Taranaki VTM Project Delivers Robust Pre-Feasibility Study
Released
Released
Announcement PDF
ASX Announcement
26 March 2025
ASX: MKR
Taranaki VTM Project Delivers Extremely Robust PreFeasibility Economics – Full Speed Ahead
Highlights
1
2
•
Updated Pre-Feasibility Study1 (“PFS”) released for the New Zealand-based
Taranaki VTM Project (“the Project”) owned by Manuka Resources Limited
(“MKR”, the “Company”) subsidiary, Trans-Tasman Resources Limited (“TTR”).
•
Initial 20-year Production Target underpinned by 75% Indicated Resources and
25% Inferred Resources located on granted Mining Permit MP55581.
•
Project to deliver a significant contribution to local development in the
Taranaki region of New Zealand and assist the NZ government in delivering
against its critical minerals policy objectives.
•
The Project was included in Schedule 2 (projects to be directly referred to an
Expert Panel) of the recently passed New Zealand Fast Track Approvals Act
20242.
•
Following completion of the current approval process, the Company intends to
progress to a Bankable Feasibility Study (“BFS”) consisting of detailed vessel
engineering and the development of procurement and funding strategies.
•
The Company will shortly submit its approval application and commence
the New Zealand Fast Track approvals process.
https://www.manukaresources.com.au/site/projects/taranaki-vtm-project/studies
https://environment.govt.nz/acts-and-regulations/acts/fast-track-approvals
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
MKR Director and TTR Executive Charman Alan Eggers commented:
The Taranaki VTM Project is an exciting, financially robust and potentially companymaking opportunity that provides Manuka shareholders with strategic exposure to
critical minerals. The outstanding PFS results released today build upon a substantial
body of technical and environmental work completed over the past 10 years.
The Project is one of national significance for New Zealand whose stated objective is to
double mineral export earnings from NZ$1.5B to NZ$3B per annum over the next
decade. The Taranaki VTM Project is forecast to generate NZ$854M revenue per
annum representing over 50% of the targeted increase.
Importantly, the Project will deliver substantial benefits to the Taranaki and Whanganui
regions with over 300 new full-time local jobs and NZ$238M per annum expenditure
injected into the local economy.
With the updated PFS complete, we are now looking forward to progressing the Project
through the New Zealand Fast-Track approvals process and turning our attention to
workstreams related to Project delivery and execution”
Project Overview
The Taranaki VTM Project (“the Project”) is located offshore along the west coast of
the North Island of New Zealand in the South Taranaki Bight within water depths of
between 20m to 50m and comprises granted mining permit MMP55581 and granted
exploration permit MEP54068 covering a large world-class Resource of vanadium and
titanium bearing iron sands located on the seabed floor (Figure 1, Table 1).
Both vanadium and titanium have recently been named on
New Zealand’s Critical Minerals List.
The Project PFS contemplates the mining of iron sands from the shallow seabed floor
within MP55581 via an underwater seabed crawler at a rate of 50Mtpa. The crawler will
pump sediment as seawater slurry to a surface vessel (Integrated Mining Vessel, “IMV”)
(Figure 2) where the sand will undergo beneficiation into a saleable vanadiferous
titanomagnetite (“VTM”) concentrate with an iron grade of ~57% Fe, 0.50% V2O5 and
titanium of 8.4% TiO2.
The Project is scheduled to produce VTM concentrate at a rate of 4.9Mtpa. The balance
of the mined sand (~45Mtpa) will be returned continuously to the seabed floor behind
the surface vessel where it will be restored to its natural state within two years.
Page 2
Figure 1: Location of the VTM Project with respect to Mineral Resource outline, granted
Mining Permit MMP55581 (within New Zealand’s Exclusive Economic Zone) and
Exploration Permit MEP54068 (within New Zealand Territorial Waters).
Figure 2: The proposed Integrated Mining Vessel and associated subsurface seabed
crawler and simultaneous re-deposition of post processed sands.
Page 3
Table 1: VTM Project Mineral Resource Estimate (March 2023)
Resource
Bt
Fe2O3
TiO2
V2O5
Indicated
1.4
10.37%
1.05%
0.05%
Inferred
0.5
8.81%
0.90%
0.04%
MMP55581
1.9
9.99%
1.01%
0.05%
Indicated
0.7
10.61%
1.07%
0.05%
Inferred
0.6
10.26%
1.04%
0.05%
MEP54068
1.3
10.44%
1.05%
0.05%
Total
3.2
10.17%
1.03%
0.05%
See ASX Announcement 1 March 2023. All Resources are reported at a 3.5% DTR cut-off except for the Tasman
Block which is reported at a 7.5% Fe2O3 Cut-Off
Production Overview
The iron sands will be mined using two seabed crawlers (Figure 3), one operating and
one standby. Sand extraction (50Mtpa) will occur in lanes, on average 5m deep with the
crawler advancing at a rate of 0.04km/h and pumping 8,000 tph of sand as a seawater
slurry to the IMV.
The ROM sand will be screened, magnetically separated and ground before final
magnetic separation to produce a clean concentrate. All processing will be done wet
using seawater throughout the process. The final concentrate will be dewatered to
~10% moisture and stored temporarily on the IMV before being slurried with fresh water
from a reverse osmosis (RO) desalination plant.
The slurry will be pumped to a floating storage and offloading vessel (“FSO”) where it
will be dewatered and stored in the FSO holds. Once fully loaded, the FSO sails to a
sheltered area (if required by prevailing weather conditions) where it offloads the cargo
to an ore carrier, typically a Capesize vessel for shipment to market.
Tailings will be disposed of in real-time via a fall pipe extending forward off the port side
of the IMV such that the tailings are deposited as far as possible from the face of mine.
The tailings disposal fall pipe will be of a similar design to a trailing suction hopper
dredge drag arm. The tailings will first be dewatered via hydro cyclones with the
wastewater disposed of separately along the tailings fall pipe.
Operations will be 24 hours a day, 7 days per week with an estimated 28% downtime
due to inclement weather conditions, servicing and maintenance.
Page 4
Figure 3: Example of a Seabed crawler
Market Overview
Vanadiferous Titanomagnetite (Fe₃O₄ with vanadium and titanium content) is a distinct
iron ore type that differs from traditional hematite (Fe₂O₃) and hard rock magnetite
(Fe₃O₄). While hematite remains dominant in seaborne trade, both hard rock magnetite
and vanadiferous titanomagnetite have been gaining importance due to beneficiation
potential and specialised steel applications.
VTMs (57% Fe) presents both challenges and opportunities in the Chinese iron ore
market. While historical trades have been at a discount to standard hematite fines, its
standard form, specialty steel applications, blending potential, and strategic positioning
in the decarbonisation trend make it a viable export commodity.
VTMs (57%) historically have been priced at a discount of $5-$15/dmt (10-15%
discount/dmt) relative to 62% Fe fines (Platts IODEX). The underlying discount today
depends on the titanium and vanadium content and even low-grade ores (52-54% Fe)
can trade at a premium to the 62% price depending on the contained percentages of
vanadium pentoxide (V2O5) within the ore.
Both vanadium and titanium are crucial for a range of applications, including aerospace,
renewable energy storage and technologies, and advanced manufacturing. Their
strategic importance is further demonstrated by the fact that nations such as Australia,
the United Kingdom, the United States, Canada, and the European Union also classify
them as critical minerals.
Page 5
Financial Evaluation
The Project is forecast to produce concentrate at a cost of
US$27.20/tonne and generate an annual EBITDA of US$312M over
a 20-year initial mine life to deliver a Post Tax NPV10 US$1.26B
and IRR of 39% on an initial investment of US$602M.
Macroeconomic assumptions include 13.7% discount to a flat benchmark Fe
concentrate pricing of US$90/t CFR China, V2O5 co-product pricing of US$5.45/lb
(multiplied by a 77% third party recovery rate and 50% payability) and Capesize freight
rates of US$10/t.
No revenue is assumed to be derived from the TiO2 (titanium oxide) co-product.
The figures are presented on a real (non-escalated) basis. A tax rate of 28% has been
applied and US$100M of carried forward losses have been factored into the analysis.
The operational expenditure (“OPEX”) for the Project is estimated to be US$27.20 per
metric tonne of concentrate. The breakdown in Table 2 highlights OPEX elements.
Table 2: Breakdown of Unit Operating Costs
OPEX Costs by Flowsheet Item
US$/t Concentrate
8,000tph Seabed Crawler
US$ 1.29
Integrated Mining Vessel
US$ 15.34
Floating Storage and Offloading (FSO) Vessel
US$ 7.72
Anchor Handling Tug
US$ 1.85
Environmental Monitoring Vessel
US$ 1.00
Total
US$ 27.20
OPEX Costs by Input Item
US$/t Concentrate
Contractor Costs (FSO)
US$ 7.00
Fuel
US$ 8.12
Repairs & Maintenance
US$ 2.04
Labour
US$ 6.27
Insurance
US$ 0.57
Other Costs (Misc.)
US$ 2.20
Enviro Monitoring & Training
US$ 1.00
Total
US$ 27.20
Page 6
The total Capital Expenditure (“CAPEX”) for the Taranaki VTM Project is estimated to
be US$602M. This includes costs for project management, consultancy, procurement,
and contingency reserves. The breakdown of these costs are shown in Table 3. The all
equipment cost estimate accuracy is +/-30%. Contingency applied across all the items
is 14% (US$84.4M) of the total CAPEX.
Table 3: Breakdown of Capital Costs
Component
Item
Capex Estimate
IMV
Hull
$61,213,399
Equipment
$37,956,005
Integration
$54,128,825
Process Plant
$183,864,152
Dewatering
$18,068,794
Crawler
$111,953,187
Power Generation
$74,479,898
Desalination
$26,095,570
PM&E
$34,423,194
Process
Mining Systems
Auxiliary
Management
Total
$602,183,024
Each capital Item comprises the following cost segments:
•
Project Management: Consultancy, travel, and administrative setup.
•
BFS & Engineering/Design: Covering resource definition, environmental
initiatives, and infrastructure planning.
•
Procurement: The largest cost category, including:
o IMV elements (hull, machinery, piping, etc.).
o Specialised processing equipment from the USA and Europe.
o Process plant equipment such as pumps and screening systems.
•
Risk-Based Contingency: Addressing uncertainties and potential risks.
Based on the strong operating cash flows generated by the Project (US$312M EBITDA
per annum) it is anticipated that it will support typical project financing debt terms of
60% gearing, 5-year loan life at a 2x Debt Service Cover Ratio.
The size and robust economics of the Project give the Company sufficient confidence
that the equity contribution to the development CAPEX would be raised via public
markets and potential investment from strategic partners.
Page 7
Project Sensitivities
2,000
1,800
NPV10 (US$M)
1,600
1,400
1,200
1,000
800
600
25%
Opex
20%
15%
Capex
10%
5%
Fe Index
0%
-5%
Production Rate
-10%
-15%
-20%
-25%
Vanadium Revenue
Next Steps
The Project was specifically included in Schedule 2 of New Zealand’s recently legislated
Fast Track Approvals Act 2024. The objective of the legislation is to provide a
streamlined decision-making process to facilitate the delivery of infrastructure and
development projects with significant regional or national benefits.
The Company is well placed to submit its approval application and
commence the New Zealand Fast Track approvals process within the
coming weeks.
Subject to completion of the regulatory approval processes, the Company intends to
move into Definitive BFS workstreams which consist largely of detailed vessel
engineering and the development of procurement and funding strategies.
This announcement has been approved for release by the Board of Manuka Resources
Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. +61 412 268 114
Admin@manukaresources.com.au
Page 8
Compliance Statement
Information relating to Mineral Resources for the Taranaki VTM Project is extracted from
the announcement titled “Maiden Vanadium Resource at Taranaki VTM Iron Sand
Project” dated 1 March 2023 and available to view on the Company’s website. The
Company is not aware of any new information or data that materially affects the
information used to compile the Mineral Resource and all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed.
Cautionary Statement
The Pre-Feasibility Study (“PFS”) outlined in this announcement has been undertaken
to explore the technical and economic feasibility the Company’s 100% owned VTM
Project, located in the South Taranaki Bight, New Zealand (the Project).
The Production Target underpinning financial forecasts comprises 75% Indicated and
25% Inferred Resources. Further evaluation work and appropriate studies are required
to establish sufficient confidence that this target will be met. There is a low level of
geological confidence associated with Inferred Resources and there is no certainty that
further exploration work will result in the conversion of Inferred Resources to Indicated
Resources or return the same grade and tonnage distribution. The Mineral Resource
underpinning the Production Target has been prepared by a Competent Person in
accordance with the requirements in the JORC Code.
The economic outcomes associated with the PFS are based on certain assumptions
made for commodity prices and exchange rates and other economic variables, which
are not within the Company’s control and subject to change from time to time. Changes
in such assumptions may have a material impact on economic outcomes.
To achieve the range of outcomes indicated in the PFS, additional funding will be
required. Investors should note that there is no certainty that the Company may be able
to raise the amount of funding when needed and/or reach a Final Investment Decision.
It is also possible that such funding may only be available on terms that may be dilutive
to, or otherwise affect the value of Manuka’s existing shares. It is also possible that
Manuka could pursue other ‘value realisation’ strategies such as a sale or partial sale
of the Company’s share of the Project.
This announcement contains forward‐looking statements. Manuka has concluded it has
a reasonable basis for providing the forward‐looking statements included in this
announcement and believes it has a reasonable basis to expect it will be able to fund
the development of the Project. However, several factors could cause actual results, or
expectations to differ materially from the results expressed or implied in the forwardlooking statements. Given the uncertainties involved, investors should not make any
investment decisions based solely on the results of the PFS.
Page 9
About Manuka Resources Limited
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration
company with key gold and silver assets located in the Cobar Basin (NSW), and offshore
vanadium and titanium bearing iron sands in the South Taranaki Bight of New Zealand.
The Mt Boppy Gold Mine (Cobar Basin, NSW)
The Mt Boppy gold mine is located 43 km east of Cobar, in the Central West region of
New South Wales. A resource update was released on ASX on 16 April 2024.
The Company has to date processed its stockpiles and gold mineralised waste product
through its Wonawinta plant. Manuka are currently pursuing a strategy of establishing
of a fit-for-purpose, on-site crush-screen-mill-float facility to enhance the economics of
the Mt. Boppy Mine and the value of near-mine prospects. The Mt Boppy site includes
a 48-person mine camp and is fully permitted for the proposed processing plant and onsite production.
The Wonawinta Silver Mine (Cobar Basin, NSW)
Previously Australia’s largest primary silver producer, Wonawinta produced
approximately 3 million ounces of silver during 2012-2013, and an additional 500,000oz
of silver in 2022. The mine hosts a significant Resource3 - including stockpiles and
shallow oxide material, Wonawinta contains total Resources of 38.8 million tonnes at
42 g/t Ag for 52.4 million ounces. Furthermore, on 29 October the Company released
its maiden Ore Reserve of 4.8Mt4 at 53.8g/t Ag containing 8.4Moz of silver comprising:
-
Proved Ore Reserves of 0.8Mt at 50.8g/t Ag; and
Probable Ore Reserves of 4.1Mt at 54.3g/t Ag.
The Wonawinta processing plant has a nameplate capacity of approximately 850,000
tpa. The Company is reviewing the potential of recommencing operations at Wonawinta,
taking advantage of the strengthening silver price environment.
The Taranaki VTM Project (South Taranaki Bight, New Zealand)
Manuka is the 100% owner of the Taranaki VTM (vanadium titanomagnetite) Iron Sands
Project. The 3.2Bt Taranaki VTM Project Resource was released on ASX on 1 March
2023.
The Project is located 22km to 36km offshore in New Zealand’s EEZ, or Exclusive
Economic Zone, outside the 12 nautical limit from the shoreline, in waters ranging
between 20 to 50 metres depth and has a granted mining permit, MMP55581, permitting
production of 5Mtpa. On granting of final government approvals to operate the Company
will complete its Bankable Feasibility Study (BFS) on the Project. The Project is
anticipated to sit in the lowest quartile of the iron ore production cost curve.
3
4
ASX Release 1 April 2021
Arithmetic errors may be present due to rounding
Page 10
Appendix 1: Additional Information
Project Description
Incorporated in September 2007 New Zealand registered company Trans-Tasman
Resources (“TTR”) was established to explore, assess and uncover the potential of the
offshore titanomagnetite iron ore deposits along the west coast of the North Island of
New Zealand. TTR’s ambition is to provide a reliable supply of low-cost iron ore
concentrate, containing valuable vanadium and titanium metal credits, and build
mutually beneficial strategic long-term partnerships with mineral processing facilities
and steel manufacturers. TTR is committed to conducting all its activities in a safe and
environmentally sustainable manner and to proactively engage with existing interests,
local and regional authorities, iwi groups and local communities on all relevant
economic, environmental, cultural and social issues.
The aim of the Pre-Feasibility Study (“PFS”) is to present the proposed operational
process, along with an economic evaluation of the selected ore recovery and mineral
processing techniques and methods, to achieve the following objectives.
•
Run-of-Mine Extraction: The offshore iron ore will be extracted from the
identified and reported mineral resources using efficient and environmentally
responsible mining techniques.
•
Ore Beneficiation: The extracted VTM ore grading 10.17% Fe2O3, 1.03% TiO2
and 0.05% V2O5 will undergo a mineral beneficiation process to increase the
iron content, producing a VTM concentrate with an iron grade of 56-57% Fe
with vanadium grade of 0.5% V2O5 and titanium of 8.4% TiO2.
•
Concentrate Washing and Logistics: The VTM concentrate will be processed
and beneficiated on a dedicated Integrated Mining Vessel (“IMV”), washed in
fresh water to a Floating and Storage Offloading Vessel (“FSO”), dewatered
and transferred to bulk Capesize vessels at sea for export to a third-party
processing plant for further treatment and final metal recoveries.
•
Vanadium Extraction: At third party processing plant, advanced metallurgical
methods will be applied to extract the recoverable vanadium from the VTM
concentrate.
•
Iron Ore for Steelmaking: The remaining iron ore, after vanadium extraction,
will be delivered to a steelmaking facility where it will serve as feedstock for
blast furnace operations.
•
Market Shipment: A VTM concentrate suitable for international markets will be
prepared and shipped to global customers.
•
Capital and Operating Cost Estimate: A capital (Capex)and Operating (Opex)
estimate with an accuracy level of ±30%.
Page 11
The PFS provides a comprehensive overview of the entire value chain including
engineering and environmental management solutions, mineral extraction and
beneficiation to product shipment and export, value-added processing and economic
feasibility.
Option Study Overview
In the previous revision of the PFS (2014), several mining system options were
thoroughly reviewed and evaluated. Initially, a simple dredging option was
commissioned during the early stages of the study. However, a subsequent workshop
held with IHC in the Netherlands explored a broader range of options to identify the
most suitable and sustainable solution for TTR's operations. The options assessed
included integrated crawler systems, trailer suction hopper dredges (TSHD), drill ship
recovery (Drill), roll-on/roll-off (Ro-Ro) systems, and point suction dredges (PSD).
These systems were evaluated based on key performance indicators such as resource
optimization and mining efficiency, operational ocean depth (20m to 50m), capacity,
flexibility, logistical complexity and tailings dispersal management and marine
environmental impact.
The structured decision analysis revealed that the Drill, Ro-Ro, and PSD systems were
not viable options due to limitations in efficiency, flexibility, and environmental
performance. The results identified two promising candidates: the TSHD, as detailed in
the initial PFS report, and the integrated mining vessel and crawler system (IMV) similar
to the proven and operating design used by De Beers Marine of South Africa now for
over 30 years.
While the TSHD demonstrated scalability, it posed significant challenges regarding
tailings dispersal. Its operation could create large sediment plumes due to limited control
over tailings return. In contrast, the IMV crawler system, with its precise and (based on
grade control drilling) targeted extraction process able to avoid zones of high (>2%) silt,
and controlled return of the de-ored sediments (tailings) to the seafloor, minimises
plume generation. By employing a tailings pipe and pressure diffuser to around 4m
above the seabed, the system will return sediment to the seabed in a controlled manner,
reducing the suspended sediment impact in the surrounding water column.
Based on these findings, it was clear that utilising proven IMV seabed crawler
technology offered the lowest project risk along with the most effective and
environmentally responsible mining solution, particularly given its superior tailings
management capabilities. The seabed crawler will be remotely operated from a surface
support vessel and equipped with advanced acoustic navigation and imaging systems
to ensure precise, systematic extraction along pre-defined grade controlled lanes. It will
pump the unconsolidated surface sediment to the IMV vessel for processing and
beneficiation. The high-precision nature of the crawler's operation ensures
comprehensive coverage of the target area, able to avoid areas of high silt loads,
eliminating the need for re-mining and enhancing overall efficiency. The mining vessel
will employ a dynamic positioning system with multiple anchors to maintain accurate
placement during ore extraction and redeposition of tailings onto the seafloor, ensuring
safe and effective operations across the designated mining zones.
Page 12
Project Geology
Titanomagnetite iron sand forms Quaternary onshore beach and dune deposits and
offshore marine deposits along approximately 480 kilometres of coastline from Kaipara
Harbour in the north, south to Wanganui on the west coast of the North Island, New
Zealand. The onshore deposits include the present beach and dune sand, and older
coastal sand deposits that have been preserved by uplift due to faulting and/or lowering
of sea level.
The titanomagnetite mineral is sourced from the Quaternary volcanic rocks of western
Mount Taranaki and the volcanic rocks of the Taupo Volcanic Zone, transported to the
coast by rivers, along the coast by shallow marine longshore currents, and subsequently
concentrated by wave, wind and tidal action into beach and dune lag deposits.
From the interpretation of the exploration information, the geological model of the
offshore iron sand deposits can be represented as areas, consisting of remnant coastal
beach and dune lag deposits that were constructed, in the same geological process as
the current onshore dune deposits, at a time of lower sea levels of around 30m to 50m
during the last glaciation from around 9,000 to 15,000 years ago. These paleo-dune
features were part of an ancient river system in which dunes formed contemporaneously
at the mouth of the river(s) and the coastline. The rivers are locally controlled by active
faulting with the iron sands within the river channels and dunes partially reworked by
currents and longshore drift then inundated and reworked by the rising and
transgressing seas over the last 7,000 to 8,000 years.
Exploration Summary
TTR have undertaken extensive exploration activities within its tenement areas, and in
particular within the proposed mining area within MMP55581. Exploration activities have
included, high resolution aeromagnetic surveys, high resolution 2D seismic surveys,
multi beam sonar bathymetry surveys, ROV video surveys of seafloor, multiple
programs of shallow and deep drilling, bulk metallurgical sampling and pilot plant
processing. From these exploration and processing activities TTR has been able to
report a JORC Mineral Resource Statement using drilling methods that have been
independently technically verified to enable representative sampling at depth of the
seabed titanomagnetite resource.
Page 13
Mineral Resource
On 1 March 2023, MKR reported the mineral resource estimates for its Taranaki VTM5
iron sand project located in the STB off the west coast of the North Island, New Zealand
The 3.2Bt Indicated and Inferred mineral resource of 10.17% Fe 2O3, 1.03% TiO2 and
0.05% V2O5 contains 1.6Mt vanadium pentoxide ranking the deposit as one of the larger
drilled vanadium deposits globally.
Three contiguous resource deposits, the Cook, Kupe and Tasman VTM deposits that
make up the Taranaki VTM project, are separately reported. The mineral resource and
Davis Tube Recovery (DTR) concentrate estimates reported, based on all available
assay data as of 1 January 2015, include iron oxide and iron (Fe 2O3 & Fe), titanium
dioxide (TiO2) and vanadium pentoxide (V2O5) mineral resource estimates.
The mineral resource estimates for Cook, Kupe and Tasman deposits, have been
reported separately for each of the North Blocks inside the 12Nm limit within Mineral
Exploration Permit MEP54068 (Resource Management Act (RMA) approval area) and
the South Blocks outside the 12Nm limit within Mineral Mining Permit MMP55581
(Exclusive Economic Zone (EEZ) approval area) (Table A1).
The mineral resource estimates are prepared and classified in accordance with the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code 2012).
Table A1: Taranaki VTM Mineral Resource Estimate
*DTR is Davis Tube Recovery of the magnetic fraction of the sample
The reported mineral resource estimate for the contiguous Cook, Kupe and Tasman
The JORC classification of Indicated and Inferred resource categories for the reported
1.881Bt VTM resource for the Cook, Kupe and Tasman South Blocks, limit within
MMP55581, are presented in Table 2. The 1,881Mt Resource within MMP55581
comprises 1,418Mt, or 75%, Indicated and 463Mt, or 25%, Inferred resource categories
(Table A2).
5
Vanadiferous titanomagnetite (Fe2.74Ti 0.24V0.02O4).
Page 14
Table A2: Breakdown of Indicated and Inferred Mineral Resources within Mining
Permit MMP55581 located outside the 12Nm
Mining
A mining block model was created from the geological model. The mining model was
regularised to a consistent block size of 250 m × 250m × 1m. Bench tonnages for the
proposed mining areas were calculated by summing the blocks that have the block
centroid within an area. Figure A1 shows the outline of these regularised blocks, which
were constrained due to the Mining Permit boundary at the time of that study.
The basis for the PFS concept is a mobile device with a submersible dredge pump and
slewing boom configuration. The concept is based on many years of actual operational
experience of the mining and dredge processes, and the designing of offshore
mining/dredge systems, submerged pumps, dredge components and subsea tracked
vehicles within the De Beers Marine SA group.
It is proposed to have the seabed crawler and the IMV both aligned along the SW - NE
mining direction. This alignment direction is parallel to the prevailing wind/wave direction
(facing into the waves/wind) and perpendicular to the prevailing current direction.
The seabed crawler will be located on the sea floor, connected to the IMV via an
umbilical delivery tube. A winching system will be used to locate the IMV relative to the
seabed crawler which will be working 300m × 300m blocks in a predetermined
sequence.
Page 15
The PFS schedule contemplates mining via the seabed crawler at a rate of 50Mtpa
based on the following assumptions:
•
Seabed Crawler throughput = 8,000tph
•
Annual operation hours = 6,326hrs
•
Calculated scheduling rate = 8,000tph × 6,326hrs pa = 50.0Mtpa.
•
Based on 72% SBC and IMV production utilisation rate and 28% downtime for
servicing, weather events and breakdowns.
Figure A2: Defined Mining Areas and Updated Mineral Resource Blocks within MMP55581
Note Kupe South and Tasman South have since been added to the schedule based on
the expanding Mining Permit.
Page
Share your feedback
Discover