into possession of this document who are not in Australia should seek advice on and
observe any such restrictions. Any failure to comply with such restrictions may constitute a violation of applicable
securities laws.
Not an offer or financial product advice
The Presentation does not constitute an offer, invitation, solicitation or recommendation with respect to the
purchase or sale of any security in the Company nor does it constitute financial product advice. The Presentation
is not a prospectus, product disclosure statement or other offer document under Australian law or under any
other law. The Presentation has not been filed, registered or approved by any regulatory authority in any
jurisdiction. The Presentation is not intended to be relied upon as advice or a recommendation to investors and
does not take into account the investment objectives, financial situation, taxation situation or needs of any
particular investor.
An investor must not act on the basis of any matter contained in the Presentation and must make its own
assessment of the Company and conduct its own investigations and analysis. Investors should assess their own
individual financial circumstances and consider talking to a financial adviser, professional adviser or consultant
before making any investment decision. Neither this Presentation nor anything contained in it forms the basis of
any contract or commitment and no agreement to subscribe for securities will be entered into on the basis of this
Presentation.
No guarantee, representation or warranty
While reasonable care has been taken in relation to the preparation of the Presentation, none of the Company or
their respective directors, officers, employees, contractors, agents, or advisers nor any other person (Limited
Party) guarantees or makes any representations or warranties, express or implied, as to or takes responsibility
for, the accuracy, reliability, completeness or fairness of the information, opinions, forecasts, reports, estimates
and conclusions contained in the Presentation. No Limited Party represents or warrants that the Presentation is
complete or that it contains all information about the Company that a prospective investor or purchaser may
require in evaluating a possible investment in the Company or acquisition of shares in the Company. To the
maximum extent permitted by law, each Limited Party expressly disclaims any and all liability, including, without
limitation, any liability arising out of fault or negligence, for any loss arising from the use of or reliance on
information contained in the Presentation including representations or warranties or in relation to the accuracy or
completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied,
contained in, arising out or derived from, or for omissions from the Presentation including, without limitation, any
financial information, any estimates or projections and any other financial information derived therefrom.
Forward-looking statements
The Presentation includes forward-looking statements and comments about future events, including the
Company’s expectations about the performance of its businesses. Forward-looking words such as “expect”,
“should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other similar
expressions are intended to identify forward-looking statements. Such statements involve known and unknown
risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the
Company and which may cause actual results, performance or achievements to differ materially from those
expressed or implied by such statements. Forward-looking statements are provided as a general guide only, and
should not be relied on as an indication or guarantee of future performance. Given these uncertainties, recipients
are cautioned to not place undue reliance on any forward-looking statement. Subject to any continuing
obligations under applicable law, the Company disclaims any obligation or undertaking to disseminate any
updates or revisions to any forward-looking statements in the Presentation to reflect any change in expectations
in relation to any forward-looking statements or any change in events, conditions or circumstances on which any
such statement is based. No Limited Party or any other person makes any representation, or gives any
assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking
statements in the Presentation will occur.
Past performance
Past performance is not indicative of future performance and no guarantee of future returns is implied or given.
Previously reported information
The information in this presentation that relates to previously reported Exploration Results, Exploration Targets,
Mineral Resources and Ore Reserves is extracted from the Company’s ASX announcements noted in the text of
the presentation and are available to view on the Company’s website. The Company confirms that, other than
mining depletion, it is not aware of any new information or data that materially affects the information included in
the original announcements and, in the case of estimates of Mineral Resources and Ore Reserves, that all
material assumptions and technical parameters underpinning the estimates in the relevant announcement
continue to apply and have not materially changes. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially altered.
About Manuka
✓ ASX listed mine operator,
Phased Strategy to
deliver Self-sustaining
Value Creation
developer and explorer
✓ Near-term production from Gold
and Silver assets located in the
prolific Cobar Basin, NSW
✓ Large Vanadium-rich Iron Sands
Resource located offshore of the
Taranaki Bight, New Zealand
Taranaki VTM Project2
Near Term Cashflow
▪ Large company-making iron ore
sands project
Cobar Basin Production Plan1
▪ 3.2Bt3 Vanadium, Titanium,
Magnetite (VTM) Resource
▪ 10 Year Life of Mine Plan
▪ Mining Lease granted
▪ Existing 1Mtpa Processing Plant at Wonawinta,
strategically located within the Cobar Basin.
▪ PFS completed March 2025
▪ Production Target of 13.2Moz of Silver.
Focused on bringing Cobar Basin precious
metal assets back online Q1 2026 and
advancing the Taranaki VTM Project through
the NZ Fast Track approvals process
Financial Forecasts and the Production Target should be read in
conjunction with the cautionary statement on Page 14 and Page 21
1. ASX Release 30 May 2025
2. ASX Release 23 April 2025
3. ASX Release 1 March 2023
Long Term
Strategic Value
▪ Additional gold ore from stockpiles at the Mt
Boppy Gold Mine to be processed at Wonawinta.
▪ EBITDA A$22M p.a. at an average cost of A$35/oz
silver for an NPV8 of A$101M and IRR of 109%.
▪ Restart costs are estimated at A$18.9M including
the addition of deslime circuit to the Wonawinta
Processing Plant to enhance performance.
o 5Mtpa production of critical
minerals bearing Iron ore
concentrate from seafloor iron
sands deposits.
o Capex US$602M
o US$27.2/t C1 Cost
o NPV10 of US$1.2B
o IRR 39%
▪ Start of production in Q1 calendar year 2026.
▪ Advancing through NZ’s Fast
Track approvals process
▪ Existing silver and gold bearing ROM Stockpiles
located next to the process plant.
▪ Targeting Bankable Feasibility
Study commencement in 2025
3
Wonawinta Silver Mine
Mt Boppy Gold Mine
Cobar Basin, New South Wales
4
Manuka holds Assets of Strategic Value in a Tier -1 precious metals and base metals district
2025 US$1.03B acquisition of CSA
Metals Acquisition Corp
Endeavour Mine
Current Market Cap = A$14.6B
CSA Mine
2023 acquisition of Endeavour Mine
from CBH Resources
Tritton Mines
Mt Boppy
Cobar
Current Market Cap = A$205M
2022 US$1.1B acquisition of CSA
Mine from Glencore
Peak & New Cobar Mines
Pipeline Ridge
Current Market Cap = A$783M
McKinnons
2021 A$76.7M acquisition of Peak
Mine from New Gold
Current Market Cap = A$508M
2021 Acquisition of Mineral Hill
from Quintana Holdings
Federation & Hera Mines
Current Market Cap = A$95M
Wonawinta
Manuka’s existing production facility and mining licenses provide:
•
a near-term opportunity to recommence production and take
advantage of buoyant gold and silver markets;
•
a means to monetise otherwise stranded deposits located within
current +1,000km2 tenure; and
•
an opportunity to execute commercial toll treating deals or other
strategic arrangements with third-parties.
Mineral Hill Mine
Mallee Bull, May
Day, Wagga Tank
Cobar Basin
NSW
Manuka Projects / Tenure
Other Resources / Project
Mining & Exploration Licenses
Sealed Highways
Market Capitalisations as at 30 May 2025
5
Wonawinta Silver Mine
(100% Manuka)
Figure: Aerial view of the existing Wonawinta 1Mtpa Processing Plant showing the Ball
Mill (bottom right) and CIL tanks (centre-left).
1. ASX Release 1 April 2021
2. ASX Release 30 May 2025
•
Existing 1Mtpa CIL Processing Plant and
associated Infrastructure built by CCR in
2012 for approximately A$60M.
•
Two existing and three planned Open Pits.
•
Currently on active Care & Maintenance.
•
Historic Production of 3.2Moz including
382koz by Manuka between 2022 and 2023
during which time gold ounces recovered at
a rate of 0.23% per silver ounce.
•
Total 38.5Mt Resource comprising:
o
38.3Mt at 41.3g/t Ag in ground1; and
o
0.2Mt at 60g/t Ag and 0.07g/t Au in
ROM Stockpiles2.
o
See page 8 for Resource Classification.
6
Wonawinta Silver Mine
(100% Manuka)
Figure: (Left) Silver and gold bearing ROM Stockpiles located adjacent to the Wonawinta Processing Plant to be used for commissioning and ramp up.
(Right): Aerial view of the existing Manuka Pit looking south towards the existing Boundary Pits.
7
Wonawinta Silver Mine
(100% Manuka)
Wonawinta - in-ground Resource
Resource
Mt
Ag
(g/t)
Ag
(Moz)
Pb
(%)
Pb
(kt)
Measured
1.1
47.3
1.7
0.69
7.5
Indicated
12.3
45.5
18.0
0.83
102.8
Inferred
24.9
39.0
31.3
0.39
96.9
Total
38.3
41.3
50.9
0.54
207.2
Wonawinta - ROM Stockpiles Resource
Resource
Mt
Ag
(g/t)
Ag
(Moz)
Au
(g/t)
Au
(koz)
Measured
0.1
61
0.3
0.03
0.1
Indicated
0.1
58
0.1
0.16
0.4
Total
0.2
60
0.4
0.07
0.5
Information relating to Mineral Resources is extracted from the announcement titled
‘Updated Cobar Basin Production Plan” dated 30 May 2025 and “43% Increase in
Measured & Indicated Resources at Wonawinta Silver Project” dated 1 April 2021. Both
are available to view on the Company’s website. The Company is not aware of any new
information or data that materially affects the Reserve and all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed.
Figure: Typical cross section through the shallow deposit mineralisation at
Wonawinta showing Booth Limestone and MVT Pb-Zn-Ag style mineralisation
beneath and down dip of Wonawinta silver open oxide pits.
8
Mt Boppy Gold Mine
(100% Manuka)
•
Historically one of NSW’s richest gold
mines, having produced ~500,000 oz Gold
at ~15 g/t Au.
•
Granted Mining Lease.
•
Existing 48-bed mining camp and ancillary
infrastructure located on site.
•
Total 2.6Mt Resource at 1.32g/t
•
Figure: Aerial view of Mt Boppy Gold Mine looking south across the Main Rock Dump
toward the Open Pit and TSF3 Tailings impoundment.
1. ASX Release 24 August 2023
2. ASX Release 30 May 2025
o
0.4Mt at 4.23g/t Au in-ground1; and
o
2.2Mt at 0.84g/t Au in Rock dumps,
Tailings and Stockpiles2.
o
See page10 for Resource Classification.
Opportunities to extend Resource
o
beneath existing Open Pit; and
o
along strike and en-echelon of the
existing deposit.
9
Mt Boppy Gold Mine
TSF3
(100% Manuka)
Boppy South
Existing Pit Outline
Mt Boppy - in-ground Resource
Resource
kt
Au
(g/t)
Au
(koz)
Measured
107
5.25
18.0
Indicated
158
4.86
24.7
Inferred
127
2.60
10.6
Total
392
4.23
53.5
Mt Boppy – Rock Dump, Tailings and Stockpiles
Resource
kt
Au
(g/t)
Au
(koz)
Indicated
1,362
0.69
30
Inferred
860
1.09
30.2
Total
2,222
0.84
60.2
Information relating to Mineral Resources is extracted from the announcement titled
‘Updated Cobar Basin Production Plan” dated 30 May 2025 and “360% increase in Mt
Boppy Total Gold Resources 80% increase in ‘Measured & Indicated’” dated 24 August
2023. Both are available to view on the Company’s website. The Company is not aware
of any new information or data that materially affects the Reserve and all material
assumptions and technical parameters underpinning the estimates in the relevant
market announcements continue to apply and have not materially changed.
Open
120 mRL – Depth of
current pit shell design
In-Ground Resource Outline
Open
Proposed drilling
Figure 1: Mt Boppy Long Section looking east
Figure 2: Grade estimates for the Oxide, Fresh and Tailings domains within the
Main Rock Dump based on sonic drilling program.
10
Production Plan
Highlights1
•
10 Year Mine Life
•
10.7Mt Ore Processed
•
Inclusive of 6.6Mt Reserves
•
13.2Moz Silver Recovered
•
+ Gold Credits
•
Average AISC = A$35/oz
•
A$18.9M Capital Costs
•
A$50/oz Ag, A$5,000/oz Au
•
Average A$22M p.a. EBITDA
•
NPV8 = A$101M, IRR = 109%
•
Manuka intends to restart the Wonawinta Processing Plant
that is currently on active care and maintenance.
•
The Plant will undergo a 6-month refurbishment and
upgrade, adding a front-end deslime and dewatering circuit
to enhance mill throughput and leach performance.
•
First production is anticipated in Calendar Q1 2026.
•
Commissioning and ramp up will be undertaken on silver
and gold bearing ROM Stockpiles located adjacent to the
Wonawinta Processing Plant.
•
Mining will commence in April 2026 and will see production
from the existing Manuka and Boundary Pits as well as the new
Belah, Bimble and Pothole Pits.
•
Gold Ore from Mt Boppy Stockpiles will be hauled to
Wonawinta and blended with Silver ore during the first 2 years
of production to deliver a payable gold credit.
•
Manuka has previous experience processing Wonawinta
and Mt Boppy Ore through the Wonawinta Processing Plant.
•
All major approvals are in place and in good standing.
1. ASX Release 30 May 2025
11
• Underpinned by 61% Reserves
9,000
90
8,000
80
7,000
6,000
Ore
(Mt)
Waste
(Mt)
Ag
(g/t)
Ag
(Moz)
Au
(g/t)
Au
(koz)
Mt Boppy Stockpiles
0.2
-
-
0.0
1.1
7.3
ROM Stockpiles
0.2
-
60
0.4
0.07
0.5
Manuka Open Pit
1.4
3.4
61
2.7
-
-
Belah Open Pit
1.1
5.5
67
2.4
-
-
-
Boundary Open Pit
5.5
23.9
54
9.6
-
-
Bimble Open Pit
1.8
9.0
57
3.2
-
-
0.4
0.9
41
0.5
-
-
Total
10.7
42.7
56
19.0
0.02
7.7
Ore
(Mt)
Ag
(g/t)
Ag
(Moz)
Au
(g/t)
Au
(koz)
6.2
56.4
11.2
-
-
Tonnes Mined
Source
Pothole Open Pit
63
Probable: Wonawinta In-Situ
60
0.4
0.07
0.5
Probable: Mt Boppy Stockpiles
0.2
-
-
1.1
7.3
Total
6.6
54.8
11.6
0.04
7.7
53
57
60
50
4,000
40
3,000
30
2,000
20
1,000
10
PY0
PY1
PY2
PY3
PY4
PY5
PY6
PY7
PY8
Mt Boppy Stockpiles
ROM Stockpiles
Wonawinta
Stockpiles
Manuka Pit
Belah Pit
Bimble Pit
Pothole Pit
Waste Mined
Mined Grade
PY9
PY10
PY11
Boundary Pit
100%
75%
50%
25%
-
PY1
PY2
PY3
PY4
PY5
% Measured
PY6
% Indicated
PY7
PY8
PY9
PY10
PY11
% Inferred
60.0
50.0
ASIC (A$/oz Ag)
0.2
54
5,000
42.0
36.5
40.0
Probable: ROM Stockpiles
70
60
58
47
PY0
Reserve Category
62
55
31.8
33.7
46.2
40.5
33.4
32.0
28.9
30.0
20.0
20.0
10.0
-
Information relating to Ore Reserves is extracted from the announcement titled ‘Updated
Cobar Basin Production Plan” dated 30 May 2025 and available to view on the Company’s
website. The Company is not aware of any new information or data that materially affects
the Reserve and all material assumptions and technical parameters underpinning the
estimates in the relevant market announcements continue to apply and have not materially
changed.
(10.0)
(20.0)
PY0
PY1
PY2
PY3
PY4
PY5
PY6
PY7
PY8
PY9
PY10
Transport
Mining
Processing
Site G&A
Govt. Royalty
Incremental Mt Boppy Costs
Sustaining Capex
Net Gold Credits
AISC
PY11
12
Ag Grade Mined
Production Target
Processing Plant
• Conventional CIL Circuit
• Status: Active Care & Maintenance
• Last operated by Manuka in 2023/24 to
process Gold Ore from Mt Boppy
Figure: Existing 1800kW Ball Mill
Addition of a Deslime and Dewatering Circuit to improve
mill throughput and enhance leach performance
13
Production Target
Production Year
Unit
Total
0
1
2
3
4
5
6
7
8
9
10
Total Material Mined
Mt
52.9
-
5.7
7.7
6.5
3.8
7.1
7.6
7.8
4.6
2.1
-
Waste Mined
Mt
42.7
-
4.6
6.6
5.4
2.8
6.0
6.6
6.8
3.0
1.0
-
WWTA – In Situ Ore
Mt
10.2
-
1.1
1.1
1.1
1.1
1.1
1.0
1.0
1.5
1.1
-
g/t Ag
56.5
-
55
63
62
58
53
60
47
54
57
-
Mt
0.2
-
0.2
-
-
-
-
-
-
-
-
-
g/t Ag
60.3
-
60
-
-
-
-
-
-
-
-
-
Mt
0.2
-
0.1
0.1
-
-
-
-
-
-
-
-
Gold Grade
g/t Au
1.1
-
1.0
1.1
-
-
-
-
-
-
-
-
Total Ore
Mt
10.7
-
1.5
1.2
1.1
1.1
1.1
1.0
1.0
1.5
1.1
-
Total Silver
Moz
19.0
-
2.4
2.2
2.1
2.0
1.9
2.0
1.6
2.6
2.0
-
Measured
%
7%
-
24%
4%
-
-
-
-
21%
6%
-
-
Indicated
%
54%
-
68%
82%
82%
94%
49%
18%
64%
28%
0%
-
Inferred
%
40%
-
7%
14%
18%
6%
51%
82%
15%
66%
100%
-
ROM Feed
Mt
10.7
-
1.2
1.1
1.1
1.2
1.1
1.1
1.1
1.2
1.2
0.5
ROM Silver Ounces
Moz
19.0
-
1.9
2.0
2.2
2.2
2.0
2.0
1.7
2.1
2.0
0.9
Milled / Leached Ore
Mt
7.5
-
0.9
0.9
0.8
0.8
0.8
0.8
0.7
0.8
0.8
0.3
Milled Silver Ounces
Moz
16.3
-
1.6
1.8
1.9
1.9
1.8
1.8
1.4
1.7
1.7
0.8
Overall Silver Recovery
%
70%
-
68%
63%
70%
71%
66%
69%
73%
73%
72%
72%
Recovered Silver
Moz
13.2
-
1.3
1.3
1.6
1.5
1.3
1.4
1.2
1.5
1.5
0.6
Recovered Gold
Koz
5.9
-
3.8
2.1
-
-
-
-
-
-
-
-
Silver Grade
WWTA Stockpiles
Silver Grade
Mt Boppy Stockpiles
The Production Target underpinning Financial Forecasts presented within this Presentation comprises 7% Measured Resources, 54% Indicated Resources, 40% Inferred Resources. Of the
10.7Mt Production Target 61% has been converted to Ore Reserves. There is a low level of geological confidence associated with Inferred Resources and there is no certainty that further
exploration work will result in the conversion of Inferred Resources to Indicated Resources or return the same grade and tonnage distribution. The estimated Mineral Resource and Ore
Reserves underpinning the Production Target have been prepared by a Competent Person in accordance with the requirements in the JORC Code.
14
Financial Forecast
Production Year
Unit
Total
0
1
2
3
4
5
6
7
8
9
10
Payable Silver
koz
13,184
-
1,246
1,246
1,570
1,520
1,346
1,396
1,221
1,496
1,471
672
Payable Gold
koz
5.8
-
3.3
2.6
-
-
-
-
-
-
-
-
Silver Price
A$/oz
50
50
50
50
50
50
50
50
50
50
50
Gold Price
A$/oz
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
Net Silver Revenue
A$M
655.9
-
62.0
62.0
78.1
75.6
67.0
69.4
60.8
74.4
73.2
33.4
Net Gold Revenue
A$M
29.2
-
16.3
12.9
-
-
-
-
-
-
-
-
Govt. Royalties
A$M
(16.1)
-
(1.9)
(1.7)
(2.1)
(2.0)
(1.6)
(1.6)
(1.3)
(1.7)
(1.5)
(0.7)
Total Net Revenue
A$M
669.0
-
76.4
73.2
76.1
73.7
65.4
67.8
59.4
72.7
71.6
32.7
Mining
A$M
(181.8)
-
(20.1)
(25.6)
(23.0)
(17.8)
(22.2)
(23.3)
(22.6)
(16.8)
(10.3)
-
Processing
A$M
(201.2)
(1.2)
(21.1)
(21.8)
(21.6)
(21.2)
(21.3)
(21.3)
(20.7)
(21.2)
(21.1)
(8.7)
G&A + Logistics
A$M
(59.7)
(1.4)
(6.0)
(6.0)
(6.2)
(6.2)
(6.3)
(6.3)
(6.3)
(6.3)
(6.2)
(2.5)
Mt Boppy Costs
A$M
(12.8)
-
(6.1)
(6.7)
-
-
-
-
-
-
-
-
EBITDA
A$M
213.5
(2.6)
23.1
13.1
25.3
28.4
15.6
16.8
9.9
28.4
34.0
21.5
Preproduction Capex
A$M
(16.4)
(16.4)
-
-
-
-
-
-
-
-
-
-
Sustaining Capex
A$M
(35.2)
-
(4.7)
(3.3)
(2.2)
(2.2)
(4.4)
(4.8)
(5.3)
(4.0)
(3.5)
(0.8)
Net Project Cashflow
A$M
161.9
(18.9)
18.4
9.8
23.0
26.2
11.2
12.0
4.6
24.5
30.5
20.7
NPV
A$M
100.5
IRR
%
109%
AISC
A$/oz
35.1
-
31.8
41.1
35.5
32.0
42.0
40.5
46.2
33.4
28.9
20.0
15
Value Enhancements
•
Continued Gold Credit from
Wonawinta Silver Ore (Figure 1)
currently not included in the open pit
production targets.
•
Continued Haulage of Mt Boppy
Gold Ore – current 0.2Mt Reserve
represents only 10% of the Resource
stockpiled at Mt Boppy.
•
Brownfields Exploration Results
at Mt Boppy – targeting high grade
gold beneath and along strike from
the existing open pit Resource.
•
Strategic Opportunities in the
Cobar Basin – support development
of nearby stranded assets that lack
sufficient scale to justify standalone
processing infrastructure.
Figure 1: Gold to Silver payables during Manuka Silver Ore production at Wonawinta
Figure 2: High Grade Open Pit Mining at Mt Boppy by Manuka in 2020-2021
16
Project Implementation
Indicative Timeline to Production
Plant Upgrades
10.5
0.0
10.5
Plant Refurb
1.8
0.7
2.5
Camp & Admin
0.2
1.5
1.7
Restock Stores & Lab
0.5
0.5
1.0
Reagent First Fills
1.0
-
1.0
Tailings Dam Lifts
1.0
29.4
30.4
Sustaining Capex
-
3.1
3.1
10% Contingency
1.5
-
1.5
Capital Costs
16.4
35.2
51.6
Jun
May
Apr
Feb
Jan
Dec
2026
Nov
Oct
Workstream
Sep
Total
Aug
2025
Jul
Item
Pre
During
Production
Ops
Mar
Capital Cost Breakdown
Final Investment Decision
Re-establish Camp
Re-establish Offices, Stores & Workshop
Refurbish, Modify & Processing Plant
Commission Process Plant
Steady State Production
Construct TSF Lift 3
First Shipment of Silver Concentrate
Mobilise Mining
Staff Ramp-Up
2.6
-
2.6
Mining Commencement
Total Cost
18.9
35.3
54.2
17
Taranaki VTM Project,
South Taranaki Bight New Zealand
3D rendering of the proposed Integrate Mining Vessel to be used to mine (via seabed crawlers) and concentrate VTM Iron Sands for sale and redeposit residual sand on the sea floor
18
About the Taranaki
VTM Project
✓ 100% Owned by Manuka’s subsidiary
Trans Tasman Resources (“TTR”)
✓ Granted Mining Permit MMP5551 and
exploration permit MEP54068.
✓ 3.2Bt Resource1 of Vanadiferous
Titanomagnetite (“VTM”) sands
located in the shallow waters of the
South Taranaki Bight, New Zealand.
✓ NZ$85M spent on Technical and
Environmental Studies since 2009
✓ Updated Pre-Feasibility Study
completed (2025) showing an NPV10
of US$1.26Bn and IRR of 39%2
1.
2.
ASX Release 1 March 2023
ASX Release 26 March 2025
Figure: Location of the Taranaki VTM Project with respect to Mineral
Resource outline, granted Mining Permit MMP55581 (within New Zealand’s
Exclusive Economic Zone) and Exploration Permit MEP54068 (within New
Zealand Territorial Waters).
19
Pre-Feasibility Study
Highlights
ASX Release 26 March 2025
3.2Bt Mineral Resource
NPV10
US$1.26B
IRR 39%
US$312M
EBITDA
per annum
Large World Class Iron Sands Deposit, South Taranaki Bight NZ.
Initial 20-year Mine Life
with material mine life extension opportunities
4.9Mtpa 56-57%Fe
+ Vanadium and Titanium (Critical Minerals) co-products
US$27.2/t C1 Cost
excluding any co-product credits
US$602M Project Capex
(inclusive 14% contingency)
National Significance
Project included in NZ Government’s Fast-Track Approvals Act 2024
Mt Taranaki, NZ
Macroeconomic assumptions include 13.7% discount to a flat benchmark Fe concentrate pricing of US$90/t CFR China, V2O5 co-product
pricing of US$5.45/lb (multiplied by a 77% third party recovery rate and 50% payability) and Capesize freight rates of US$10/t.
20
Resource1 and
Production Target2
Resource
Bt
Fe2O3
TiO2
V2O5
Indicated
1.4
10.37%
1.05%
0.05%
Inferred
0.5
8.81%
0.90%
0.04%
MMP55581
1.9
9.99%
1.01%
0.05%
Indicated
0.7
10.61%
1.07%
0.05%
Inferred
0.6
10.26%
1.04%
0.05%
MEP54068
1.3
10.44%
1.05%
0.05%
Total
3.2
10.17%
1.03%
0.05%
Information relating to Exploration Results, Sampling Techniques and Data, and
Mineral Resources for the Taranaki VTM Project is extracted from the
announcement titled ‘Maiden Vanadium Resource at Taranaki VTM Iron Sand
Project” dated 1 March 2023 and available to view on the Company’s website.
The Company is not aware of any new information or data that materially affects
the information used to compile the 2023 Mineral Resource and all material
assumptions and technical parameters underpinning the estimates in the relevant
market announcements continue to apply and have not materially changed.
1.
2.
ASX Release 1 March 2023
ASX Release 26 March 2025
Initial Mine Plan of 20 Years is based on mining 1Bt of
Iron Sands granted Mining Lease MMP55581 to produce
4.9Mt pa of VTM Concentrate2.
Total Resources within MMP55581 comprises 75%
Indicated Resources and 25% Inferred Resources.
Mining for the first 13 years will focus on the Cook South
block of the Resource which comprises 95% Indicated
Resources and 5% Inferred Resources1.
Metallurgical assumptions supporting the Production
Target are based Davis Tube Recovery and bulk
samples Pilot Plant Test Work undertaken on samples
collected from 726 drill holes across the Resource1,2.
The Production Target underpinning PFS financial forecasts comprises 75% Indicated and 25% Inferred
Resources. Further evaluation work and appropriate studies are required to establish sufficient confidence that this
target will be met. There is a low level of geological confidence associated with Inferred Resources and there is no
certainty that further exploration work will result in the conversion of Inferred Resources to Indicated Resources or
return the same grade and tonnage distribution. The Mineral Resource underpinning the Production Target has
been prepared by a Competent Person in accordance with the requirements in the JORC Code.
21
National Significance
Fast Track Approvals Process
15 Apr 25 - Application Lodged
✓ New Zealand’s stated objective is to
15 May 25 - Application Deemed Completed
double mineral export earnings from
NZ$1.5B to NZ$3B per annum over
the next decade1.
29 May 25 - No Competing Application Decision Made
Expert Panel to be Appointed
✓ The Taranaki VTM Project is forecast
Panel Decision
to generate NZ$854M revenue per
annum representing over 50% of the
targeted increase.
“The Project will deliver substantial benefits to the Taranaki
and Whanganui regions, including:
✓ Both vanadium and titanium have
recently been named on New
Zealand’s Critical Minerals List.
•
Over 300 new full-time local jobs;
•
NZ$238M p.a. expenditure injected into the local economy.”
New Zealand Institute of Economic Research
✓ The Project will support the NZ
Government delivering against its
critical minerals policy objectives.
1.
2.
https://www.odt.co.nz/business/govt-aims-double-mining-exports-2035
https://environment.govt.nz/acts-and-regulations/acts/fast-track-approvals
22
Corporate Summary
Shares Outstanding
810M
Options Outstanding
190M
Share Price
A$0.037
Market Capitalisation
A$30.0M
Cash
A$0.8M
As at 31 March 2025
Debt Outstanding
•
•
0.10
16
0.08
12
0.06
8
0.04
4
0.02
0
~A$40.7M
As at 31 March 2025
20
0.00
01-Nov-23
A$19.5M TransAsia Pty Ltd - Senior Debt Facility
A$14.3M Tennant Metals SA Pty Ltd - Trade Finance Facility
Share Price (A$/sh)
Capital Structure
Share Volume (M Shares)
Share Price History
01-Feb-24
01-May-24
01-Aug-24
Volume
01-Nov-24
01-Feb-25
01-May-25
Share Price
Share Price Catalysts for H2 2025:
Board And Management
▪
Continued strength in the Gold and Silver markets
Dennis Karp
Executive Chairman
▪
Refinance of the TransAsia Term Debt Facility
Alan Eggers
Executive Director, Chairman TTR
▪
John Seton
Non -Executive Director
Secure non-dilutive funding to support Restart Precious Metal
Production in the Cobar Basin
Haydn Lynch
Chief Operating Officer
Dieter Engelhardt
Project Manager
▪
Near Term Production at Mt Boppy and Wonawinta
Phil Bentley
Chief Geologist
▪
Further progress of the VTM Project approval process
▪
Commencement of the VTM Project Bankable Feasibility Study
23
Corporate Office:
Suite 405 Grafton Bon
Share your feedback
Discover