11 May 2026
ASX: MKR
Amended Announcement –
MT Boppy Gold Project Exploration Update
Manuka Resources Limited (ASX: MKR, NZX: MKR) (the Company) refers to the announcement released
on 28 April 2026 titled “Mt Boppy Gold Project Exploration Update” (Original Announcement).
The Company confirms this Amended Announcement replaces the Original Announcement. The Amended
Announcement has been prepared to ensure compliance with ASX Listing Rules 5.7 and 5.22.
The Amended Announcement includes:
• all material information required to be disclosed under Listing Rule 5.7 in respect of the reported
exploration results of the RC collard diamond holes;
• the information and context required under Listing Rule 5.22; being the relevant Competent Person
consents.
The Company provides the following additional clarifications:
Drilling Methodology
Drilling is a combination of Reverse Circulation (RC) pre-pilot following by diamond drilling extensions/deepening
in selected holes.
Table A1.1 has been updated to clarify the drilling methods used.
Reference to pXRF Analysis, Drill Intercepts and Figure Annotations
The ASX requested clarification regarding references to 46 g/t Ag reported as pXRF analysis on Page 1, bullet
point 3, and whether this constitutes a drill intercept requiring reporting in accordance with Clause 19 of the JORC
Code (2012). The ASX also requested clarification of related figures and legend information.
The Company clarifies the reported 46g/t AG is derived from PhotonAssay analysis over the downhole interval
311.20-312.00m and not from portable XRF (pXRF) analysis.
The reference in the original disclosure has been updated accordingly.
Reported Intercepts and Figure References (Figures A1.3, A1.4 and A1.5)
The ASX queried Figures A1.3 (MSD001), A1.4 (MSD004) and A1.5 (MSDD005), which display elevated assay
values.
The Competent Person advises these intersections are not considered significant mineralised intercepts for the
purposes of reporting under the JORC Code (2012) and are therefore not reported as mineralised drill intercepts
in the context of economic or exploration significance.
Accordingly, intersections exceeding 0.1 g/t Au (PhotonAssay) have been tabulated and are included in Table 1
of the Amended Announcement for completeness.
The figures have been updated to ensure consistency of presentation and reporting context.
Figure Legends and Data Presentation
The Company clarifies the figure legends and colour formatting have been updated to improve clarity and
interpretation of the numerical values presented.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 tel +612 7253 2020 www.manukaresources.com.au
Requirement of Cautionary Statement in relation to pXRF Disclosure
The ASX requested whether a JORC Code (2012) Clause 17 cautionary statement is required in relation to
references in the announcement to pXRF-derived assay results.
The Company clarifies the reference in the Original Announcement to pXRF analysis was incorrect.
The grade in question was derived from PhotonAssay analysis of a sampled downhole interval 311.20-312.00m.
Accordingly, the basis for a pXRF-specific cautionary statement does not apply.
The Company notes that appropriate JORC Code (2012) Clause 17 cautionary statements have been included
in relation to Exploration Targets and Exploration Results where applicable.
Cross Referencing
The ASX requested clarification regarding cross-referencing of exploration results and supporting disclosure
within Figure 3, A1.1, A2.1 and Table 1.
The Company clarifies that Figure 3 has been updated to present historical exploration results solely in the context
of locality of shafts and historical drill collars.
Historic exploration intercepts will only be reported in accordance with Listing Rule 5.23.1 and the JORC Code
(2012) when the Company undertakes further drilling programs and reports new exploration results.
Figures A1.1 and A2.1 have been updated to include appropriate cross-references to Table 1 in accordance with
Listing Rule 5.23.1.
Table 1 has been updated to reflect current exploration data from Mt Boppy and Pipeline Ridge. Sections relating
to criteria under JORC Table 1 have been revised to reflect the new exploration results disclosed in the Amended
Announcement.
Where historical exploration data has been included, it is clearly identified as historical and is presented separately
from new exploration results.
Retractions and Corrections
The ASX requested clarification regarding the status of certain disclosures included in the Original Announcement.
• Drillhole PMS129
The reference to drillhole PMS129 has been removed. The Company clarifies this hole is not material to any
current Mineral Resource estimation or mining study and has therefore been excluded from the updated
disclosure.
• Exploration Target Reference (~30–40koz)
The previous reference to “initial exploration targets of ~30–40koz of shallow mineralisation” has been
removed to ensure alignment with the current Exploration Target framework and disclosure requirements
under Listing Rule 5.7 and JORC Code (2012) Clause 17.
The updated disclosure now focuses on the current Exploration Target relating to drilling to approximately
60m depth, consistent with the current exploration program.
• Table 1
Table 1 was not intentionally retracted. The omission has been corrected in the Amended Announcement to
ensure completeness and alignment with updated exploration data and reporting structure.
• Table 1 – JORC Reporting Structure
Table 1 has been updated to include additional drill hole assay data derived from recent exploration activities.
The results include low-grade and sporadic intercepts, which are presented for completeness and contextual
geological interpretation rather than as material mineralised intercepts.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 tel +612 7253 2020 www.manukaresources.com.au
The updated Table 1 has been structured to reflect current exploration activities and results, with previous
planning or conceptual information removed or repositioned where appropriate to ensure alignment with Listing
Rule 5.7 reporting requirements and JORC Code (2012) Table 1 disclosure principles.
Exploration Target Disclosure and JORC Clause 17
The Exploration Target disclosed on Page 4 has been updated to include:
• appropriate Listing Rule 5.23.1 cross-referencing;
• JORC Code (2012) Clause 17 cautionary statement; and
• supporting explanation of estimation methodology.
Supporting information and tabulated data have been included in Annexure 2.
Reference to 10-Year Production Plan and Listing Rule 5.19.2
The reference to a “10-year production plan” is derived from the Project Production Target previously disclosed
in Table 1 of the announcements dated 30 May 2025 titled “Cobar Basin Production Plan” and 23 March 2026
titled “Amended Announcement – Updated Cobar Basin PFS”.
The Project Production target has been prepared in accordance with Listing Rules 5.16-5.19 and the JORC Code
(2012).
The material assumptions underpinning the Production Target, as required under Listing Rule 5.19.2 include
mining and processing rates, metallurgical recovery assumptions, cut-off grades, commodity price assumptions,
operating and capital cost estimates and production scheduling. The assumptions and information were set out
in the 30 May 2025 announcement.
The 10-year production plan represents an illustrative production schedule derived from the previously disclosed
Production Target and does not introduce any additional or new assumptions.
Listing Rule 5.19.1 Cross Reference
The Company confirms the cross-references to the 30 May 2025, and 23 March 2026 Announcements remain
current and continue to provide the basis for the material assumptions supporting the Project Production Target,
consistent with the requirements of Listing Rule 5.19.1.
Listing Rules 5.19.3 and 5.19.4 (Inferred Mineral Resources)
The Company confirms the Inferred Mineral Resources have been included in the estimation of the Project
Production Target. The proportion of Inferred Mineral Resources used is 38% and appropriate cautionary
statements in accordance with the JORC Code (2012) and Listing Rule 5.19.4 have been previously disclosed in
the 30 May 2025 and 23 March 2026 announcements.
Competent Person Statement (Listing Rule 5.22)
The Competent Person Statement has been updated to include Exploration Results from Mr Boppy and Pipeline
Ridge, in accordance with Listing Rule 5.22.
Closing Confirmation
The underlying exploration results and technical conclusions have not materially changed from those disclosed
in the Original Announcement. The additional information has been included to provide the context and detail
required under the ASX Listing Rules and JORC Code.
The Amended Announcement should be read in full, including the Competent Person statement and
accompanying disclosures.
Authorised for release to the ASX by Manuka Resources Limited Executive Chairman.
Dennis Karp
Executive Chairman
Tel. +61 2 7253 2020
ASX Announcement
11 May 2026
ASX: MKR
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Amended Announcement –
MT BOPPY GOLD PROJECT EXPLORATION UPDATE
Highlights
• Three RC collared diamond holes targeting depth and strike extension zones of
Mt Boppy-style mineralisation completed
• Results returned localised low-grade gold intersections, consistent with early-
stage testing,
• Sulphide mineralisation intersected, including in MSD001 at 311.20-312.00m
visible pyrite-sphalerite-galena which yielded a photon silver assay of 46g/t Ag¹
• The gold assays received and any ensuing intersections are currently deemed
non-material to a mining project in terms of Listing Rule 5.7 due to none being of
economic value.
• Structural interpretation has refined targeting for follow-up drilling
• Pipeline Ridge gold resource definition drilling now commenced
• Exploration supports future gold growth alongside near-term production restart
Manuka Resources Limited (“Manuka” or the “Company”) confirms that the initial phase of
exploration diamond drilling at its Mt Boppy gold project (as outlined on 6 November 2025), has
been completed. Final pXRF multi element analyses and structural modelling are in progress.
Mt Boppy has historically produced ~500,000oz Au at an average grade of ~15g/t Au from a
combination of early underground mining (circa 1900-1950’s) and more recent open pit
operations (1995-2021). The current programme comprised three diamond drill holes targeting
potential depth and strike extensions of known mineralisation.
While results returned localised low-grade gold intersections, the programme has delivered
important geological and structural insights, improving the Company’s understanding of
structural controls and refining targeting for future work.
Executive Chairman Dennis Karp said:
“We acquired Mt Boppy in 2019 and until now, have not had the opportunity to test the
depth and strike extensions of the existing gold system. These are the first deeper drill
holes completed since acquisition and represent an important step in advancing our
understanding of the broader deposit.
While these were early-stage scout holes, they have provided valuable structural insights
and helped refine our targeting. The results are already directing our focus toward priority
zones to the south-east of the current pit for follow-up drilling.
Importantly, this work is being undertaken alongside our near-term production restart,
with the focus firmly on delivering first production later this quarter, followed by growing
gold and, subsequently, silver contributions over time. Our confidence remains that Mt
Boppy sits within a larger mineralised system consistent with the Cobar Basin.”
Page | 2
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Mt Boppy Drilling Programme
Exploration Results to date (Figures 1-8)
Figure 1: General locality of drilling targets
Page | 3
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 2: Locality of three RC precollar / diamond holes
The initial three-hole diamond drill holes (MSDD001, 004, 005) were designed to target potential
southern strike and depth extensions of the Mt Boppy gold mineralisation at depths of approximately
300–500 metres.
The drill holes were located between 300m and 1,000m to the south of the current Mt Boppy open
pit (Figure 2), targeting mineralised zones up to 200-300m in strike length and up to 30m wide.
Key outcomes from the programme include:
- Limited development of Boppy style brecciated zones within the tested areas;
- The extension of strongly mineralised quartz breccia mineralisation at the southern end of
the current open pit has been truncated by a NW-SE structure that may have continuity to
the Boppy South gold deposit;
- The western bounding fault is now interpreted to have been reactivated and truncates/
displaces the main Mt Boppy gold orebody on the west side;
Page | 4
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
While no significant high-grade gold zones were intersected in this phase, the programme has
materially improved geological understanding and targeting confidence for subsequent drilling.
Pipeline Ridge Gold Project² ³ – Resource Definition Drilling
Resource definition drilling at the Pipeline Ridge gold project commenced on 24 April 2026,
targeting shallow oxide gold mineralisation suitable for open pit extraction.
The Pipeline Ridge project is located approximately 28km south of the Mt Boppy gold mine
within the Company’s broader Cobar Basin footprint.
• ~3,075m RC drilling programme (to ~60m depth) underway
• Exploration target down to 58m: 187kt–365kt @ 1.1–1.5g/t Au.
Estimated from preliminary interpretation and modelling of existing drilling (see Annexure 2 and
Annexure 3: Table 1, Section 2, borehole information) and between cutoff grades of 0.6 and 0.8 g/t Au.
The Exploration Target, including the potential quantity and grade is conceptual in nature. There has
been insufficient exploration completed to estimate a Mineral Resource in accordance with the JORC
Code (2012) and the Exploration Target is not yet fully constrained by drilling information. It is uncertain
if further exploration will result in the estimation of a Mineral Resource.
• Objective to deliver a maiden gold resource in 2026
Pipeline Ridge represents a near-term opportunity to supplement gold feed into the Wonawinta
processing plant.
Future work
The exploration programme will continue with the following priority activities:
1 Ongoing Pipeline Ridge RC drilling – targeting shallow open pit gold mineralisation.
2 Mt Boppy Exploration depth and strike extension drilling is being planned to test shallow (0-
150m) deep satellite deposits including historic shafts and workings (Figure 3).
Strategic Context
While Manuka’s immediate focus remains the restart of silver production at its Wonawinta
processing plant in Q2 2026, the current exploration programmes are directed towards building
out a broader Cobar Basin production platform.
The Company’s strategy is underpinned by a 10-year production plan, centred on the
Wonawinta processing facility and incorporating multiple gold and silver feed sources across its
regional asset base. This approach is focused on:
• increasing near-term gold feed into the plant
• extending mine life beyond the current plan
• identifying additional satellite deposits within trucking distance
Over time, this positions Manuka to transition from a single-asset restart to a multi-source
production system, supporting sustained production and cash flow growth.1,2
2
ASX Release 6 Nov 2025
3
ASX Release 16 Dec 2025
Page | 5
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure 3: Mt Boppy-Canbelego satellite shafts and prospects
Page | 6
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Production Timetable and Milestones
Manuka continues to progress through the final execution phase toward first production, with
key milestones outlined below:
Completed
✅ Refinancing secured
✅ All major approvals in place and in good standing
✅ Care & maintenance phase completed
✅ Key on-site management team and workforce secured
✅ Processing equipment upgrades (deslime / dewatering circuit) ordered
✅ Gold ore haulage from Mt Boppy underway
June 2026
quarter
Reserve upgrade and revised mine-plan at Wonawinta (May 2026)
ROM gold material stockpile continues to build at Wonawinta
Commissioning and ramp-up of silver and gold-bearing ROM stockpiles
First gold processing commences (May/June)
Sept 2026
quarter
☐ Plant upgrade and refurbishment to production-ready state
☐ First silver production and sales
☐ Commencement of mining silver ores
☐ Ramp-up to nameplate production
☐ Steady state production and cash flow generation
This announcement has been approved for release by the Board of Directors of Manuka
Resources Limited
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. 02 7253 2020
admin@manukaresources.com.au
Page | 7
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Compliance Statements
The information in this announcement that relates to previously reported Exploration Results, Exploration
Targets, Mineral Resources, Ore Reserves, Production Targets and Financial Forecasts is extracted from
the Company’s ASX announcements and are available to view on the Company’s website. The Company
confirms that in the case of estimates of Mineral Resources and Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant announcement
continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not been materially altered.
Important Information
This report includes forward-looking statements and comments about future events, including the
Company’s expectations about the performance of its businesses. Forward-looking words such as
“expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other
similar expressions are intended to identify forward-looking statements. Such statements involve known
and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company, and which may cause actual results, performance or achievements to differ
materially from those expressed or implied by such statements. Forward-looking statements are provided
as a general guide only and should not be relied on as an indication or guarantee of future performance.
Given these uncertainties, recipients are cautioned to not place undue reliance on any forward-looking
statement. Subject to any continuing obligations under applicable law, the Company disclaims any
obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in
this report to reflect any change in expectations in relation to any forward-looking statements or any
change in events, conditions or circumstances on which any such statement is based. No Limited Party
or any other person makes any representation or gives any assurance or guarantee that the occurrence
of the events expressed or implied in any forward-looking statements in the report will occur.
Competent Persons Statement
The information in this report that relates to Mt Boppy and Pipeline Ridge exploration drilling, results and
exploration targets is based on, and fairly represents, information and supporting documentation prepared
by Mr Philip Bentley, who is a Certified Professional by The South African Council for Natural Sciences
(SACNASP # 400208/05 ) and is the Chief Geologist employed by Manuka Resources Ltd. Mr Bentley
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Bentley consents to the inclusion in the statement of the matters based on his
information in the form and context in which it appears
Page | 8
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
ANNEXURE 1: Mt Boppy diamond drill plans and cross sections (Figures A1.1-A1.5)
Figure A1.1: Locality of Mt Boppy Extension drillholes over historic drilling and interpreted geology
Page | 9
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Table A1:1 Mt Boppy south extensions scout drilling information
Figure A1.2: Mt Boppy Southern extension Phase 1 conceptual drill targets and actual boreholes N-S
section
Page | 10
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure A1.3: MSDD001 cross section looking North, showing Photon Assay results for Ag g/t and
Au>0.1g/t
Anomalous Ag 46g/t at 311,2m-312m. Interval rich in pyrite, galena and sphalerite
Figure A1.4: MSDD004 cross section looking North, showing calcium % readings from pXRF, to
help delineate the Limestone lithology contacts.
Page | 11
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Figure A1.5: MSDD005 cross section looking North, showing Photon Assay results for Au>0.1g/t, including
2m @0.55g/t, from 23m to 25m.
Page | 12
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
ANNEXURE 2: Pipeline Ridge Gold Project ¹ ² (Figure A2.1)
The Pipeline Ridge prospect is a volcanic massive sulphide (“VMS”) style deposit located
approximately 28km south of Mt Boppy. The prospect historically has attracted a number of
phases of exploration drilling (totalling 6,590m DD; 6,079m RC and 4,832m RAB or Air Core).
Evaluation of the various drilling campaigns (some were for base metals and others gold) has
delineated a structurally controlled zone of shallow gold mineralisation.
Two zones of gold mineralisation (295m & 180m strike) locate within a larger ~1,000m strike
length with intersections occurring down to over 150m depth (Figure A2.1) have been
delineated. The Phase 1 drilling at Pipeline Ridge (Table A2.1) is designed to delineate a
shallow (60m deep) free-milling gold oxide resource for potential open pit extraction, with Phase
2 drilling follow up evaluation of the deeper (60-120m) gold mineralisation.
Figure A2.1 above: (Left) Pipeline Ridge phase 1 drill collars (Blue) with gold intersections in relationship
to north and south oxide open pit target zones. (Right) View looking north showing distribution of deeper
gold mineralisation relative to shallow oxide target zones
Page | 13
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Table A2.1: Planned Pipeline Ridge Phase 1 drilling
Preliminary 3D geological modelling of historic drilling data (see Table 1, Section 2, Borehole information)
has enabled preliminary estimations to support an exploration target for the first phase of drilling. Table
A2:2 shows grade:tonnage estimations down to 58m and at a lower gold cutoff grade of 0.6 g/t Au and a
higher cutoff grade of 0.8 g/t Au. This exercise has demarcated a zone containing between 187kt and
365kt grading between 1.1 and 1.5 g/t Au.
Page | 14
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Table A2:2: Exploration target assessment of Pipeline Ridge down to -58m
Page | 15
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
ANNEXURE 3 – JORC 2012 TABLE 1
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria JORC Code Explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed
information.
• Diamond Drilling
• A portion of the data used for
exploration and evaluation of the Mt
Boppy and Pipeline Ridge projects has
been gathered from diamond core.
PQ,HQ and NQ core sizes have been
used historically at the Mt Boppy and
Pipeline Ridge prospects. This core is
geologically logged and subsequently
halved for sampling.
• Reverse Circulation (RC) Drilling
- Drill cuttings are extracted on a
one metre basis from the RC
return via cyclone. Representivity
of sampling was achieved from a 2-
bag rotary sampler, which
generates assay and backup
samples simultaneously as 1m is
drilled
• Approximately three kilograms of the
recovered material is bagged into calico
bags for analysis. Sample material is
submitted for gold analysis by either
500g Photon (Exploration assays) or 50g
Fire assay (Mineral Resource
delineation assay). pXRF
measurements are taken on rock chip
material within the Assay sample bag
every metre drilled.
• Residual material may be retained on
the ground near the hole till evaluation
is complete. Composite samples may be
obtained from the residue material for
initial analysis, with the split samples
remaining with the individual residual
piles until required for re-split analysis
or eventual disposal.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.) and
details (e.g. core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc.).
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Diamond Drilling
• Diamond drilling involves the coring of
rock by a rotating diamond bit, which
cuts through rock and emplaces the
core in a variable 1.5-commonly 3m –
6m core barrel located immediately
behind the bit. The core barrel is
retrieved at the discretion of the driller
(e.g. depending on ground conditions)
or when it is full. The core can be
marked to provide orientation data of
bedding or structures etc. Double barrel
and triple tube (in difficult ground to
protect washout of core) core barrels
are used for diamond drilling.
• RC Drilling
• Down hole rock cuttings are generated
by a down-the-hole (DTH) rotating
hammer bit, which breaks and
pulverises the rock, which under high air
pressure is passed up the inner tube and
extracted from the RC return via
cyclone. Normally material is sampled
on a 1 metre basis (see above).
Page | 16
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225 Tel 02 7253 2020 www.manukaresources.com.au
Drill sample
recovery
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
• All geology input is logged and validated
by the relevant area geologists,
incorporated into this is assessment of
sample recovery. No defined
relationship exists between sample
recovery and grade. Nor has sample bias
due to preferential loss or gain of fine or
coarse material been noted.
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
• The total length and percentage of the relevant
intersections logged
Share your feedback