Optimised Production Plan for the Mt Boppy Gold Mine
Cobar Basin, New South Wales
Corporate Presentation - 30 September 2024
Disclaimer
This disclaimer applies to this presentation and the information contained in it (the Presentation). By reading
this disclaimer you agree to be bound by it. The Presentation has been prepared by Manuka Resources Limited
and relates to its subsidiaries, related parties and any new assets or entities subsequently acquired or
incorporated (collectively the Company). The Presentation was prepared on 30 September 2024 and the
information in it is subject to change without notice.
Purpose
The Presentation is for information purposes only and is an overview of the Company and its assets at the time
of preparation. This Presentation does not contain all information necessary to make an investment decision or
that would be required in a prospectus or product disclosure statement prepared in accordance with the
requirements of the Corporations Act 2001 (Cth) (Corporations Act). The Presentation is of a general nature
and does not purport to be complete or verified by the Company or any other person.
Distribution outside Australia
Distribution or release of this document outside Australia may be restricted by law. This document may only be
distributed or released to a person that is not in the United States except as permitted under the U.S. Securities
Act. Persons who come into possession of this document who are not in Australia should seek advice on and
observe any such restrictions. Any failure to comply with such restrictions may constitute a violation of applicable
securities laws.
Not an offer or financial product advice
The Presentation does not constitute an offer, invitation, solicitation or recommendation with respect to the
purchase or sale of any security in the Company nor does it constitute financial product advice. The Presentation
is not a prospectus, product disclosure statement or other offer document under Australian law or under any
other law. The Presentation has not been filed, registered or approved by any regulatory authority in any
jurisdiction. The Presentation is not intended to be relied upon as advice or a recommendation to investors and
does not take into account the investment objectives, financial situation, taxation situation or needs of any
particular investor.
An investor must not act on the basis of any matter contained in the Presentation and must make its own
assessment of the Company and conduct its own investigations and analysis. Investors should assess their own
individual financial circumstances and consider talking to a financial adviser, professional adviser or consultant
before making any investment decision. Neither this Presentation nor anything contained in it forms the basis of
any contract or commitment and no agreement to subscribe for securities will be entered into on the basis of this
Presentation.
No guarantee, representation or warranty
While reasonable care has been taken in relation to the preparation of the Presentation, none of the Company or
their respective directors, officers, employees, contractors, agents, or advisers nor any other person (Limited
Party) guarantees or makes any representations or warranties, express or implied, as to or takes responsibility
for, the accuracy, reliability, completeness or fairness of the information, opinions, forecasts, reports, estimates
and conclusions contained in the Presentation. No Limited Party represents or warrants that the Presentation is
complete or that it contains all information about the Company that a prospective investor or purchaser may
require in evaluating a possible investment in the Company or acquisition of shares in the Company. To the
maximum extent permitted by law, each Limited Party expressly disclaims any and all liability, including, without
limitation, any liability arising out of fault or negligence, for any loss arising from the use of or reliance on
information contained in the Presentation including representations or warranties or in relation to the accuracy or
completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied,
contained in, arising out or derived from, or for omissions from the Presentation including, without limitation, any
financial information, any estimates or projections and any other financial information derived therefrom.
Forward-looking statements
The Presentation includes forward-looking statements and comments about future events, including the
Company’s expectations about the performance of its businesses. Forward-looking words such as “expect”,
“should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other similar
expressions are intended to identify forward-looking statements. Such statements involve known and unknown
risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the
Company and which may cause actual results, performance or achievements to differ materially from those
expressed or implied by such statements. Forward-looking statements are provided as a general guide only, and
should not be relied on as an indication or guarantee of future performance. Given these uncertainties, recipients
are cautioned to not place undue reliance on any forward-looking statement. Subject to any continuing
obligations under applicable law, the Company disclaims any obligation or undertaking to disseminate any
updates or revisions to any forward-looking statements in the Presentation to reflect any change in expectations
in relation to any forward-looking statements or any change in events, conditions or circumstances on which any
such statement is based. No Limited Party or any other person makes any representation, or gives any
assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking
statements in the Presentation will occur.
Past performance
Past performance is not indicative of future performance and no guarantee of future returns is implied or given.
Previously reported information
The information in this presentation that relates to previously reported Exploration Results, Exploration Targets,
Mineral Resources and Ore Reserves is extracted from the Company’s ASX announcements noted in the text of
the presentation and are available to view on the Company’s website. The Company confirms that, other than
mining depletion, it is not aware of any new information or data that materially affects the information included in
the original announcements and, in the case of estimates of Mineral Resources and Ore Reserves, that all
material assumptions and technical parameters underpinning the estimates in the relevant announcement
continue to apply and have not materially changes. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially altered.
2
Corporate
Summary
3
About Manuka
✓ ASX listed mine operator,
Phased Strategy to
deliver Self-Sustaining
Value Creation
developer and explorer
3
2
✓ Near-term production from Gold
and Silver assets located in the
prolific Cobar Basin, NSW
1
Wonawinta Silver Mine
▪ Large company-making iron
ore sands project
▪ Brownfields open pit silver
mine and purpose-built CIL
process plant currently on
Care & Maintenance
▪ 3.2Bt1 Vanadium, Titanium,
Magnetite (VTM) Resource
▪ On-site plant with feed
sourced from historic dry
tailings, rock dumps and
future Pipeline Ridge
open pit
▪ Previously Australia’s only
primary Silver Mine
▪ Recently invited to apply to
be included in the NZ
governments fast-tracked
approvals legislation
▪ A$15.5M Capital Cost
required for restart
▪ Cashflow from Mt Boppy to
support a potential restart of
Silver mining / production
✓ Large Vanadium-rich Iron Sands
Resource located offshore of the
Taranaki Bight, New Zealand
The Company’s current focus is
bringing the Mt Boppy Gold Mine
back into production in CQ1-2025
1. Financial Forecasts and the Production Target should be read in conjunction with the
cautionary statement on Page 12 and the Material Assumptions Presentation in Appendix 1.
Taranaki VTM Project
Mt Boppy Gold Mine
▪ Brownfields gold mine
▪ Initial 3.5-Year Mine Life
generating an average
EBITDA of A$44M p.a.1
▪ AISC = US$1,116/oz Au
▪ 150km South of Mt Boppy
▪ Plant recently utilised to
leach Mt Boppy gold ore
▪ Updated Ore Reserve
targeted for October 2024
▪ Mining Lease granted
permitting 5Mtpa mining rate
▪ Cash flows from precious
metals assets to support
completion of feasibility
studies and project capex
▪ Targeting Bankable
Feasibility Study
commencement in 2025
1ASX Release 1 March 2023
4
MKR hold Precious Metals Assets of Strategic
Value in a Tier -1 Mining Jurisdiction
Endeavour Mine
▪
CSA Mine
Tritton Mines
Mt Boppy
Cobar
Peak & New Cobar Mines
Pipeline Ridge
McKinnons
Federation Mine
Wonawinta
The proposed Mt Boppy and existing Wonawinta
production facilities provide:
▪
a means to monetise otherwise stranded deposits
located within current +1,000km2 tenure; and
▪
strategic opportunity for commercial toll treating
arrangements with third parties.
▪
The lengthy approvals timelines to receive environmental
consents and Mining Leases makes existing productive
tenure valuable.
▪
Proposed Leaching (Stage 1) and Flotation (Stage 2)
processing capability at Mt Boppy provides flexibility to
treat Oxide ore and Fresh ore sources.
▪
Wonawinta Silver Plant can be augmented with flotation
capability to extract value from deeper base metals
sulphides typical of Mississippi Style Lead deposits both
on site and from other nearby sulphide ore sources.
Manuka Projects / Tenure
Mineral Hill Mine
Mallee Bull, May
Day, Wagga Tank
Cobar Basin
NSW
Other Resources / Project
Mining and Exploration Licenses
5
Taranaki VTM Project
(100% Manuka)
▪
The Taranaki VTM Project is located 22 km to 36 km offshore in New
Zealand’s EEZ, or Exclusive Economic Zone, outside the 12 nautical limit
from the shoreline, in waters 20m to 50m deep (area 243km2).
Large Vanadium-rich Iron Sands Resource
located in the Taranaki Bight, New Zealand
▪
On granting of final government approvals to operate the Company will
complete its Bankable Feasibility Study on the Project.
It has a granted mining license, MP55581,
permitting production of 5Mtpa
▪
The Project is anticipated to sit in the lowest quartile of the iron ore
production cost curve.
Manuka invited to submit an application for the
Project to be included in the New Zealand
Government’s Fast Track Approvals Bill
The objective of the Bill is to provide a streamlined
decision-making process to facilitate the delivery of
infrastructure and development projects with
significant regional or national benefits
Resource1
Ore
Fe2O3
TiO2
V2O5
Classification
(Bt)
(%)
(%)
(%)
Indicated &
Inferred
3.2
10.17
1.03
0.05
1ASX Release 1 March 2023
6
Corporate Summary
Shares Outstanding
780M
Options Outstanding
214M
Share Price
A$0.037
Market Capitalisation
A$28.9M
Cash
A$1.9M
As at 30 June 2024
Debt Outstanding
~A$29.9M
As at 30 June 2024
•
•
Volume (M shares)
Capital Structure
14
0.12
12
0.10
10
0.08
8
0.06
6
0.04
4
2
0.02
0
0.00
Share Price (A$/sh)
Share Price History
A$18.1M TransAsia Pty Ltd - Senior Debt Facility
US$6.5M Tennant Metals SA Pty Ltd - Trade Finance Facility
Volume
Ownership Breakdown:
7
Share Price
Share Price Catalysts:
✓ Continued strength in the Gold and Silver markets
16%
✓ Near Term Gold Production at Mt Boppy
✓ Ore Reserve Update for the Wonawinta Silver Mine
✓ Refinance of the TransAsia Debt Facility
84%
Board & Management
✓ Further progress through the VTM Project approval process
Other
7
Board of Directors
Dennis Karp
Alan Eggers
Anthony McPaul
John Seton
Executive Chairman
Executive Director
Non-Executive Director
Non-Executive Director
Dennis was Head of Trading at HSBC
Australia prior to joining Tennant
Limited in 1997, one of Australia’s
largest physical commodities trading
companies with operations in Asia
and Europe.
Alan is a geologist with over 40 years
of local and international experience.
Anthony (Tony) is a senior mining
executive with over 40 years’
experience in mining operations and
mineral processing (both underground
and open pit operations).
John is an Auckland based lawyer with
extensive experience in commercial
law and the mineral resources sector.
He was a director of Summit
Resources Limited until its sale in
2007, as well as being a director of a
number of other ASX and NZX listed
private companies.
He was a principal shareholder of
Tennant Metals until 2010, and a
director until December 2014.
Dennis led the syndicate which
purchased the Manuka assets in
2016.
He holds a Bachelor of Commerce
from the University of Cape Town.
Founding director of Summit
Resources Ltd which they built
from listing on the NZX in 1987 into
an ASX top 200 company and an
ultimate takeover by Paladin
Energy for A$1.2B in 2007.
Alan holds Bachelor of Science,
Honours and Master of Science
degrees from Victoria University of
Wellington. He is a Fellow of the
Society of Economic Geologists, and a
member of AusIMM, & Australian
Institute of Geoscientists.
Tony was most recently the general
manager for Newcrest’s (now
Newmont’s) Cadia Valley
Operations, in Orange NSW. Tony
formally retired in 2016.
Tony has sat on a range of Boards
and industry bodies including the
Minerals Council Executive Committee
and Mineral Industry Advisory Council.
He is qualified in automotive
engineering from Goulburn TAFE.
John was a former Chairman of the
Vietnam/New Zealand Business
Council.
John holds a Bachelor of Laws from
Victoria University, Wellington, and a
Masters of Law (Honours) from the
University of Auckland and was a
Chartered Fellow of the New Zealand
Institute of Directors until 2023.
8
Mt Boppy
Gold Mine
9
Mt Boppy Gold Mine – Overview
Historically one of NSW’s richest gold mines, having produced ~500,000 oz Gold at ~15 g/t Au
▪
Set within the Canbelego – Mineral Hill Rift Zone of the prolific Cobar Super Basin,
43 km east of the Cobar and 640 km west of Sydney.
▪
2019: Acquired by Manuka Resources.
▪
Between April 2020 and February 2022: Manuka mined 560 kt from the Open Pit
at 3.02 g/t Au to recover 41 koz Au via the modified Wonawinta Plant.
▪
From June 2023 to November 2023: Manuka reclaimed and screened Mt Boppy
ROM Stockpiles and Rock Dump Oxide ore which was leached at Wonawinta.
▪
December 2023: Production suspended due to grade variability when reclaiming
the main Rock Dump, combined with inefficiencies associated with trucking and
processing ore at the Wonawinta Plant.
▪
November 2023 to March 2024: Manuka completed a Sonic Drilling program and
subsequent Mineral Resource Estimate update to improve confidence in the grade
and ore type distribution of the main Rock Dump and TSF3.
▪
April 2024: Manuka outlined an update updated development plan involving a
modular, on-site processing facility installed at Mt Boppy
▪
Major environmental approvals in place for the restart of doré production at Mt
Boppy by CQ1-2025
▪
Camp is located on site to support construction and operations.
View of the Mt Boppy Open Pit and Rock Dumps
Existing Camp located at Mt Boppy
10
Mt Boppy Gold Mine – Project Highlights
Low Capex, High-Margin, Near-term Production of Precious Metals at a Proven Brownfields Site
▪
Additional testwork and engineering delivers an optimised and simplified 100t/h gold processing plant
Low Upfront Capital Cost of A$11.6M (including contingency) to return to production
Low Upfront Capital Cost of A$15.5M required for first gold doré production in CYQ1-2025
Initial 5-Year Mine Plan based on a new fit-for-purpose on-site processing facility a Mt Boppy
▪
Initial
production
via ~135,000
Oxide Oreounces
Leaching
Plant on
site at
Mt Boppy
(Stage
1 Plant)
~50,000
oz gold
of gold
in doré and
of Silver
in doré
produced
over
the Mine
Plan as currently defined
▪
Forecast
AISC of US$1,070/oz
Au (or US$991/oz
including
Silver
Credits)to treat Fresh/Tails Ore types (Stage 2/3 Plant)
Flotation/Wet
screening capability
added to plant
within
12 months
▪
High operating margin of 56%, delivering an average Annual EBITA of ~A$20M
Initial 3.5-Year Mine Plan comprising low strip, free-dig ore sources including existing stockpiles / tailings
Pre-tax NPV10 = A$57M, IRR = 163%
~67,000oz of payable gold produced in doré and silver credits1
Clear opportunities to extend mine life via self- funded exploration
▪
▪
▪
Forecast AISC of US$1,116/oz Au1 enabling high operating margin (average annualised EBITDA of A$44M pa)1
Clear opportunities to extend the mine life via self-funded investigations and exploration including the
brownfields Mt Boppy Open Pit and Boppy South
Cash flows from Mt Boppy to support Exploration, restart of the Wonawinta Silver Mine and progress the
Taranaki VTM Project approvals and technical feasibility
1. Financial Forecasts and the Production Target should be read in conjunction with the cautionary statement on Page 12 and the Material Assumptions Presentation in Appendix 1.
11
Mt Boppy Gold Mine – Production Target
300
3.00
Source
Type
Unit
Total
0
1
2
3
4
250
2.50
Rock Dump Waste
Waste
kt
1,846
70
720
720
336
-
200
2.00
Pipeline Ridge Waste
Waste
kt
1,752
-
-
-
1,230
522
kt
3,598
70
720
720
1,566
522
150
1.50
100
1.00
50
0.50
01-Jul-24
01-Jul-25
01-Jul-26
01-Jul-27
Mined Grade (g/t)
Tonnes Mined ('000t)
Scheduling of Oxide and Fresh Ore to Support Dual Plant Capability Strategy
01-Jul-28
Total Waste Tonnes
+22mm Stockpiles
Oxide
kt
84
-
84
-
-
-
Tailings ROM
Oxide
kt
12
-
12
-
-
-
HG Oxide Rock Dump
Oxide
kt
129
-
129
-
-
-
PAF Stockpile
Fresh
kt
157
-
157
-
-
-
Fresh Rock Dump
Fresh
kt
297
-
-
126
172
-
LG Oxide Rock Dump
Oxide
kt
397
-
-
-
397
-
+22 Stockpiles
Tailings ROM
HG Oxide Rock Dump
PAF Stockpile
Fresh Rock Dump
LG Oxide Rock Dump
Tailings Rock Dump
Tailings
kt
118
-
-
-
118
-
Tailings Rock Dump
Tailings TSF3
Pipeline Ridge Oxide
kt
Pipeline Ridge Waste
Average Mined Grade - Gold
Tailings TSF3
Tailings
Rock Dump Waste
758
-
230
528
-
-
Pipeline Ridge Oxide
Oxide
kt
350
-
-
-
140
210
Total Ore Tonnes
kt
2,303
-
613
653
827
210
Mined Gold Grade
g/t
1.17
-
1.26
1.22
0.95
1.61
The Production Target underpinning Financial Forecasts presented within this Presentation comprises 62% Indicated
Resources, 22% Inferred Resources and 15% Exploration Target. There is a low level of geological confidence
associated with Inferred Resources and there is no certainty that further exploration work will result in the conversion
of Inferred Resources to Indicated Resources or return the same grade and tonnage distribution. The potential quantity
and grade of an Exploration Target is conceptual in nature, there has been insufficient exploration to determine a
mineral resource and there is no certainty that further exploration work will result in the determination of Mineral
Resources or that the production target itself will be realised. The Exploration Target relates to the Pipeline Ridge Ore
only. The Company has determined that sufficient data exists to include a portion of the Pipeline Ridge Exploration
Target in the Production Target and furthermore that is it not a determining factor in the economic viability of the
Project. The estimated Mineral Resource and Exploration Target underpinning the Production Target have been
prepared by a Competent Person in accordance with the requirements in the JORC Code.
*Rock Dumps to undergo selective screening
Mill Feed
kt
1,987
-
584
596
596
210
Milled Gold Grade
g/t
1.30
-
1.26
1.30
1.22
1.61
Mining requires no drill & blast with ore reclaimed by contractors using 30t
excavator and hauling via 30-40t moxies.
12
Mt Boppy Gold Mine – Cash Flow Forecast1
Low Capex Return to Gold Production, delivering an average annualised EBITDA of A$44M
Production Year
Unit
Total
0
1
2
3
4
Capital Cost Estimates
A$M
Gold in Doré
koz
67
-
19
20
19
9
General Site Costs
1.4
Gold Price
Exchange Rate
US$/oz
A$:US$
2,650
0.70
2,650
0.70
2,650
0.70
2,650
0.70
2,650
0.70
Site Infrastructure & Mining Equipment
4.6
100tph Crushing/Screening, Milling, CIL Circuit
7.9
Total Revenue
Royalties
Mining
Processing
G&A
EBITDA
Pre-Production Opex
Pre-Production Capex
Sustaining Capex
Net Project Cashflow
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
253.0
(5.1)
(32.8)
(51.3)
(13.8)
150.0
(2.2)
(13.3)
(3.6)
130.9
(2.2)
(13.3)
(15.5)
73.1
(1.5)
(7.4)
(15.4)
(4.0)
44.8
(3.6)
41.2
75.5
(1.5)
(6.5)
(16.7)
(4.0)
46.8
46.8
71.5
(1.4)
(14.2)
(14.3)
(4.0)
37.5
37.5
32.9
(0.7)
(4.8)
(4.8)
(1.7)
20.9
20.9
Pre-Production Operating Costs
2.3
Stage 2: Flotation, Conc Regrind, Intensive Leach
2.8
Stage 3: Wet Screening
0.2
Total Capex (including contingency)
19.2
Pre-Production Capex
15.5
Sustaining Capex
3.6
US$/oz
A$/t mined
A$/t ore
A$/t ore
1,116
16.5
25.8
6.9
-
1,157
12.6
26.4
6.9
1,007
10.9
28.0
6.8
1,259
23.8
24.1
6.8
968
23.0
22.9
8.0
AISC
Mining
Processing
G&A
Capital Cost minimised and execution timeline derisked
through the relocation of existing assets including the 100tph
Ball Mill and 30tph Regrind Mill located at Wonawinta.
1. Financial Forecasts and the Production Target should be read in conjunction with the cautionary statement on Page 12 and the Material Assumptions Presentation in Appendix 1.
13
Mt Boppy Gold Mine – Processing Infrastructure
Low Capex Strategy supported by leverage existing asset and opportunistic equipment acquisitions
Photo showing the Wonawinta 100tph Ball Mill (left). Photo showing Intensive Leach Reactor (right) purchased by Manuka at auction.
14
Mt Boppy Gold Mine – Processing Infrastructure
Low Capex Strategy supported by leverage existing asset and opportunistic equipment acquisitions
Photo of the McCoskey R230 ‘reclaimer’ mobile screening plant at Mt Boppy.
15
Mt Boppy Gold Mine - Site Layout and Infrastructure
Brownfields Site with a Wealth of Existing Infrastructure
▪ The new Mt Boppy processing plant will be located on the pad at
the site of the previously decommissioned Mt Boppy CIL plant.
New
Plant
▪ Site power requirements will be provided by portable diesel
generation sets.
▪ Site water requirements will be accommodated via a production
borehole and water contained in the Mt Boppy Open Pit.
▪ Access to site is via existing sealed roads.
▪ Personnel will be accommodated in the 48-bed mining camp
already established at the Mt Boppy mine site.
▪ A new 500,000 m3 (2 to 3-year capacity) tailings storage facility
will be constructed west of the main Rock Dump.
▪ Limited earthworks required to clean up ROM Pad and
establishing plant site.
▪ All ancillary infrastructure in already in place including
administration & exploration offices, communications,
warehousing, core yards and mobile equipment workshop.
Mt Boppy Site Layout
16
Highly Experienced Project Execution and Operations Team
Haydn Lynch
Phil Bentley
Dieter Engelhardt
Byron Steyn
Chief Operating Officer
Chief Geologist / Project Manager
Chief Metallurgist
Chief Financial Officer
Over 25 years of experience in M&A,
financial markets and private equity, with
a substantive track record in the
origination and execution of domestic
and cross-border transactions in metals
and mining in Australia, Africa, Japan,
China, and Mongolia.
Phil has 40 years of experience in the mining industry in
New Zealand, South Africa and Australia, in both senior
geological positions as well as in senior management and
director capacities.
Dieter has over 30 years of experience in the
mining industry including roles at Telfer Gold
Mine (Senior Metallurgist), Northparkes
Mines (Senior Metallurgist), McKinnons Gold
Mine (Resident Manager), and the CSA Mine
(Manager Ore Processing).
Byron has over 25 years of experience
in finance, with more than 10 years in
various Group CFO roles.
Hadyn’s Senior management
experience includes Bankers Trust
Australia, Investec Bank, RBC Capital
Markets and Southern Cross Equities.
Haydn has degrees in Mechanical
Engineering and Economics from the
University of Queensland and a Masters
in Commerce from the University of New
South Wales.
Executive roles include Randgold Resources and
Randgold & Exploration (Chief Geologist), Trafigura
Mining Services (Global Head of Exploration), CSA
Global South Africa (Principal Geologist Africa) and
Asanko Gold.
Phil is a Qualified person under NI 43-101 (Canadia) and
JORC (Australia) and is a Fellow of the South African
Geological Society.
Dieter was employed by Newcrest Mining
Ltd (now Newmont) in various roles
including Manager Ore Processing and
Principal Metallurgist.
Dieter completed a Bachelor of Applied
Science in Primary and Secondary Metallurgy
at the University of South Australia in 1984.
He previously worked in Group
Audit at Commonwealth Bank of
Australia and in various financial
accounting and external auditing
roles.
Byron holds a Bachelor of Commerce
from the University of the
Witwatersrand and further studies
through the University of South Africa
and Deakin University.
Phil has completed a Bachelor of Science (Hon.) in
Geology at Victoria University of Wellington and a Masters
of Science in Economic Geology at Victoria University of
Wellington and a Masters of Science in Mineral
Exploration from Rhodes University, Grahamstown (SA).
17
Growth
Opportunities
18
Cobar Basin Exploration Pipeline
Mt Boppy Gold production to underpin organic growth via progression of the project pipeline
Mine Development
Current Mine
Plan 67koz Au
Recovered
Current Regional Exploration Target1
Mt Boppy
(Au)
Wonawinta (Ag)
Mt Boppy (Au); Boppy S (Au)
Pipeline Ridge (Au-Cu-Pb-Zn);
De Nardi (Ag Cu-Pb-Zn);
Wonawinta (Ag); Boundary (Ag);
McKinnons (Au); Goldwing (Au);
Gundaroo (Cu Pb Zn); Hardwicks (Au);
Birthday (Au); Wonawinta N (Ag); Smith’s
Tank (Pb-Zn-Ag); McKinnon dumps (Au);
Pipeline surrounds (Cu); Mckinnons N (Au); Guzzi (Au);
Canbelego Central Structural Zone (Cu); Boppy S Ext (Au);
Racecourse (Au); Newhaven (Au); Junction (Cu-Pb-Zn)
•
3-4Mt at 2.5-3.8 g/t Au for 249-527koz
•
17-22Mt at 40-50 g/t Ag for 22-36Moz
•
significant polymetallic (Ag-Au-Cu-Zn-Pb)
prospectivity
Priority Targets
Follow-up Targets with
geological, geochemical,
geophysical anomalies
and historical drilling
Follow-up Targets
with geological,
geochemical and
geophysical
anomalies
Winduck Shelf (Cu-Pb-Zn); Won Terrain Boundary E (Pb-Zn-Ag); Won Far N (Cu);
Jackermaroo Fault (Cu-Au); Coonara – Kuralee Terrain Boundary Canbelego E (Cu-Au)
•
Pipeline Ridge
•
Mt Boppy southern extension
•
McKinnons intrusive gold exploration
•
Wonawinta extensions North, South, and
down dip
•
Gunderoo – de Nardi Cu-Pb-Zn
Regional
Targets
1ASX Release 14 February 2023
19
Unlocking Near-term Potential at Mt Boppy
Targeting Resource and Mine Expansion from the Existing Open Pit and Mining Leases
Mt Boppy Open Pit – 233kt at 4g/t Au currently excluded from the current Mine Plan
Boppy South
TSF3
Existing Pit
Open
120 mRL – Depth of current pit shell design
Resource
•
Between April 2020 and February 2022, Manuka mined 560kt
from the Open Pit at 3.02 g/t Au, recovering 41 koz Au
•
Drilling by Manuka in 2020 and 2021 intersected high grade
mineralisation beneath the existing pit, including: 22 m @
11.78 g/t Au from 159 m (MBRC019) and 17 m @ 4.33 g/t Au
from 180 m (MBRC020)1
•
Project cash flow to fund aggressive near pit exploration
down dip and along strike to potentially extend mine life
1ASX Release 1 March 2021
Open
Proposed drilling
20
Wonawinta Silver Mine (100% Manuka)
Previously Australia’s Largest Primary Silver Mine
▪
Wonawinta silver production of ~3Moz from 2012 to
2013, and ~ 500koz in 2022.
▪
Total Resources1 of 38.3Mt at 41g/t Ag for 51Moz Ag,
including higher-grade component of 14Moz Ag at 97g/t Ag.
▪
Nameplate capacity ~ 0.85Mtpa utilised by Manuka to
process Mt Boppy gold ore as recently as November 2023.
▪
Fully permitted with plant and all infrastructure operational.
▪
The Project remains on C&M and poised for restart.
▪
Ore Reserve update targeted in October 2024.
▪
Manuka is reviewing the potential restart of operations to be
funded from cash flow generated by Mt Boppy operations.
Resource
Ore
Classification
(Mt)
(g/t)
(Moz)
(%)
(kt)
Measured
1.1
47.3
1.65
0.69
7.5
Indicated
12.3
45.5
18.04
0.83
102.8
Inferred
24.9
39
31.25
0.39
96.9
Total
38.3
41.3
50.94
0.54
207.2
1ASX Release 1 April 2021
Silver
Lead
21
Wonawinta Resource Extensions
High Potential for Economic Base Metals Mineralisation Down Dip of the Current Wonawinta Open Pit
▪ ‘Proof-of-Concept’ drill program has
successfully tested for presence of carbonatehosted sulphides down-dip from existing
Wonawinta open pits, encountering lead-zincsilver mineralisation over 3km strike.
▪ Selected mineralised intervals include1:
• DBM003: 20 m @ 1.98% Pb+Zn, 43 g/t Ag from 94
m downhole including 4 m @ 6.34% Pb+Zn, 63g/t
Ag from 101 m downhole.
• DBM004:11.4 m @ 1.23% Pb+Zn, 83.5g/t Ag from
130m downhole.
• DBL003: 5.0 m @ 2.52% Pb+Zn, 128g/t Ag from
63m downhole.
1ASX Release 1 June 2021
Typical cross section through mineralisation at Wonawinta showing Booth Limestone and MVT
style mineralisation beneath and down dip of Wonawinta silver open oxide pits
22
Thank you
✓ Near-term production from Gold and
Silver assets located in the prolific
Cobar Basin, NSW
✓ Initial 3.5-Year mine plan delivering
an average annualised EBITDA of
A$44M
✓ Large Vanadium-rich Iron Sands
Resource located offshore of the
Taranaki Bight, New Zealand
✓ Phased St