Mineral Resource Update - Mt Boppy Gold Project amended
Released
Released
Announcement PDF
ASX Announcement
16 April 2024
ASX: MKR
Amended Mineral Resource Update – Mt Boppy Gold
Project
Manuka Resources Limited (“Manuka” or the “Company”) advises that it has amended
the attached Mt Boppy Gold Resource Update with a minor referencing amendment and
the inclusion of information required by Listing Rule 5.8.1 as Attachment 1.
This announcement has been approved for release by the the Board of Manuka
Resources Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
0412 268 114
Media Contact
Ben Henri
M+C Partners
0473 246 040
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
ASX Announcement
15 April 2024
ASX: MKR
Mineral Resource Update – Mt Boppy Gold Project
Sonic drilling program delivers significant increase in Resource
confidence to support gold production at Mt Boppy
Manuka Resources Limited (“Manuka” or the “Company”) is pleased to release an
updated Mineral Resources Estimate for Mt Boppy. The Resource update supports
Manuka’s strategy to install a purpose-built gold processing plant at Mt Boppy and
recommence on-site gold production from Q4 2024.
Highlights:
•
The results of a recently completed Sonic Drilling Program over the Main Waste
Rock Dump and Dry Tailings have successfully delivered an updated Mineral
Resource Estimate for Mt Boppy.
•
The updated Resource comprises 4.28Mt at 1.19g/t Au for 163koz of contained
gold. Importantly, the updated Resource has seen an 100% increase in the
portion of contained gold ounces classified as Indicated.
•
The Mt Boppy Measured and Indicated Resource categories now comprises 82%
of total Resource Estimate.
•
A high-grade component of the Resource comprising 1.8Mt at 1.74g/t
containing 102koz Au has been identified as a basis for future mine planning.
•
The results support Manuka’s strategy to install on-site processing plant
at Mt Boppy and provides confidence in the development of a mine plan
that will underpin the recommencement of gold doré production.
Dennis Karp, Manuka’s Executive Chairman, commented:
“The Sonic Drilling Program was critical precursor to the recommencement of the
processing of rock dumps and dry tailings at Mt Boppy. The results of this program have
been extremely positive allowing us to significantly improve the confidence of our Mt
Boppy Resource.
Consequently, Manuka is confident in its strategy to progress the establishment of a fitfor-purpose on-site gold processing plant at Mt Boppy in the coming months and in turn
free up our Wonawinta process plant, most recently used to process Mt Boppy ore, for
future silver production from the existing Wonawinta Silver mine.
The bullish gold and silver markets, combined with the fact that Manuka has two granted
mining licenses - both fully permitted for on-site processing - and existing processing
infrastructure, translate to a very exciting time for the Company.”
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Mt Boppy Resource Statement Summary
The Mineral Resource Estimate at Mt Boppy has been updated subsequent to the completion
of a 26 borehole 506m sonic drilling evaluation programme over the Mt Boppy Rock Dumps and
Dry Tailings completed in December 2023 (Figure 1).
Figure 1: Location Sonic drilling collars over Mt Boppy Rock Dump (left) and TSF3 PAF (right)
The updated Resource comprises 4.28Mt at 1.19g/t Au for 163koz of contained gold of which
82% is contained in the Measured and Indicated categories (Table 1). Importantly, the Resource
update sees the ounces classified as Indicated increase by 100% over the previous estimate.
The Resource for Mt Boppy comprises (Table 2):
Rock dumps and tailings depositories, with gold grades derived from recent Sonic drilling to
bedrock, and fire assay head grades of +90, -90+20, +10-20, and -10mm size fractions, each
weighed to ascertain mass % distribution. The rock dump and tailings Resources are reported
at a cutoff of 0.25g/t Au total 3.9Mt tonnes at a grade of 0.89g/t Au for 110,628oz Au.
In-situ hard rock Resources including:
•
a Mt Boppy open cut pit shell that reaches a depth of 215m below surface at the
southern end of the Mt Boppy deposit. Material within the current pit design is reported
at a 1.6g/t Au cut off and material below the pit design is reported to a 3.0g/t Au cut off
•
the Boppy South mineral zone based on a grade shell modelled at a 1.6g/t cut off.
This prospect still requires final drilling and evaluation before assessing the viability of
establishing a small opencast mine.
The incremental change to the overall Mt Boppy Resource relates to updates to Rock dumps
and Tailings depositories. The combined Mt Boppy Open Cut and Boppy South Resource of
282kt at a grade of 4.95g/t Au for 44,820 ounces gold remain unchanged from that previously
reported (ASX Release 25 August 2023) and all material assumptions continue to apply.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Table 1 - Mt Boppy Global Resource by Classification at 15 April 2024
Tonnes
Grade
Contained
Contained
kt
g/t Au
koz
%
Measured
107
5.25
18.0
11%
Indicated
3,127
1.16
116.5
71%
M+I Sub Total
3,233
1.29
134.5
82%
Inferred
1,046
0.87
29.4
18%
Total
4,279
1.19
163.9
100%
Resource Classification
Table 2 - Mt Boppy Global Resource by Location at 15 April 2024
Ore Location
In-ground
Hard Rock
Rock Dumps
Tailings
Total
Classification
Tonnes (kt)
Au (g/t)
Au (koz)
Measured
107
5.25
18.0
Indicated
158
4.86
24.7
M&I
265
5.01
42.7
Inferred
17
3.90
2.1
Mt Boppy Open Pit
282
4.95
44.8
Inferred
110
2.39
8.5
Mt Boppy South Pit Shell
110
2.39
8.5
Indicated
2,116
0.80
54.3
Inferred
881
0.61
17.2
Total Rock Dumps
2,997
0.74
71.6
Indicated
853
1.37
37.5
Inferred
38
1.30
1.6
Total Tailings
891
1.36
39.0
Measured
107
5.25
18.0
Indicated
3,127
1.16
116.5
Total M & I
3,233
1.29
134.5
Inferred
1,046
0.87
29.4
Total Resource
4,279
1.19
163.9
An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated
or Measured Mineral Resource and cannot be converted to an Ore Reserve. It is reasonably
expected that most of the Inferred Mineral Resources could be upgraded to Indicated Mineral
Resources with continued evaluation.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Figure 2: Drone image looking south showing the main components of the Rock Dump and
Tailings Resources in relation to the Mt Boppy open pit.
An evaluation of the total Resource update has identified a high-grade subset including both
the Open Pit, Rock Dumps and Tailings and comprising 1.8Mt at 1.74g/t for 102koz of gold as
the basis for future mine planning (Table 3, Figure 3). Table 3 is therefore a portion of the Global
Resource reported in Table 2 above and has less tonnes in some sources.
Table 3 - High-Grade component of the overall Mt Boppy Resource
Tonnes
(kt)
Grade
(g/t)
Contained Gold
(koz)
Boppy Main Waste Dump (Oxide)
231
1.74
13
Boppy Main Dump (Fresh)
243
1.45
11
Current Stockpiles (+22mm)
85
1.11
3
TSF3 PAF
135
1.37
6
Mt Boppy Open Cut1
233
4.14
31
Sub Total
928
2.15
64
Tailings Boppy ROM
12
1.45
1
Tailings Boppy Main Waste Dump
121
1.33
52
Tailings TSF3
758
1.29
32
Sub Total
891
1.30
37
Grand Total
1,818
1.74
102
Source
1 This is a pit shell constrained open cut and has less tonnes than the non-constrained global resource in Table 2
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Figure 3: Priority areas with the Main Waste Rock Dump for future mine planning
Additional Information
The Company most recently produced gold by screening rock dump and tailings material at the
Mt Boppy ROM over the period May to December 2023. A decision was taken to halt operations
to allow for the derisking of the grade distribution control ahead of mining the Boppy Main Waste
Rock Dump and Dry Tailings.
Sonic Drilling Program
A 26-borehole sonic drilling evaluation was completed on the Boppy Main Waste dump and the
TSF3 impoundment including Potential Acid Forming (PAF) material overlying part of the
tailings. The sonic evaluation drilling has enabled sampling of the full profile of the rock and
tailings dumps, and thus assessment of the economic viability of treating crushed and screened
rock dump fines plus tailings (these have already been subject to milling and cyanidation).
Sonic drilling proved to be an excellent method in evaluating unconsolidated rock dump and
tailing dam material producing a more representative sample than reverse circulation or
diamond core methods. The method is similar to diamond drilling in that a core (90mm diameter
core in this case) of undisturbed material is collected in a core barrel, and then pressured out
into a similar diameter plastic tube, which is trayed for logging and sampling purposes (Figure
4). Sonic drilling penetrates strata with a combination of very high resonant vibrations, hydraulic
pressure and a rotating drill string.
Sampling was conducted on a 1 metre basis or if there was a lithological change. Gold analyses
have been undertaken on the sonic core at the Gekko Laboratory (Ballarat). Analyses include
fire assay head grade, bottle roll and residual tails fire assay on -10, +10-20, +20-90mm size
fractions. Selected intervals from the drilling program are shown int Table 5.
The Mt Boppy open pit and stockpiles have previously been mined and processed by the
Company through the Wonawinta Processing Plant located 150km south. The Company has
indicated it intends to establish a new fit-for-purpose process plant on-site at Mt Boppy.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Figure 4: Sonic drilling and sampling (Left). Boppy Main Waste Rock dump sonic drilling AoI for
each borehole, defining Indicated Resource areas (Right).
Table 5: Selected Intersections of sonic boreholes
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Resource Estimation
The Mt Boppy Mineral Resources have been updated through the completion of a sonic drill
evaluation of the Boppy Main Waste Dump and parts of the TSF3 enclosure. The evaluation is
subsequent to a period (May to December 2023) of mining and processing Boppy ROM dump
and tailings material, and where independent (Gekko Lab) fire assays have been used for the
estimation. Previous estimations of the Mt Boppy open cut resources remain unchanged.
The Boppy Main Waste Dump and TSF3 dumps have been re-estimated using the sonic drilling
results. Models of the 3 lithological classes (Fresh, Oxide, Tailings) were generated in
Micromine, and constrained by surface DTM’s created from drone imagery and GPS surveys.
Grade/Tonnage tabulations and Area / Block locality for the various lithological classes are
shown in Annexure 1. Sonic drilling grades for each area were calculated using weighted
average grade x width. A 0.25g/t cutoff grade was applied to all rock and tailings dump blocks,
and mainly applies to low grade oxide material which is not deemed to be likely to be
economically viable. Classification between Inferred and Indicated Resources was delineated
by a 40m (Indicated) area of influence (“AoI”) for each borehole (Figure 4). Material outside the
AoI was classified as Inferred.
Previous Mineral Resource Estimate
Table 6 - Mt Boppy Resource by Classification at 25 August 2023
Tonnes
Grade
Contained
Contained
kt
g/t Au
koz
%
Measured
107
5.25
18.0
11%
Indicated
605
3.01
58.5
37%
M+I Sub Total
712
3.34
76.5
48%
Inferred
1,770
1.47
83.6
52%
Total
2,482
2.01
160.1
100%
Resource Classification
This announcement has been approved for release by the the Board of Manuka
Resources Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
0412 268 114
Media Contact
Ben Henri
M+C Partners
0473 246 040
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
ATTACHMENT 1:
Mineral Resources and Ore Reserves estimates are reported in accordance with the ASX listing
rules and the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC 2012). The following points are disclosed in accordance
with the requirements of ASX Listing Rule 5.8.1.
Geology and Interpretation
This Mineral Resource estimate pertains to surface waste rock and tailings dumps at Mt Boppy
Mine, plus in situ hard rock resources already reported (ASX Release 25 August 2023) within
the Boppy Open pit and the Boppy South pit shell.
•
•
•
•
•
•
•
•
The Mount Boppy deposit is located in the northern part of Devonian Canbelego-Mineral
Hill Rift Zone, flanked by the Kopyje Shelf, on the far eastern side of the Cobar Basin.
Mineralisation occurs in brecciated and silicified sediments and quartz veining
developed along a west-dipping fault that down-throws Devonian aged Baledmund
Formation rocks on its western side against Orodovician age Girilambone Group rocks
on it eastern side.
The higher grades tend to lie in the hanging wall rocks (Baledmund Formation) on the
western side of the Main Lode where the dip shallows.
The Main Lode strikes approximately north-south and dips at approximately 70-80° west.
Historical underground workings were supported with timber and back-filled with tailings
sands from processing. Sand fill samples grade between 0.05g/t Au and 38g/t Au with
an average of 3.5g/t Au.
Mineralisation is predominantly gold, associated with grey quartz veins and minor pyrite.
Geological interpretation of the waste rock and tailings dumps was carried out using
implicit modelling in Micromine Software. Three lithotypes (Fresh waste rock; Oxide
waste rock and Tailings were assigned
Interpretation was constrained to assigning grade intercepts to one of the three waste
lithotypes, and then conducting a polygonal assessment of continuity laterally and
vertically, constrained by each lithotype boundary.
Sampling and sub-sampling techniques
•
•
•
26 sonic boreholes totalling 506m were drilled on the Mt Boppy Main waste and the
TSF3 tailings dumps.
The vertical sonic drill holes were sampled at 1m intervals through to the base of the
dumps. The core retrieved was of 90mm diameter, and recoveries average 90%.
Sub-samples through each borehole dump intersections were generated using sieve
sizes of 10mm and 20mm.
Drilling techniques
•
•
Sonic drilling uses a face sampling bit that penetrates unconsolidated strata under
hydraulic pressure with slow rotation and very high sound frequency.
Material drilled is directly pressed into a 3m core barrel behind the bit that has an
automatic flap to eliminate any core loss.
The criteria used for classification
•
•
•
•
•
The dumps were drilled where access permitted on a 40-80m grid. A 0.25g/t cut-off was
applied to the estimation based on previous mining during 2023 of the same material.
Grade distribution in waste dumps is variable depending on source and nature of the
waste.
Classification was based on a combination of lithotype and potential mining areas as
well as the Area of Influence (“AoI”) of each borehole.
Indicated Mineral Resources criteria: Each borehole was attributed a 40m (“AoI”).
Inferred Mineral Resources criteria: Any material falling outside these areas.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Sample analysis method
•
Gekko Laboratories (Ballarat) undertook all assaying. The assay procedure for gold
grade (Aug/t) was a 50g aliquot and a four-acid digest with a Fire Assay finish.
Estimation methodology
•
•
•
•
Geological models were created for the Boppy Main waste and TSF3 dumps using
drillhole data, drone imaging and digital terrain surface modelling of each dump.
1 metre composites were used for the estimation.
Polygonal methods were used to estimate the volume of each lithotype, and grades
averaged against width of intersection for each lithotype block.
Averaged density estimates by lithology were derived from density measurements from
previous mining of this material (Fresh Rock 1.8 t/m³; Oxide rock 1.70t/m³ and Tailings
1.2t/m³).
Cut-off grade(s) including the basis for the selected cut-off grade(s)
•
The estimates were reported above a 0.25g/t Au cut-off. This cut-off defines tonnage
and grade of mineralised waste dump material that has reasonable prospects for the
eventual economic extraction in part or in total, subject to the application of appropriate
modifying factors during the estimation of Ore Reserves.
Mining and metallurgical methods and parameters, and other material modifying factors
considered to date
•
Modifying factors such as mining and metallurgical methods and parameters are part of
the process of Ore Reserve estimation. As per the JORC 2012 Code (Clause 41:
“Reporting of Mineralised Fill, Remnants, Pillars, Low Grade Mineralisation, Stockpiles,
Dumps and Tailings”) the current Mt Boppy Mineral Resource estimation of the waste
rock and tailings dumps excludes any modifying factors.
Compliance Statements
The preceding statements of Mineral Resources conforms to the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012
Edition. Due to rounding to appropriate significant figures, minor discrepancies may occur. All
tonnages reported are dry metric. Based on the study herein reported, delineated mineralization
of the Mt Boppy deposits is classified as Measured, Indicated and Inferred resources according
to the definitions of the JORC Code (2012) as presented in Tables 1, 3 and 4. The Mineral
Resource is depleted for the Boppy opencut to the November 30th 2021 projected pit pick-up,
and treated (screened) material on the Boppy ROM dump as at 16 December 2023.
Competent Persons Statement
The information in this report that relates to Mt Boppy Dump Mineral Resources is based on,
and fairly represents, information and supporting documentation prepared by Mr Philip Bentley,
who is a Certified Professional by The South African Council for Natural Sciences (SACNASP
# 400208/05 ) and is the Chief Geologist employed by Manuka Resources Ltd. Mr Bentley has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Bentley consents to the inclusion in the statement of
the matters based on his information in the form and context in which it appears.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
About Manuka
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration company with
key gold and silver assets located in the Cobar Basin, central west New South Wales and
offshore vanadium bearing iron sands in the South Taranaki Bight of New Zealand. These
projects include:
The Mt Boppy Gold Mine (Cobar Basin, NSW)
The Mt Boppy gold mine is located 43km east of Cobar, in the Central West region of New South
Wales. The current Mt Boppy Mineral Resource2 is estimated at 4.3Mt at 1.19g/t gold and
comprises a mix of oxidised and transitional/fresh in-ground mineralisation, mineralised rock
dumps and mineralised tailings.
The Company has to date processed its stockpiles and gold mineralised waste product through
its Wonawinta plant. Manuka are currently pursuing a strategy of establishing of a fit-forpurpose, on-site crush-screen-mill-float facility to enhance the economics of the Mt. Boppy Mine
and the value of near-mine prospects. The Mt Boppy site includes a 48-person mine camp and
is fully permitted for the proposed processing plant and on-site production.
Mt Boppy Gold mine
The Wonawinta Silver Mine (Cobar Basin, NSW)
Previously Australia’s largest primary silver producer, Wonawinta produced approximately 3
million ounces of silver during 2012-2013, and an additional 500,000oz of silver in 2022. The
mine hosts a significant Resource3 - including stockpiles and shallow oxide material, Wonawinta
contains total Resources of 38.8 million tonnes at 42g/t silver for 52.4 million ounces. Within
this there is a higher grade component of 4.5 million tonnes at 97g/t silver for 14 million ounces.
The Wonawinta processing plant has a nameplate capacity of approximately 850,000tpa. The
Company is reviewing the potential of recommencing operations at Wonawinta, taking
advantage of the strengthening silver price environment.
Wonawinta Silver Mine
2 ASX Release 25 August 2023
3 ASX release 1 April 2021
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
The Taranaki VTM Project (South Taranaki Bight, New Zealand)
Manuka is the 100% owner of the Taranaki VTM (vanadium titanomagnetite) Iron Sands Project.
The Project sits in the lowest quartile of the iron ore production cost curve.
The Taranaki VTM Project comprises a 3.2Bt Resource4 at 10.17% Fe2O3, 1.03% TiO2 and
0.05% V2O5 (1.6Mt V2O5) ranking it as one of the largest drilled vanadium projects globally. The
Project is located 22km to 36km offshore in New Zealand’s EEZ, or Exclusive Economic Zone,
outside the 12 nautical limit from the shoreline, in waters ranging between 20 to 50 metres depth
and has a granted mining license, MP55581, permitting production of 5Mtpa. On granting of
final government approvals to operate the Company will complete its Bankable Feasibility Study
on the Project.
Location of Taranaki VTM Project
Important Information
This report includes forward-looking statements and comments about future events, including the
Company’s expectations about the performance of its businesses. Forward-looking words such as
“expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” or other
similar expressions are intended to identify forward-looking statements. Such statements involve known
and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company and which may cause actual results, performance or achievements to differ
materially from those expressed or implied by such statements. Forward-looking statements are provided
as a general guide only and should not be relied on as an indication or guarantee of future performance.
Given these uncertainties, recipients are cautioned to not place undue reliance on any forward-looking
statement. Subject to any continuing obligations under applicable law, the Company disclaims any
obligation or undertaking to disseminate any updates or revisions to any forward-looking statements in
this report to reflect any change in expectations in relation to any forward-looking statements or any
change in events, conditions or circumstances on which any such statement is based. No Limited Party
or any other person makes any representation, or gives any assurance or guarantee that the occurrence
of the events expressed or implied in any forward-looking statements in the report will occur.
Compliance Statements
Information included in this presentation relating to Mineral Resources has been extracted from the ASX
Announcements “Amended Mt Boppy Mineral Resource Estimate Update” (25 August 2023), “Maiden
Vanadium Resource at Taranaki VTM Iron Sand Project” (1 March 2023) and “Manuka – Wonawinta
Silver Project Mineral Resource Update” (1 April 2021) available to view at
www.manukaresources.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimates and that all
material assumptions and technical parameters underpinning the estimates, continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the Mineral Resource Estimates.
4ASX release 1 March 2023
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
ANNEXURE 1
BOPPY MAIN WASTE DUMP AREA TONNAGE / GRADE EXTENT AND DISTRIBUTION
OXIDES
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
TAILINGS
FRESH ROCK
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Appendix 1: JORC Code 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
• JORC Code explanation
Criteria
Commentary
Sampling techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple.
• Samples were collected from a variety of methods from three main phases of drilling:
Polymetals (PML, 2002-2015), Black Oak Minerals (BOK, 2015), MAAS (2016) and Manuka
Resources (MKR, 2020-present).
• From historic reports, PML and BOK sampling techniques all followed industry best practice.
• Sampling techniques for RC drilling comprised 1 m reverse circulation samples, from which
3 kg was pulverised to produce a 50 g charge for fire assay.
• Diamond drill core was cut in half over varying interval lengths depending on logged
geological units and was crushed and pulverised to produce a 50 g charge for fire assay.
• Open hole percussion and blast hole samples collected over 2.5 m intervals sectioned the
drill returns and pulverised to produce a 50g charge for fire assay or 200g charge for bottle
roll leach
• Sonic drill core was collected in plastic tubes and transferred to drill trays. Split 50:50
samples were taken each metre unless there was alithological change.
• Rock and tailings dump samples were collected by mechanical excavations from 2-3m deep
pits excavated on a 40m grid, followed by trenching joining the pits together. This material
was screened initially through a rotating 8mm and subsequently 12mm trommel. Grade
samples were taken from cones generated from each 2 Front End Loader (FEL) bucket
feeds.
Drilling techniques
• Drill type (eg core, reverse circulation, open-hole
• PML and BOK: Diamond (HQ diameter) and RC drilling (5.5 inch face sampling bit), Open
hole percussion blasthole drilling
• MAAS: RC drilling (5.5 inch face sampling bit)
• MKR: RC drilling (5.5 inch face sampling bit), open hole percussion blasthole drilling
• MKR used Sonic drilling (90mm diameter coring) for the Main Waste dump and TSF3 tailigs
dump evaluation
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
Drill sample recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• No recovery information is available for pre-2011 drilling
• For PML and BOK RC drilling from 2011 onwards, recoveries were recorded by comparing
the weight of each metre of sample to a theoretical sample weight, estimated using the hole
diameter and the degree of weathering. The average recovery was calculated to be 80%,
with no appreciable difference between weathering domains.
• PML and BOK Diamond drilling recoveries were measured and recorded, with average
recoveries of 98% within mineralized zones. There was no correlation between recovery
and gold grades.
• MKR RC drilling did not quantitatively record recovery but RC piles were qualitatively
assessed. Poor to no recovery zones were commonly associated with historic stopes.
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Criteria
• JORC Code explanation
Commentary
• No relationship exists between gold grades and recoveries in either RC or diamond logging.
• MKR Sonic drilling averaged 89% recove
Share your feedback
Discover