Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
23 January 2024
ASX: MKR
December 2023 Quarterly Activities Report
Key Points
•
Mt Boppy gold sales of 2,507oz & 10,176oz Ag were up 19% on Sept
Qtr but production lagged expectations, partially inhibited by poor
weather.
• Average feed grade was 1.53g/t Au, down 10% on the Sept Qtr but
remains above the rock and tailings dump resource grade of 1.46 g/t
• 70,000t of ore processed for the Quarter (out of 115,000t screened)
• Net Cash Flow from Operating Activities was $1.08m
• Exploration drilling at the Pipeline Ridge prospect and also targets
beneath the current Mt Boppy pit remains prioritised for Q1 2024.
• Results due in March Quarter from a sonic drill program completed
on the Mt Boppy waste dump in November and will underpin an
updated mine plan.
• A further Mt Boppy JORC Resource update remains expected in the
March 2024 Quarter.
• The regulatory / approvals environment for Manuka’s 100%-owned
Taranaki VTM Project dramatically improved during the Quarter
following election of a new pro-mining government in New Zealand
in October 2023.
• Expected to usher in a new era of project approvals and support for
seabed mining.
• New Zealand’s new Government has committed to a range of key
policy initiatives for the development of natural resources and
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
mining projects, particularly a ‘fast track’ one stop shop consenting
and permitting process.2
• The Taranaki VTM Project has a 3.2Bt JORC resource and a fully
approved Mineral Mining Permit MP555813
• The Company released its maiden Vanadium JORC Code 2012
mineral Resource and with 1.6Mt of contained V2O5 ranks as one of
the larger drilled vanadium deposits globally4
• Manuka’s VTM Project well positioned to benefit from the fast track
legislation with its mining licence already approved and awaiting
reissuance of EPA approvals.
Dennis Karp, Manuka’s Executive Chairman noted:
“2024 looks to be a defining year for the Company. The new NZ government is very focussed
on fast tracking sound mining projects and makes particular mention of our 100% owned
VTM Project in the Taranaki.
The Project is not only a lowest cost quartile iron ore producer but also sits in the lowest
quartile for carbon emissions. It has an existing Mineral Mining Permit MMP55581 which
was granted in 2014. Estimates prepared by management based on the 2013 TTR PFS5
(with updates and using current iron ore and currency pricing) target a project NPV of
USD$1.8B. We are currently working though final aspects relating to the reissuance of EPA
consents to operate, and management believe from recent public NZ government
commentary that this will be forthcoming in the near future.
At the same time, we await the results of a Sonic drill program conducted on our waste
dumps and tailings at Mt Boppy during November. These results will provide us with a
greater understanding of the grade curve and general composition of the ~4.0Mt of material
targeted for screening and retreatment.”
2 Coalition Agreements between New Zealand National Party & New Zealand First and ACT New
Zealand on forming the 54th Parliament dated 24 November 2023 see https://www.nzfirst.nz/coalitionagreement
3 ASX release 1 March 2023
4
Ibid
5https://www.manukaresources.com.au/site/pdf/409881a7-bbc5-4433-936a-81eee66661bb/South-
Taranaki-Bight-Pre-Feasibility-Study.pdf
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Overview of the December Quarter 2023
Mt Boppy
The December Quarter was the second full quarter for the Mt Boppy screening program. A
total of 107,216 of Mt Boppy waste and dump materials was screened in the December
Quarter, generating 67,514 (8mm)t of plant feed for processing. Weather conditions posed
challenges for both processing and trucking in both November and December.
Production at the Wonawinta plant for the Quarter was 69,751 tonnes milled at an average
head grade of ~1. 53g/t.
Operating Summary
Summary
Tonnes Milled
Gold in Circuit (31-12-2023)
Gold Recovered
Gold Sold
Silver Sold
Gold Recoveries
Revenues
t
oz
oz
oz
oz
AUD $’000
Dec Quarter
69,751
316
1,576
2,508
12,013
64%
7,919
Financial Year (YTD)
136,728
316
4,942
4,626
23,900
70.1%
14,458
Taranaki VTM Project
In a significant and highly positive turn of events, the election of the new coalition
government in New Zealand, led by the National party and new PM Christopher Luxon, has
dramatically altered the political landscape for the country’s resource sector.
The Government’s initiatives include a ‘100 Day Plan’:
• Updating the Crown Minerals Act to promote the use of Crown Minerals;
• Creating a Critical Minerals list likely to include vanadium and titanium;
• Prioritising regional and national projects of significance;
• Amending the Resource Management Act (RMA); and
• A ‘fast track’ one stop shop consenting and permitting process for natural resource
projects of national significance.
The newly appointed Minister for Resources, Hon Shane Jones, is strongly supportive of
the country’s mining industry, in particular the development of offshore titanomagnetite iron
sand and vanadium resources in the South Taranaki Bight.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Minister Jones stated6
“Seabed mining has a legitimate place in New Zealand’s regional economy.” and “Unless
we use our natural resources of our country, unless we maintain investment in our natural
resource sector we won’t get the rare earth minerals that are in New Zealand, we won’t
keep the young people who are desperate to improve the quality of their life in New Zealand
– they’ll go to Australia to dig up Kalgoorlie and that’s something grossly hypocritical about
the green movement.8”
Manuka’s wholly owned subsidiary, Trans-Tasman Resources Limited (TTR), was granted
Mineral Mining Permit MMP55581 located 22km to 36km offshore in New Zealand’s South
Taranaki Bight (STB) in 2014.
Expert reports have concluded the proposed VTM mineral recovery in STB will avoid
material harm, will favour caution and environmental protection in relation to the effects of
the proposed mining operations and resulting sedimentation on biota in the STB including
no adverse ecological effects on marine mammals and seabirds. Accordingly, there are no
known aspects of TTR’s 2017 environmental Consents that are an impediment to having
them re-approved.
TTR intends to commission additional metallurgical test work to optimise the flowsheet for
processing of the VTM concentrate (including the recovery of vanadium and titanium) during
2023 and 2024 and undertake marketing (and related) studies building on work completed
during the Pre-Feasibility Study (PFS).
The key attributes of the VTM Project are as follow:9
• A 1,043Mt JORC Resource in Stage 1 Mine Area
• Minimum 20year Life of Mine
• C1 costs approximately US$20 - US$24 / tonne of concentrate
• VTM Concentrate Grade 0.5%V205, 8.5%Ti02 and 55% - 57%Fe
• Total 3.8Bt STB JORC Resource Base
• 60-year resource at 5Mtpa production rate
Globally VTM titanomagnetite iron sands are in strong demand as feed for electric arc
furnaces (EAF) to produce low carbon “green steel”. EAF steel making burns 50% less coal,
https://realitycheck.radio/shane-jones-nz-first-cabinet-minister-a-coalition-update-and-the-recentpolicy-gains-for-nz-first/
8 Ibid
9 ASX release 1 August 2022
6
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
reduces emissions by more than 45% in the steel making process and sets the platform for
meeting net zero goals by 2050.
Vanadium, apart from its widespread and increasing application as a steel alloying element
to strengthen steel, is rapidly building demand as an electrolyte in vanadium redox flow
batteries (VRFB) which are fast becoming the preferred IP for large grid-scale high-capacity
battery stations to store renewable energy due to their longevity and fire safety
characteristics, ahead of all competing technologies.
Australia is now building its first 850Mw, with 1,680Mwh capacity, VRFB Waratah Super
Battery at the former Munmorah coal fired power station in NSW to drive Australia’s
transition to a low carbon economy.
With concerns over the sovereign security of vanadium supply from key producing nations
China (comprising 55% of global production), Russia (20% of global production), Brazil
(15%) and South Africa (10%), vanadium now has “critical mineral” status in Australia, USA,
Canada and the EU. The demand for VTM concentrate for EAF low carbon green steel
production together with the rapidly growing demand underpinning rising prices for
vanadium, suggests the potential of our Taranaki VTM Project, hosting one of the largest
known vanadium resources in the world with 1.6Mt contained V2O5 metal, will attract the
competitive capital investment and metal producer offtake interest required to develop the
project.
The Taranaki VTM Project, when in production with an estimated annual production of
10,000 tonnes of vanadium metal, will make Manuka one of the leading vanadium producers
in the world and propel NZ into the third largest producer of the metal after China and
Russia.
Resource Growth and Exploration Outlook
The Company’s geological team has continued to implement the exploration work
programmes established from the Q1 2023 Strategic Review. The MKR Resource Triangle
(Fig. 1) shows the current classification of the exploration targets, and those highlighted on
which work was undertaken during Q3 and Q4 023.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Figure 1
The resource base at Mt Boppy outside of the in-pit resources continues to expand. The
Mt Boppy waste dump is estimated to contain approximately 3.92 Mt of variably mineralised
waste rock and old tailings material. Of this, between 1.6-1.9Mt is targeted as a screened
product. A Sonic drilling programme was completed on the Main Waste dump during
December 2023 and results will be reported next quarter. Twenty-six boreholes totalling
503m were drilled, and the whole core recovered screened to -10, +10-22, and +22mm
fractions, and fore assayed and bottle rolled to provide insitu and recoverable gold grade
estimates. The drilling programme will underpin the assessment of the economic viability
of the Main waste dump and the TSF3 tailings repository. Material has also been specifically
sampled for future metallurgical testwork.
Bulk sampling of the McKinnons low grade rock dumps has continued intermittently during
the quarter and are planned to be completed during the March 2024 quarter.
Other work programmes that have been progressed include,
•
•
•
Continued geological modelling and assessment of historic drilling data of the
Pipeline Ridge base metal – gold deposit, assessment of available diamond core.
The initial drilling programme is now scheduled during calendar H1 2024;
Follow up examination of targets generated from a detailed regional geophysics
synthesis of the Wonawinta ML and exploration tenements, including conducting
a merged data reinterpretation of all available magnetic data and a revised IP
interpretation for the McKinnons gold prospect; and
Continued analysis and reorganisation of the Company’s extensive drilling and
geochemical sampling database.
Drill programmes for 2024 have been scoped in-line with prioritisation of the targets on
Figure 1 with encouraging engagement with local drilling contractors for these activities.
Exploration of the Pipeline Ridge prospect and Mt Boppy mine deeps drilling are priority
targets, and these activities are expected to start during Calendar H1 2024.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Cashflow and Hedging
Manuka reported Operating cash flow for the Quarter of $1.08 million.
The Company did not have any open hedge contracts as at 31 December 2023.
The principal amount outstanding at Quarter end to the Company’s senior secured lender,
TransAsia Private Capital (TA) was US$8.0 million and as advised in the previous Quarterly,
has been extended for repayment on 30 September 2024.
Total borrowings as at 31 December 2023 were A$27.75 million. Unused facilities available
at Quarter end were A$664,116 and the cash balance was $551,195. Furthermore, there
was another A$0.957 million equivalent of gold in circuit.
In accordance with ASX Listing Rule 5.3.3, during the quarter, the Company made cash
payments of $0.214 million to related parties and their associates (refer items 6.1 and 6.2
of the Appendix 5B). This was the aggregate amount paid to the directors including salary,
directors’ fees, consulting fees and superannuation.
Mining Exploration Activities
In accordance with ASX Listing Rule 5.3.1 cash outflows for the quarter in relation to
exploration and evaluation activities were $0.5 million (refer Item 2.1(d) of the Appendix 5B)
and predominantly comprised expenditure on:
•
Bulk sampling of gold mineralised material continued at Mt Boppy on both the
ROM and Main waste dump. This sampling will augment a ~500m Sonic drilling
program on the Main Waste dump completed during the quarter. Results will be
used to update current mineral resource estimates for these areas in the
following quarter, as well as provide representative material for ongoing
metallurgical test work. Investigations also continued at the former McKinnons
gold mine waste dump;
•
Assessment of the Pipeline Ridge Gold-Polymetallic deposit plus the deeper
mineralisation in the Mt Boppy orebody continued, including inspection of historic
drill core; and
•
Follow-up ground work has been initiated on targets generated from the collation
of Wonawinta and Canbelego areas geophysical surveys. A number of untested
geophysical targets emerged from these studies and will be progressed during
2024.
•
Mining Development Activities
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
In accordance with ASX Listing Rule 5.3.2 cash outflows for the quarter in relation to mining
development activities were $96,000 (refer items 1.2(b) and 2.1(f) of the Appendix 5B).
These outflows relate to continued screening activities and mobile equipment at Mt Boppy.
Mining Production Activities
In accordance with ASX Listing Rule 5.3.2 cash outflows for the quarter in relation to mining
production activities were $4.63 million (refer Item 1.2(c) of the Appendix 5B) and comprised
the following:
Crushing contractors
$0.80 million
Hauling contractors
$0.98 million
Processing
$2.85 million
Mining Tenements
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter
ended 31 December 2023.
Wonawinta Silver Project tenements are located approximately 90 kilometres to the
south of Cobar, NSW, and comprises one (1) granted mining lease and seven (7)
granted exploration licences as below, plus processing plant and associated
infrastructure.
Tenement
ML1659
EL6482
EL7345
EL6155
EL6302
EL7515
EL6623
EL8498
Percentage held / earning
100%
100%
100%
100%
100%
100%
100%
100%
Change during Quarter
-
Mt Boppy Gold Project tenements are located approximately 45 kilometres east of
Cobar, NSW, adjacent to the Barrier Highway. The Project comprises four gold
leases, two mining leases, one mining purpose lease and one exploration licence
which encompasses the MLs and extends the project area to the south.
Tenement
GL3255
GL5836
GL5848
GL5898
ML311
ML1681
MPL240
EL5842
Percentage held / earning
100%
100%
100%
100%
100%
100%
100%
100%
Change during Quarter
-
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Taranaki VTM Iron Sand Project tenements are located offshore in the South
Taranaki Bight of the North Island, New Zealand. Tenements acquired as a result of
the acquisition of TTR (ASX 11 November 2022) comprise one granted mining permit
and one granted exploration permit.
Tenement
MMP55581
MEP54068
Percentage held / earning
100%
100%
Change during Quarter
-
There were no tenements disposed of during the Quarter.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
This announcement has been approved for release by the Directors of Manuka Resources Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
02 7253 2020
Media Contact
Angela East
M+C Partners
0428 432 025
Important Information
This report includes forward-looking statements and comments about future events, including the Company’s expectations about
the performance of its businesses. Forward-looking words such as “expect”, “should”, “could”, “may”, “predict”, “plan”, “will”,
“believe”, “forecast”, “estimate”, “target” or other similar expressions are intended to identify forward-looking statements. Such
statements involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company and which may cause actual results, performance or achievements to differ materially from those
expressed or implied by such statements. Forward-looking statements are provided as a general guide only and should not be
relied on as an indication or guarantee of future performance. Given these uncertainties, recipients are cautioned to not place
undue reliance on any forward-looking statement. Subject to any continuing obligations under applicable law, the Company
disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in this report
to reflect any change in expectations in relation to any forward-looking statements or any change in events, conditions or
circumstances on which any such statement is based. No Limited Party or any other person makes any representation, or gives
any assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in the
report will occur.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
About Manuka Resources Limited
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration company with key assets
located in the Cobar Basin, central west New South Wales. In addition to its recent acquisition of TransTasman Resources Limited owner of the Taranaki VTM Project, it is the 100% owner of two fully permitted
mining projects, one gold and one silver, both within the Cobar Basin, which include the following:
▪
Gold - Mt Boppy Gold mine, 48-person mine camp and neighbouring tenements, hosting an existing
open pit mineral resource8 and combined ROM, waste and tailings material all of which lend
themselves to upgrading through screening. The Company has commenced a screening and gold
recovery project, processing the product at its Wonawinta plant. Manuka also awaits the outcome of
its forthcoming exploration program to determine as to whether the future for mining any Mt Boppy
extensions will be as an underground or open cast mine;
▪
Silver - Wonawinta silver project, with mine, 84 person mine camp, processing plant and neighbouring
tenements. Previously renowned as the largest primary producer of silver in Australia, the mine hosts
a significant JORC resource9. The Wonawinta processing plant has a nameplate capacity of >850,000
tonnes per year (which the Company now sees expanded to >1.0Mt/yr.
The Taranaki VTM (vanadium titano magnetite) Iron Sands Project recently released its maiden vanadium
resource10 which ranks it as one of the largest drilled vanadium projects globally (as well as a 3.2Bt JORC
resource). The Project is located outside New Zealand territorial waters (within its EEZ or exclusive
economic zone) and has a granted mining licence, MP55581 permitting production of 5Mt/a. The project is
located in waters ranging between just 20 – 40 metres depth. The Project sits in the lowest quartile of the
iron ore production cost curve. The Company awaits the reissuance of its Environmental Approval before
completing its Bankable Feasibility Study.
8 ASX release 29 July 2022
9 ASX release 1 April 2021
10 ASX release 1 March 2023
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
APPENDIX 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Manuka Resources Ltd
ABN
Quarter ended (“current quarter”)
80 611 963 225
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 December 2023
Current quarter
$A’000
Year to date
(6 months)
$A’000
7,718
14,257
-
(4)
(b) development
(76)
(144)
(c) production
(4,630)
(9,227)
(d) staff costs
(1,732)
(4,212)
(138)
(1,386)
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
(112)
(468)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
50
236
1.9
Net cash from / (used in) operating
activities
1,080
(947)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
674
113
(d) exploration & evaluation
(500)
(782)
-
-
(20)
(20)
(e) investments
(f)
other non-current assets
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
2.2
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
(24)
2.6
Net cash from / (used in) investing
activities
154
(712)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
1,048
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(60)
3.5
Proceeds from borrowings
(475)
3,463
3.6
Repayment of borrowings
(328)
(2,435)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(36)
(70)
3.10
Net cash from / (used in) financing
activities
(838)
1,945
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
156
266
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
1,080
(947)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
154
(712)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(838)
1,945
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
552
552
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
552
266
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
552
266
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
214
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: 6.1 This is made up of amounts paid to the directors including salary, directors’ fees, consulting fees and
superannuation.
Note: 6.2 This is made up of amounts paid to the directors including consulting fees in respect of exploration activities.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
28,415
27,751
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
28,415
27,751
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Lender
Facility type
TransAsia
Private Capital
Limited
ResCap
Investments
Pty Ltd
Various
Secured Senior
Debt Facility
plus interest
Unsecured
Working
Capital Loan
Equipment
Finance
Short-term
finance
Tennant Metals
Trade Finance
stockpile facility
Various
Total Facility
664
Rate
Maturity
15,443
15%
30/09/2024
2,000
16%
30/09/2024
287
11%
29/04/2025
864
23%
9,821
35%
30/09/2024
3 year trade
finance facility
expiring April
2026
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
1,080
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(500)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
580
8.4
Cash and cash equivalents at quarter end (item 4.6)
552
8.5
Unused finance facilities available at quarter end (item 7.5)
664
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1,216
n/a
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3, answer item 8.7 as
“N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
tel +612 7253 2020
www.manukaresources.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
23 January 2024
Authorised by: ...................................................................................
Toni Gilholme – Company Secretary
On behalf of the Board of Directors
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity
that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged
to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in,
and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows
apply
Share your feedback
Discover