Maiden Silver Reserve
Released
Released
Announcement PDF
ASX Announcement
29 October 2024
ASX: MKR
MAIDEN ORE RESERVE – WONAWINTA SILVER MINE
Highlights
•
The Wonawinta Silver Mine and Processing plant is a highly strategic asset
located within the prolific Cobar Basin, NSW, and owned 100% by Manuka
Resources Limited.
•
Wonawinta is the only primary silver Reserve in Australia with all mining
approvals current and intact, and process plant fully constructed Wonawinta was producing silver for Manuka as recently as late 2022.
•
Ore Reserve of 4.8Mt1 at 53.8g/t Ag containing 8.4Moz of silver comprising:
o Proved Ore Reserves of 0.8Mt at 50.8g/t Ag; and
o Probable Ore Reserves of 4.1Mt at 54.3g/t Ag.
•
Ore Reserve is based solely on shallow (<40m deep) oxide material.
•
Total Wonawinta Resource comprises 38.3Mt at 41.3g/t Ag for 51Moz of silver
(ASX release 1 April 2021).
•
The Ore Reserve and associated Implementation Plan will be used to assess the
potential to take Wonawinta out of active care & maintenance and
recommence silver production.
• Manuka is currently focused on the restart of a high-margin operation at its 100%
owned Mt Boppy Gold Project located 50km east of Cobar and progressing
approvals for its world-class vanadium rich irons sand project located in the
Southern Taranaki Bight, New Zealand.
Manuka’s Executive Chairman, Dennis Karp, commented:
“Manuka’s Maiden Silver Ore Reserve and the preparation of an Implementation Plan
for Wonawinta represents a major milestone for the Company and supports a potential
of restarting silver mining and processing operations in the future. Our process plant at
Wonawinta has been kept in excellent condition and on active care & maintenance since
the processing of gold from stockpiles hauled from Mt Boppy, ceased in February 2024
and therefore stands ready to come back online at short notice.
The prospect of restarting Wonawinta provides the Company with excellent optionality
on silver and the potential to take advantage of the very buoyant precious metals prices
and broader strategic opportunities within the Cobar Basin. We look forward to providing
further updates to the market as our strategy progresses.
1 Arithmetic errors may be present due to rounding
Manuka Resources Limited - Level 4 Grafton Bond Building, 201 Kent St Sydney NSW Australia 2000
ABN 80 611 963 225
Tel 02- 7253 2020
www.manukaresources.com.au
Summary
Manuka Resources Limited (“Manuka” or the “Company”) is pleased to announce a
Maiden Ore Reserve (under its ownership) of the Wonawinta Silver Mine (“Wonawinta”
or the “Project”), located 80km due south of Cobar in New South Wales (Figure 1). The
Ore Reserve and associated Implementation Plan provides the Company with a clear
production pipeline and pathway toward a dual precious metals revenue stream from
two operating assets in the Cobar basin, namely Mt Boppy Gold Mine and Wonawinta.
Wonawinta was built by Cobar Consolidated Resources (“CCR”) in 2011 and acquired
by Manuka in 2016. The Project comprises a granted mining lease, existing open pits
mines, an existing 1Mtpa CIL process plant and associated infrastructure including
approved tailings dams and accommodation facilities (Figures 2 – 4). Whilst limited
silver production was undertaken by Manuka in 2022, the Wonawinta plant has primarily,
and as recently as December 2023, been used by Manuka to produce gold doré from
ore hauled from the Mt Boppy gold mine.
Figure 1: Location of Manuka’s Wonawinta and Mt Boppy Projects within the Cobar basin.
Page 2
Figure 2: Overview of the Wonawinta Mine Site.
Page 3
Figure 3: Existing Manuka Open Pit
Figure 4: The existing Wonawinta CIL Processing Plant
Page 4
The current Implementation Plan proposes the mining and processing of 4.8Mt of Ore
at a grade of 54g/t Ag over 4.5 years for the recovery of 5.8Moz of silver. Capital Costs
for taking the mine out of care & maintenance and recommence production are
estimated to be A$3.7M plus A$12.4M in pre-strip mining. Based on the current silver
forward curve and an All-In Sustaining Cost of A$40.51/oz, the mine plan would deliver
operating cash flows of ~A$100M based on the Ore Reserve alone.
As the price and demand outlook for silver continues to develop, Manuka will continue
to refine its economic model for the Project and look to further optimise the mining
schedule and reduce pre-production mining costs ahead of a decision to commence the
restart of operations.
Mineral Resource Estimate
The Wonawinta Mineral Resource Estimate of April 2021 was compiled by Mining
Associates Limited (MA) based on a cut-off grade of 20 g/t Ag using block models
developed by MA based on ordinary kriging techniques (ASX release 1 April 2021).
Table 1: Wonawinta Silver Project Mineral Resource – 1 April 20212
Resource Category
Mt Ore
g/t Ag
%Pb
Ag Moz
Pb kt
Measured
1.1
47.3
0.69
1.65
7.5
Indicated
12.3
45.5
0.83
18.04
102.8
Inferred
24.9
39.0
0.39
31.25
96.9
Total
38.3
41.3
0.54
50.94
207.2
Based on 20 g/t Ag cut-off
Ore Reserve Statement
The Ore Reserve (Table 1) was prepared by independent mining consultancy Proactive
Mining Solutions Pty Ltd, open cut mine planning and design specialists.
Measured and Indicated Resources were converted to Proved and Probable Ore
Reserves respectively, subject to pit designs, modifying factors and economic
evaluation outline in this announcement. The Ore Reserve is based on re-entering the
two existing pits (Boundary and Manuka) and the development of two new northern pits
(Belah and Bimble) (Figure 2 & 3) and have been calculated using A$47.8/oz Ag and
royalties of 2.4% of gross revenue including allowable deductions. A variable cut-off
grade has been utilised based on the recovery for each mining block.
The Company is not aware of any new information or data that materially affects the information used
to compile the 2021 Mineral Resource and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed. The 2021 Mineral Resource included a separate stockpile category which has not
been used in the estimation of an Ore Reserve. These stockpiles were processed in 2022/23 in a trial
phase of processing with observations reported in Appendix 1.
2
Page 5
Table 2: Wonawinta Silver Project Ore Reserve (by pit)
Ore Source
Proved
Probable
Total
Mt
g/t Ag
Moz
Mt
g/t Ag
Moz
Mt
g/t Ag
Moz
Belah Pit
-
-
-
1.0
60.6
1.9
1.0
60.6
1.9
Bimble Pit
-
-
-
0.7
57.4
1.3
0.7
57.4
1.3
Boundary Pit
0.4
50.1
0.6
1.3
49.7
2.1
1.8
49.8
2.9
Manuka Pit
0.4
51.5
0.7
1.1
52.5
1.9
1.5
52.3
2.5
Total
0.8
50.8
1.3
4.1
54.3
7.1
4.8
53.8
8.4
2,000
100
1,600
80
1,200
60
800
40
400
20
-
Grade (g/t Ag)
Mined Tonnes (kt)
Note: Tonnes and Grade are rounded. Discrepancies in calculated Contained Metal is due to rounding.
(2) (1) 1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
Quarters
Belah Ore
ManNth Ore
ManSth Ore
BdyNth Ore
BdySth Ore
Bimble Ore
Belah Waste
ManSth Waste
ManNth Waste
BdyNth Waste
BdySth Waste
Bimble Waste
Mined Grade
350
70
300
60
250
50
200
40
150
30
100
20
50
10
-
(2) (1) 1
2
3
4
5
6
7
8
9
Recovered Grade (g/t Ag)
Processed Tonnes (kt)
Figure 5: Wonawinta mining profile
10 11 12 13 14 15 16 17 18 19 20
Quarters
Ore Processed
Recovered Grade
Figure 6: Wonawinta ore Processing profile
Page 6
Growth Opportunities
Resource to Reserve Conversion
The Ore Reserve and associated Implementation Plan incorporates only Proved and
Probable Reserves representing only 13% of the Wonawinta Mineral Resource
Estimate. The main zone of silver-lead-zinc mineralisation in the project occurs along a
6km strike length that is parallel to the Wonawinta Anticline hinge (Figure 2). Further
infill drilling between the proposed open pits is anticipated to increase Resource
confidence and allow for its incorporation into the Reserve based mine plan.
Leverage to Silver Price
Economic analysis has demonstrated the Project is highly sensitive to movements in
the silver price. A 10% increase in the silver price results in a 32% increase in operating
cash flows from A$100M to A$132M.
Base Metals Exploration
The Wonawinta silver deposit has been described as exhibiting characteristics of a
Mississippian Valley Type (“MVT”) deposit. Such deposits are hosted by dolostone and
limestone in platform carbonate sequences and usually located at the flanks of basins
or foreland thrust belts and are rich in lead-zinc and silver.
Previous owners of Wonawinta did not target sulphide mineralisation, with most drill
holes terminating at base of weathering. A limited exploration program undertaken by
Manuka in 20213 targeting sulphide mineralisation beneath the existing Resource
returned encouraging intervals of galena (lead sulphides) and sphalerite (zinc sulphite)
in conjunction with silver mineralization (Figure 7). The strike and lateral extent of Booth
Limestone represents a large potential base metals sulphide Resource at the Project.
Strategic Value
The Wonawinta process plant sits on an approved Mining Lease and is strategically
located within trucking distance of significant undeveloped deposits and current
operations within the Cobar basin. Outside of silver production from the Wonawinta
Resource, the Wonawinta process plant could be readily upgraded to produce base
metal concentrate source either from withing Manuka’s tenure or from third parties. The
Company see significant value in the commercial optionality that the Wonawinta
process plant provides.
3 ASX Release 1 June 2021
Page 7
Figure 7: Typical cross section through mineralisation at Wonawinta showing Booth
Limestone and MVT style mineralisation beneath and down dip of Wonawinta silver
open oxide pits
Significant intercepts down dip of the Wonawinta Resource
Proof-of-Concept’ drill program has successfully tested for presence of carbonatehosted sulphides in the Winduck Shelf strata down-dip from existing Wonawinta open
pits encountering lead-zinc-silver mineralisation over 3km strike
Mineralised intervals include:
•
20m @ 1.98% Pb+Zn, 43 g/t Ag = 110 g/t AgEq (94 - 114m in DBM003)
o including 4m @ 6.34% Pb+Zn, 63 g/t Ag = 372 g/t AgEq (101 - 105m)
•
11.4m @ 1.23% Pb+Zn, 83.5 g/t Ag = 125.5 g/t AgEq (130 - 141.4m in
DBM004)
•
5.0m @ 2.52% Pb+Zn, 128 g/t Ag = 201 g/t AgEq (63-68m in DBL003)
Single-meter assays include:
•
1.0m @12.18% Pb+Zn, 343 g/t Ag = 732 g/t AgEq (104-105m in DBM003)
•
1.0m @11.93% Pb+Zn, 314 g/t Ag = 701g/t AgEq (101-102m DBM003)
•
1.0m @ 4.2% Pb+Zn, 419 g/t Ag = 561g/t AgEq (135-136m in DBM004)
•
1.0m @5.94% Pb+Zn, 339 g/t Ag = 505 g/t AgEq (66-67m in DBL003)
•
1.0m @ 5.02% Pb+Zn, 347g/t Ag = 485 g/t AgEq (105 - 106m in DMA002)
•
1.0m @4.72% Pb+Zn, 183 g/t Ag = 330 g/t AgEq (67-68min DBL003)
Page 8
Implementation Plan
Summary
The Wonawinta Ore Reserve has been compiled in conjunction with an Implementation
Plan which details the activities, costs and schedules to commence mining and
processing at Wonawinta. The Project production target is based on re-entering the two
existing pits (Boundary and Manuka) and developing two new shallow oxide pits (Belah
and Bimble) north of the plant, all of which are located within the existing approved area
of disturbance for the mine.
The Implementation Plan contemplates a conventional truck and shovel mining
operation for the excavation of free dig clays and limestone material with blasting
required for the later component. Mining costs have been evaluated from first principles.
Processing costs for the Wonawinta plant have been built from actual operating cost
data compiled from 2020 to 2023 when the plant was used to leach Mt Boppy gold ore
and well as process a trial phase of existing silver oxide stockpiles on the Wonawinta
ROM area. No initial modifications are proposed to the flowsheet of the Wonawinta
plant. The Implementation Plan includes the addition of a Deslime circuit at the end of
the first year of production.
Project Tenure
The Project tenements comprise a granted Mining Lease and seven adjacent
exploration licences (Table 3).
Table 3: Tenement comprising the Project.
ID
Holder
Area
Grant Date
Expiry Date
ML1659
Manuka Resources Limited
923.8 Ha
23-11-2011
23-11-2032
EL6155
Manuka Resources Limited
5 units
17-11-2003
17-11-2026
EL6302
Manuka Resources Limited
96 units
23-09-2003
23-09-2026
EL6482
Manuka Resources Limited
92 units
18-11-2005
18-11-2026
EL6623
Manuka Resources Limited
9 units
31-08-2006
31-08-2026
EL7345
Manuka Resources Limited
59 units
25-05-2009
25-05-2028
EL7515
Manuka Resources Limited
5 units
07-04-2010
07-04-2027
EL8498
Manuka Resources Limited
38 units
10-01-2017
10-01-2029
The Project occurs in the Western Lands Leases of NSW where Native Title has been
extinguished. Manuka is the 100% owner of the pastoral lease on which the Project
Mining lease and Mineral Resource is situated.
To date, there are no option agreements or joint venture terms in place for the Project
nor are there known obligations on ground covered by claims comprising the Project.
No compensation agreements are in place for the Project.
Page 9
Mineral Resource Estimate
The Wonawinta Mineral Resource Estimate of April 2021 was compiled by Mining
Associates Limited (MA) based on a cut-off grade of 20 g/t Ag using block models
developed by MA based on ordinary kriging techniques (ASX release 1 April 2021).
Resource Classification Criteria
For the classification of Mineral Resources for the Project, the following definitions were
adopted and applied to each domain separately:
Measured Mineral Resources: those portions of the deposit estimated with a nominal
drill spacing of 10 m x 10 m and demonstrate a high level of confidence in the geological
and grade continuity of mineralisation. Blocks are dominantly estimated with a minimum
of 12 composites, the nearest drill hole within 20 m and the average distance to all
informing samples approximately 30 m or less. Krige efficiencies for measured mineral
resources are dominantly higher than 0.5. The conditional bias slope recorded is greater
than 0.8. Measured Mineral Resource are estimated in the first kriging run.
Indicated Mineral Resources: those portions of the deposit estimated with a drill spacing
of 40 m x 40 m that demonstrate a reasonable level of confidence in the geological
continuity of mineralisation. The following estimation statistics were used as a guideline
to assist defining grade continuity. Indicated blocks have been estimated with a
minimum of 6 samples, and within 40 m of a drill hole, and an average distance to all
informing composites of 80m. Krige efficiencies of blocks within the Indicated category
fall within the range of 0.25 to 0.4. Lower efficiency blocks may be included if a structural
trend is present. Indicated resources may be estimated in the first or second kriging run.
Inferred Mineral Resources: those portions of the deposit estimated with a drill spacing
of greater than 40 m x 40 m, and include areas drilled on a 250 m x 100 m sections or
those portions of the deposit with a smaller number of intersections but demonstrating
a reasonable level of geological confidence. Inferred Mineral Resource are estimated in
the first, second or third kriging run, limited blocks from the fourth run are included where
geological continuity can reasonably be assumed to exist between drill intercepts.
Conversion of Mineral Resource Estimate to Ore Reserves
The Proved Ore Reserve estimate is based on Mineral Resources classified as
Measured, after consideration of all mining, metallurgical, social, environmental,
statutory and financial aspects of the project. The Probable Ore Reserve estimate is
based on Mineral Resources classified as Indicated, after consideration of all mining,
metallurgical, social, environmental, statutory and financial aspects of the project.
Reserve Cut-off Grades
Cut-off grades have been calculated as a variable grade per block within the resource
model. Each block with a silver grade above zero has a calculated metallurgical
recovery, an ore cost, and a given silver price. The silver price has been modified to
include a factor for dilution and recovery.
Page 10
Within the Resource model, the cut off grade is calculated as:
(ore cost) / (modified silver price x metallurgical recovery)
From this, the silver grade of each block is then subtracted from the cut-off grade to give
a margin grade. The block is then considered ore if the margin grade is greater than 0.
An allowance of 15 g/t of silver has been made for mining cost. As such physicals are
then calculated using three cut off bins. These are:
•
Low Grade - margin greater than 1g/t Ag, but less than or equal to 15g/t Ag.
•
Medium Grade - margin greater than 15 g/t and less than 35g/t Ag.
•
High Grade - margin greater than 35g/t Ag.
For this case, the net silver price of A$47.89/oz has been applied to the cut-off grade
calculations.
Geotechnical
Geotechnical slopes have been derived from a report by Pells Sullivan Meynink (PSM)
of April 2013. No studies have been completed since then. The report suggests batter
angles of 65 degrees on bench heights of 10m, separated by berms of 5m. This applies
to the first 30 vertical metres from surface. Below that, a batter angle of 70 degrees for
a 15m bench height, and 5m berm has been used. These give overall slopes of 46
degrees and 58 degrees respectively. Considering the slightly varying depth of
oxidation, all oxide material was given 46 degrees, and fresh material given 58 degrees
for the purposes of mine optimisation.
Mining Summary
The Wonawinta Resource model is reported as a potential open pit mining scenario.
The Mineral Resource Estimate has been reported from surface to 190RL which is
approximately 40m below surface. The proposed Manuka and Boundary pit shells are
cutbacks to the previous designs. Belah and Bimble are previously unmined pits.
Pit design work has been completed using Surpac Software as below:
•
Pit wall geometry is as per the geotechnical aspects outlined above.
•
Ramp gradient 1:10 inside edge of the ramp.
•
Ramp width of 15m as single lane ramps for 100t class trucks, for each design.
•
Minimum mining width of 20m at pit floor.
Pit designs have been completed for each mining area as shown in Figure 7.
Page 11
Figure 7: Pit Designs for the Boundary (top left), Manuka (top right), Belah (bottom left),
Bimble (bottom right).
Page 12
It is assumed that mining will occur using conventional open pit drill blast / load haul
methods, using a dry hire fleet arrangement for load and haul, and a drill and blast
contractor There will be a component of free dig clays, as well as transitional and hard
fresh rock material. Drill and blast, where required, has been allowed for using a nominal
0.4 powder factor. A nominal fleet of 120t class excavators, and 90t class dump trucks
will be used.
Mining production rates were set at 260kBCM per month as a maximum. Allowances
have been made for lost shifts due to weather, equipment servicing, and some holidays.
Most months require half the maximum mining rate to maintain mill feed, and as such
mining is mostly completed on a day shift only basis. Mill feed rates were set at 100 kt
per month. Additional smoothing of the schedule could normalise overall mining rates
per month.
Mining costs have been calculated for each material type from first principles based on
anticipated truck requirements and haul distances between the current pit extents and
existing ROM pads and WRD locations. Due to the relatively flat lying nature of the
mineralised zones, and the existing as mined shapes, no allowance has been made for
vertical difference in the mining costs, other than for the oxide / fresh rock interface, and
this is considered appropriate.
All-in mining costs have been calculated using rates effective May 2024. The fleet costs
include maintenance and associated labour. Fuel cost as currently delivered to site,
labour rates for operators, and other consumables such as GET have been allowed for.
A cost adjustment for ore mining has also been included. This makes allowance for
grade control and selective mining practices in ore.
Drill and blast rates are based on quotes supplied by a contractor in 2023, using Epiroc
T45 top hammer drill rigs or similar. An escalation factor of 10% has been made to allow
for any increase up to May 2024.
A nominal cost per mined BCM has been applied for rehabilitation works on waste rock
dumps.
Mining costs have been applied to the block model, using oxidation codes to define the
free dig clay, and drill and blast limestone / fresh rock. These costs have then been used
directly in the Whittle optimisation process. Mining costs, ore costs and recovered silver
grades were carried from the Resource model through the physicals and scheduling
process. Dilution was added to the physicals (10%) increase in mineralised tonnes, and
grade was reduced by 9%. The grade reduction was higher than the Whittle
optimisation, to ensure no ounces were added to the mining physicals, by increasing
tonnes through dilution.
Page 13
Pit Dewatering
From historical records, significant inflows of groundwater are not expected into the
Wonawinta open cut pits. This is mainly due to the shallow nature of the targeted silver
mineralisation, hence the designed pits are relatively shallow and above the water table.
As such pit dewatering will be mainly limited to capacity requirements for rain events
within the open pit perimeter catchment.
Pit dewatering is planned to be managed using a leap frog system of in-pit sumps and
high volume/high head diesel pump, with water being pumped to either the purposebuilt evaporation and sediment ponds or used as dust suppression in and around the
open cut operational areas.
As a further control measure for water in and around the open cut pits, diversion
structures, such as drainage/culverts and cut off drains will be in service to help prevent
any run-off flows entering the void footprint. All surface water controls are being
implemented in line with the site consent conditions and the site Surface Water
Management Plan.
Metallurgical Summary
ALS Testwork
Metallurgical test work was conducted for Manuka by ALS Perth on three Manuka silver
ROM stockpile composites with a final report provided in June 2021. Ostensibly, ALS
test results were consistent with historical plant data from March-September 2015
following the introduction of the 1800kW ball mill. Silver recoveries during this 6-month
operational period were below the 85% forecast, reportedly due to unexpected oretypes and sub-optimal practices and procedures of the owners at the time. Average
silver head grades reporting to the mill from the ROM were 84g/t Ag.
Data from the ALS leach tests, summarised below in Table 4, highlights the variability
of the ore with respect to silver grades. Furthermore, the elevated calculated head
assay recorded for the Fine Composite was found to be the result of incomplete leaching
of silver contained in the +125µm fraction of the leach residue, which constituted 17%
of the total mass and returned an assay of 124g/t Ag. In contrast, 2/3 of the leach
residue mass was below 25µm with this fines fraction assaying only 3g/t Ag, exposing
the extent of fine clay and a broad particle size distribution for the sample in question.
Together with past studies, this supports the view that silver is heterogeneously
distributed over a range of complex mineral grains and particle sizes but tends to occur
as localised pockets of mineralisation less than 10µm in size. The presence of finely
disseminated silver is consistent with slow dissolution kinetics between 24-72 hrs across
all composites, but notably in the Fine sample due to a broad particle size distribution.
Relatively low sulphur content indicates substantial oxidation/weathering of the primary
Ag-bearing Pb, Zn, and Fe sulphides.
Page 14
Table 4. Summarised Test Data from ALS Perth – Manuka Ag ROM Stockpiles
Sample
p80
Coarse
Coarse
Mixed
Mixed
Fine
104
76
107
78
69
g/t Ag
Assay
Calc
56
63
56
59
74
76
74
73
106
143
Head
% Pb
% Zn
Assay
Assay
0.77
0.784
0.77
0.784
1.29
0.624
1.29
0.624
1.08
0.288
%S
Assay
0.14
0.14
0.24
0.24
0.3
g/t Hg
Assay
10.3
10.3
11.7
11.7
13.4
Ag dissolution
%
24hrs
72 hrs
77.8
82.5
80.6
84.6
79.5
85.5
79.7
86.2
77.8
89.5
CN consumtion
kg/t
24hrs
72 hrs
1.47
1.62
1.47
1.83
1.57
2.20
1.53
2.24
1.48
1.90
ALS Perth test data supports historical plant data which shows that a large proportion
of silver was rapidly leached in the first 1,000m3 tank (4-5 hrs) with recovery largely
limited by adsorption onto carbon, which was in turn controlled by the quantity and rate
of movement of carbon through the circuit. Elevated loaded carbon grades (>20,000
ppm) and reduced CIL carbon concentrations were correlated with low silver recoveries
and high dissolved silver in tails.
Whilst the ALS leach data provided an indicator of the amenability of the ROM stockpiles
to cyanidation under ideal laboratory conditions, further gap test work was required to
provide more detail around critical operational CIL parameters and assist with flowsheet
development.
Areas of specific interest included:
1. Target carbon concentrations and loadings
2. Impact of CN, DO & pH on CIL recovery
3. Effect of grind size
4. Deportment of Pb and Hg
Information on the impact of carbon loading on Ag recovery will provide practical
information around total carbon inventory, CIL tank concentrations, and strip frequency.
The recovery of Pb and Hg to carbon is also of interest along with any potential
mitigation strategies. The aim of the gap test work is to establish baseline plant
parameters and practices for the transition to silver and to identify any processing
deficiencies which may limit recovery.
AMML Test Work
Preliminary AMML test work was conducted on Mixed Comp ROM Stockpile as received
from ALS Perth. Initial CIL tests were designed to determine whether carbon loadings
impact overall dissolution via general equilibrium-driven forces. It is generally accepted
that CIL (simultaneous leaching & adsorption) enhances dissolution by lowering solution
tenor, particularly at elevated concentrations. Data revealed that although silver
dissolution was unaffected by carbon, reported loadings were surprisingly low based on
historical data (<5000 ppm) despite dissolved silver concentrations in excess of 40ppm.
Following further CIL test work on a number of samples, it was concluded that masstransport of silver through the carbon pore network was inhibited by ultrafine
Page 15
nanoparticles and that intraparticle diffusion of silver is the slow rate-controlling step.
Furthermore, -53µm fines were found to contain lower silver grades and a higher
proportion of clay-locked silver unamenable to cyanide. Subsequent tests on screened
material confirmed the rate-limiting effects of ultrafine particles on the adsorption of
[AgCN2]- by carbon.
Figure 8 was used to explain the observations, in which the equilibrium between
[AgCN2]- in solution and that adsorbed on carbon (K) is governed by the relative rates
of mass-transport of silver across the liquid-carbon interface (Msoln) and its migration
through the porous carbon network (Mcarb). In this model, the recovery of silver
proceeds via a two-stage mechanism involving typically rapid adsorption of [AgCN2]onto the carbon surface followed by relatively slow intraparticle diffusion. On the basis
of experimental results from highly weathered stockpile material, Mcarb is ratedetermining under conditions where surface sites near saturation and available active
surface sites are limited by high carbon loadings.
Figure 8: Adsorption of [AgCN2]- by carbon
For the purposes of corroborating assumptions around mass-transport limitations, CIL
tests were performed on +20mm material obtained from the October 2021 Crusher Trial
of ROM stockpiles with a view to potential processing options. Analytical data showed
that whilst silver is inconsistently distributed within the stockpile, it is generally
concentrated in the >75<600 um size range and diluted in -53µm fines. Mineralogy from
weathered pit samples revealed the presence of oxidised silver in the form of halide
grains, ranging in size from 2.5-250µm.
In contrast to CIL tests on unscreened ore, the kinetics of silver loading onto carbon
from +20mm material appears faster (K is larger) with higher equilibrium loading
capacity, i.e., the rate of silver loading over time is faster and more linear. Importantly,
equilibrium loadings for finer feed tended to plateau below 5,000ppm, whereas
screened coarse feed continued to load above 5,000ppm after 4hrs contact under
laboratory conditions.
Trial Silver Processing – Metallurgical outcomes
The following observations and assumptions are based on operational plant data over
the period April 2022 - January 2023 and are supported by laboratory test work findings.
Page 16
1. Bimodal particle size distribution featuring fine weathered aluminosilicate clays
(-38µm) and coarser limestone and quartz sediments.
2. Subeconomic Ag grades in -38µm fractions coupled with low recoveries.
3. Amenability of clays to separation in dewatering/desliming hydrocyclones.
4. Deslime cyclone feed p80 of 3-4mm.
5. An estimated 50:50 mass split in the Deslime cyclones, contingent on the
proportions of fine clay and coarser sediments in the cyclone feed.
6. Approximately 5-10% Deslime cyclone overflow (“COF”) mass >38µm and 2030% Deslime cyclone underflow (“CUF”) mass <38µm, contingent on the
proportions of fine clay and coarser sediments in the cyclone feed.
7. An estimated 25:75 silver split in the Deslime cyclones, such that 25% silver in
the scrubbed clay-rich stream is sent to tails via deslime COF and 75% is
processed via deslime CUF