UPDATED ORE RESERVE – WONAWINTA SILVER MINE
28% increase in Ore Reserve ahead of planned production
restart
Highlights
• Manuka Resources Limited’s (Manuka) 100% owned Wonawinta mine site is actively
recommissioning the metallurgical plant facility (last operated 2024) ahead of
planned silver and gold processing operations restart this quarter.
• Updated mining study has increased the Wonawinta Probable Ore Reserve to 7.9Mt
@ 50.4g/t Ag containing 12.8Moz of silver, representing an increase of 28% in
Ore Reserve tonnes and 15% in contained silver compared with the Ore Reserve
announced on 30 May 2025.
• The Ore Reserve comprises shallow (< 60m) predominantly oxide material and is
based solely on Measured and Indicated Mineral Resources.
• The Wonawinta Mineral Resource remains 38.3Mt @ 41.3g/t Ag containing 51Moz
of silver (ASX announcements dated 1 April 2021, 30 January 2026 and 23 March
2026), providing further opportunity for future optimisation and reserve conversion.
• Plant recommissioning activities continue, including staffing, operational readiness,
contract finalisation and installation of upgraded crushing & de-slime circuits.
• First gold revenues remain expected later this month, with silver production targeted
to commence during the September 2026 quarter.
• The Wonawinta processing plant remains a highly strategic asset within the Cobar
Basin, providing future flexibility to process silver, gold and base metals.
Manuka’s Executive Chairman, Dennis Karp, commented:
“Completion of the updated mining study marks another important milestone as Manuka
progresses towards the recommencement of mining and processing operations at
Wonawinta.
The revised Ore Reserve provides additional confidence in the production restart while
highlighting the quality of the existing Mineral Resource and the potential for further
optimisation as mining recommences.
Site recommissioning activities progressed at pace during the quarter, including fabrication
of the new crushing and de-slime circuits by Bond Equipment in South Africa, which are
now being shipped to site.
As we move towards first gold revenues later this month, with silver production due to
commence during the September quarter, our focus remains on safely recommissioning the
2
operation and delivering the next phase of growth for Manuka.”
Background
Mining Associates Pty Ltd (MA) were engaged by Manuka to undertake a Mining Study for
the Project. The type of mining evaluation work undertaken is comprehensive and used
together with a range of inputs to derive the reserve grade and tonnes (and to demonstrate
that the body of ore is economic, a criterion for reserve classification).
Mining is to be undertaken using an open-pit mining method. Conventional drill-blast-load-
haul methods are to be utilised. MA has undertaken pit optimisations, pit designs, mine
scheduling and economic analysis for the Wonawinta Project. This work was carried out
utilising the Deswik CAD package and Micromine’s SPRY scheduling package.
The updated open pit Ore Reserve estimation is 7.9Mt at a grade of 50.4g/t Ag and a total
material movement of 34.1Mt with a waste to ore strip ratio of 3.4:1. The pit optimisation
was guided by a pit shell optimised at a silver price of US$50/oz. The reserve financial
modelling was run using a silver price of US$55/oz and an exchange rate of AUDUSD 0.70
(equating to an A$ silver price of 78.57/oz). The closing silver price on 03 July 2026 was
~US$62.25/oz and the AUDUSD exchange rate was 0.6920 (equating to an A$ silver price
of A$89.96/oz).
The Wonawinta mine is fully permitted and the existing processing plant and infrastructure
is in the final stages of refurbishment and upgrade in preparation for the commencement of
silver production over the coming three months.
Figure 1: Location of Manuka’s Wonawinta and Mt Boppy Projects within the Cobar basin.
3
As shown in Figure 2, the Ore Reserve plan includes the Belah, Bimble, Boundary,
Manuka and Pothole open cuts, which all sit within the existing Mining Lease Boundary.
Figure 2: Overview of the Wonawinta Mine Site showing Ore Reserve pit shells and
related infrastructure
The Reserve pit optimisations were undertaken applying revenue from Measured and
Indicated Resources only. No value was subscribed to Inferred Resources, which were
treated as waste in these optimisations.
4
Using the reserve ultimate pit shells, Manuka continues to further optimise the Life of Mine
scenarios in readiness for a 2026 operating plan which is expected to contract out mining
activities to Macmahon Contractors P/L later in 2026.
Site metallurgical processing, recoveries and G&A costs were all developed by Manuka
from first principles using activity-based costing methods and past operating experience.
The metallurgical test work, flowsheet and forecast silver production was directed by
Manuka’s Dieter Engelhardt. All processing on site utilizes the existing plant and
infrastructure, along with a renewed and improved crusher and deslime circuit currently
being manufactured and installed.
Mineral Resource Estimates
The Wonawinta Mineral Resource Estimate of April 2021 was compiled by Mining
Associates Limited (MA) based on a cut-off grade of 20g/t Ag using block models developed
by MA based on ordinary kriging techniques (released on ASX 1 April 2021).
Table 1: Wonawinta Silver Project Mineral Resource – 1 April 2021
Resource Category Mt Ore g/t Ag %Pb Ag Moz Pb kt
Measured 1.1 47.3 0.69 1.65 7.5
Indicated 12.3 45.5 0.83 18.04 102.8
Inferred 24.9 39.0 0.39 31.25 96.9
Total 38.3 41.3 0.54 50.94 207.2
Based on 20g/t Ag cut-off
Ore Reserve Statement
The Ore Reserve (Table 2) was prepared by independent mining consultancy Mining
Associates Limited (MA).
Measured and Indicated Resources were converted to Probable Ore Reserves respectively,
subject to pit designs, modifying factors and economic evaluation outlined in this
announcement at a pre-feasibility study level. The Ore Reserve is based on re-entering the
two existing pits (Boundary and Manuka) and the development of three new northern pits
(Belah, Bimble and Pothole) (Figure 2). A variable cut-off grade has been utilised based on
the recovery for each mining block.
Table 2: Wonawinta Ore Reserve Estimate as at 1 June 2026
Wonawinta Ore Reserve Estimate
As at 01 June 2026
Units
Ore Reserve
Estimate
Probable Ore Mt 7.9
Probable Ore Silver Grade g/t 50.4
Arithmetic errors may occur due to rounding
5
Modifying Factors
Environmental - Wonawinta is situated on an existing mining lease, with approvals in place
from prior operations. These approvals are still in place for four pits. In essence, nothing
material needs to be done to modify any current approval to recommence mining as the
original conditions which considered the four pits have not varied. An approval may be
necessary to develop the Pothole pit, however due to the previous operating history, the
project location and ownership, and existing approvals, it is not anticipated that there will
be any issues with ESG approvals for recommencement of operations or the development
of Pothole pit.
Manuka in April 2025, engaged Irwin Environmental Management Pty Ltd to undertake an
environmental compliance audit. The audit concluded that Manuka is maintaining the
Wonawinta Mine Site under care and maintenance in a manner which satisfactorily reduces
the risk of harm to the environment. Some non-compliances have been noted, with the
majority of these representing matters which are administrative in nature or have low risk
of adverse environmental impact.
Geotechnical - PSM undertook a review of historical geotechnical slope recommendations
for the Wonawinta Project to determine if current slope recommendations were appropriate.
Manuka plan to expand both the current Manuka and Boundary pits through cutbacks, as
well as develop three new pits Belah, Bimble and Pothole.
Historical geotechnical reports, data and recommendations are summarised in Table 3
below. No additional data has been collected since 2013. Data gaps and uncertainties
identified from the historical data by PSM are outlined below:
• Geology is highly variable across the deposit. Increasing the uncertainty with
regards the materials that will be encountered within pit walls.
• No current geotechnical data available for Belah, Bimble and Pothole pits
• Potential for greater thicknesses of lower strength clays to occur in places. There
may be slope stability issues where these clays are present.
• Rock data structural material is limited, with potential for bench scale planar or
wedge type failures where adverse defects occur.
6
Table 3: Historical Geotechnical Reports, Data & Recommendations
PSM concluded that Manuka and Boundary pits had sufficient data and mining
experience for the recommendations in PSM1384-108L to be adopted. This assumes
pit expansions are not significantly deeper and that the pit walls are in similar material.
7
• The first 3 benches to have 10m bench heights, 65-degree batter angles and 5m
berm widths.
• Lower benches (assuming in rock) to have 10-20m bench heights, 70-degree
batter angles and 5m berm widths
Given the lack of current geotechnical data in Belah, Bimble and Pothole pits a
conservative design approach has been adopted. The slope design recommendations
in PSM1384.R1 have been adopted for these pits.
Table 4: Belah, Bimble Pothole preliminary geotechnical design parameters
PSM have recommended a geotechnical site investigation for Bimble, Belah and
Pothole will be needed prior to the mining of those pits. The site investigation should
consist of:
• 3-4 diamond drill boreholes (one in Bimble, two in Belah and one in Pothole).
The boreholes should be photographed, geotechnically logged, and samples
collected for geomechanical laboratory testing.
• Other geological drilling in the area should be reviewed in conjunction with the
geotechnical holes.
Following the site investigation geotechnical model, analysis and designs should be
updated.
MA has adopted the above design recommendations for this study. In MA’s view the
design parameters for Belah, Bimble & Pothole are conservative, with a potential
opportunity to steepen the walls after further investigation prior to the mining of those
pits.
Metallurgical
Plant Design
Previous processing of the clay-rich dolomitic limestone ore was from two open cut
pits, Manuka and Boundary. Shallow sediment-hosted lead-zinc-silver mineralisation
8
proved to be extensively oxidised with little to no residual sulphur at the depths mined.
Ore mineralogy was dominated by very fine surface clays and coarser dolomitic
limestone increasing with depth. Silver was mostly concentrated in clays through a
combination of primary mineralizing fluids modified in places by supergene enrichment.
Silver will be recovered from Wonawinta silver ore in a processing circuit (Figure 3)
using conventional comminution and metal leaching and recovery technology. A
desliming step will be added prior to grinding to remove problematic clays which
adversely impacted previous silver production and recovery. Most of the equipment
required is already installed with a new crushing circuit and deslime plant, with tailings
thickener and cyanide detoxification plant awaiting completion.
Cyanide leaching and carbon adsorption to recover silver has been extensively tested
in the laboratory and in the processing plant and has been shown to be efficient in ore
with low sulphur levels with reasonable reagent consumptions.
Final recovery of the silver into a saleable concentrate by zinc precipitation of the silver
rich eluate followed by filtration and retorting for mercury capture are all well-known
technologies and successfully practiced on site during previous silver ore processing.
Figure 3: Wonawinta Mine Metallurgical Plant flow process showing addition of a
Deslime and Dewatering Circuit to improve mill throughput and enhance leach
performance
Silver Recoveries
Metallurgical test work was conducted for Manuka by ALS Perth on three Manuka silver
ROM stockpile composites with a final report provided in June 2021. ALS test results were
9
consistent with historical plant data from March-September 2015 following the introduction
of the 1800kW ball mill. Silver recoveries during this 6-month operational period were below
the 85% forecast, reportedly due to unexpected ore-types and sub-optimal practices and
procedures of the owners at the time. Average silver head grades reporting to the mill from
the ROM were 84g/t Ag.
Data from the ALS leach tests, summarised below in Table 5, highlights the variability of the
ore with respect to silver grades. Furthermore, the elevated calculated head assay
recorded for the Fine Composite was found to be the result of incomplete leaching of silver
contained in the +125µm fraction of the leach residue, which constituted 17% of the total
mass and returned an assay of 124g/t Ag. In contrast, 2/3 of the leach residue mass was
below 25µm with this fines fraction assaying only 3g/t Ag, exposing the extent of fine clay
and a broad particle size distribution for the sample in question.
Together with past studies, this supports the view that silver is heterogeneously distributed
over a range of complex mineral grains and particle sizes but tends to occur as localised
pockets of mineralisation less than 10µm in size. The presence of finely disseminated silver
is consistent with slow dissolution kinetics between 24-72hrs across all composites, but
notably in the Fine sample due to a broad particle size distribution. Relatively low sulphur
content indicates substantial oxidation/weathering of the primary Ag-bearing Pb, Zn, and
Fe sulphides.
Table 5. Summarised Test Data from ALS Perth – Manuka Ag ROM Stockpiles
ALS Perth test data supports historical plant data which shows that a large proportion of
silver was rapidly leached in the first 1,000m3 tank (4-5hrs) with recovery largely limited by
adsorption onto carbon, which was in turn controlled by the quantity and rate of movement
of carbon through the circuit. Elevated loaded carbon grades (>20,000 ppm) and reduced
CIL carbon concentrations were correlated with low silver recoveries and high dissolved
silver in tails.
The following observations and assumptions are based on operational plant data over the
period April 2022 - January 2023 and are supported by laboratory test work findings.
1. Bimodal particle size distribution featuring fine weathered aluminosilicate clays (-
38µm) and coarser limestone and quartz sediments.
2. Subeconomic Ag grades in -38µm fractions coupled with low recoveries.
3. Amenability of clays to separation in dewatering/desliming hydrocyclones.
4. Deslime cyclone feed p80 of 3-4mm.
5. An estimated 50:50 mass split in the Deslime cyclones, contingent on the proportions
of fine clay and coarser sediments in the cyclone feed.
10
6. Approximately 5-10% Deslime cyclone overflow (“COF”) mass >38µm and 20-30%
Deslime cyclone underflow (“CUF”) mass <38µm, contingent on the proportions of
fine clay and coarser sediments in the cyclone feed.
7. An estimated 25:75 silver split in the Deslime cyclones, such that 25% silver in the
scrubbed clay-rich stream is sent to tails via deslime COF and 75% is processed via
deslime CUF.
8. Clays - 65% overall silver CIL recovery.
9. Limestones – 80% overall silver CIL recovery
10.Clay processing costs of A$20/t feed ore.
11. Limestone processing costs of A$31/t feed ore.
Cut Off Grades The marginal cut-off grades used in this study were estimated on an
individual block by block basis using the processing costs, processing recoveries, G&A
costs and royalty costs. If the payable revenue received from a tonne of plant feed
exceeded the processing, and royalty cost of that block of material, then that block will
be fed through the processing plant. Different cut off grades were applied to the
different Resource domains.
The metallurgical process involves a desliming process prior to treating by CIL, thus
the tonnes treated by CIL are less than the tonnes crushed. The processing costs,
deslimed percentages and recoveries, and cut-off grade estimation is shown in Table
6.1 to 6.4 below.
Table 6.1: Metallurgical Recoveries for cut-off grade estimation
Clay oxide %
Slimes Content 36%
Ag recovery to slimes 16%
CIL Recovery 90%
Global Ag Recovery 75.60%
Clay fresh %
Slimes Content 36%
Ag recovery to slimes 16%
CIL Recovery 90%
Global Ag Recovery 75.60%
Limestone oxide %
Slimes Content 23%
Ag recovery to slimes 14%
CIL Recovery 75%
Global Ag Recovery 64.50%
Limestone fresh
& Granite
%
Slimes Content 6%
Ag recovery to slimes 6%
CIL Recovery 50%
Global Ag Recovery 47.00%
11
Table 6.2: Clay cut-off grade estimate
As the cut-off grade used in the Resource Estimate was 20 g/t. The Mining Model cut-off grade used for the
Clay Domains was increased to 20g/t from the 18.2 g/t estimated above.
Table 6.3: Limestone and Granite cut-off grade estimate
Pit Optimisation - Pit optimisations were undertaken by MA using Deswik Pseudoflow
software. The regularised block model was coded with the cost and revenue parameters
shown below (Tables 7 and 8).
The Manuka 2026 operating plan utilises a mining contractor for mining operations, as
opposed to the previous 2025 Mine Plan which utilised a dry hire and owner operator
scenario.
CoG Calculation Clay oxide
Silver Price US$/oz $50.00
A$/US$ 0.7
Silver Price $ 71.4 A$/Oz
Payability 99.7%
Silver Price $ 2.29 A$/g
Selling Cost $ 0.01 A$/g
Royalty 2.4% $ 0.05 A$/g
Net Silver Price $ 2.23 A$/g
Processing Cost and G&A $30.71 A$/t Ore
Recovery 75.6% %
Marginal Cut off Grade 18.2 g/t
CoG Calculation Clay fresh
Silver Price US$/oz 50
A$/US$ 0.7
Silver Price $ 71.4 A$/Oz
Payability 99.7%
Silver Price $ 2.29 A$/g
Selling Cost $ 0.01 A$/g
Royalty 2.4% $ 0.05 A$/g
Net Silver Price $ 2.23 A$/g
Processing Cost and G&A $30.71 A$/t Ore
Recovery 75.6% %
Marginal Cut off Grade 18.2 g/t
CoG Calculation Limestone oxide
Silver Price US$/oz 50
A$/US$ 0.7
Silver Price $ 71.4 A$/Oz
Payability 99.7%
Silver Price $ 2.29 A$/g
Selling Cost $ 0.01 A$/g
Royalty 2.4% $ 0.05 A$/g
Net Silver Price $ 2.23 A$/g
Processing Cost and G&A $30.71 A$/t Ore
Recovery 64.5% %
Marginal Cut off Grade 21.4 g/t
CoG Calculation Limestone fresh & Granite
Silver Price US$/oz 50
A$/US$ 0.7
Silver Price $ 71.4 A$/Oz
Payability 99.7%
Silver Price $ 2.29 A$/g
Selling Cost $ 0.01 A$/g
Royalty 2.4% $ 0.05 A$/g
Net Silver Price $ 2.23 A$/g
Processing Cost and G&A $30.71 A$/t Ore
Recovery 47.0% %
Marginal Cut off Grade 29.3 g/t
12
Table 7: Optimisation Inputs #1
Revenue Factors Value Units
Commodity Prices
Silver Price $50.00 US$/oz
Exchange Rate 0.7 A$/US$
Silver Price $71.43 A$/oz
Royalty 2.4% Ad Valorem
Smelter $0.25 A$/oz
Ag Payability 99.7% %
Silver Cut Off Grades
Clay oxide 20.0 g/t
Clay fresh 20.0 g/t
Limestone oxide 21.4 g/t
Limestone & granite fresh 29.3 g/t
Silver Recoveries
Clay oxide 75.6 %
Clay fresh 75.6 %
Limestone oxide 64.5 %
Limestone & granite fresh 47.0 %
Table 8: Optimisation Inputs #2
Operating Cost Assumptions Value Units
Mining Costs
Total Drill and Blast Cost $1.77 $/t blasted
Grade Control $0.66 A$/t ore
Mining Admin $0.38 $/t TMM
Owners Mining Fleet $0.06 $/t TMM
Contractor Costs $5.53 $/t TMM
Metallurgy Costs
Crush & Deslime $1.81 $/t crushed
Grinding $1.79 $/t milled
CIL $11.76 $/t milled
Workshop/Maintenance $3.95 $/t milled
Process Plant Power $10.83 $/t milled
Lab $1.26 $/t milled
Elution $2.07 $/t milled
Camp and Admin $6.52 $/t milled
Transport to Refinery $0.42 $/t milled
13
Strategic Value
The Wonawinta process plant sits on an approved Mining Lease and is strategically located
within trucking distance of significant undeveloped deposits and current operations within
the Cobar Basin. Outside of silver production from the Wonawinta Resource, the Wonawinta
process plant treats gold ores from our Mt Boppy operation and could be readily upgraded
to produce base metal concentrate sourced either from within Manuka’s tenure or from third
parties. The Company see’s significant value in the commercial optionality that the
Wonawinta process plant provides.
This announcement has been approved for release by the Board of Manuka Resources
Limited.
For further information contact:
Dennis Karp
Executive Chairman
Manuka Resources Limited
Tel. +612 7253 2020
About Manuka Resources Limited
Manuka Resources Limited (ASX: MKR) is an Australian mining and exploration company
with key gold and silver assets located in the Cobar Basin (NSW), and offshore vanadium
and titanium bearing iron sands in the South Taranaki Bight of New Zealand.
The Mt Boppy Gold Mine (Cobar Basin, NSW)
The Mt Boppy gold mine is located 43 km east of Cobar, in the Central West region of New
South Wales. A resource update was released on ASX on 16 April 2024.
The Company has to date processed its stockpiles and gold mineralised waste product
through its Wonawinta plant. Manuka are currently pursuing a strategy of establishing of a
fit-for-purpose, on-site crush-screen-mill-float facility to enhance the economics of the Mt.
Boppy Mine and the value of near-mine prospects. The Mt Boppy site includes a 48-person
mine camp and is fully permitted for the proposed processing plant and on-site production.
The Wonawinta Silver Mine (Cobar Basin, NSW)
Previously Australia’s largest primary silver producer, Wonawinta produced approximately
3 million ounces of silver during 2012-2013, and an additional 500,000oz of silver in 2022.
A resource update was released on 1 April 2021
The Company is reviewing the potential of recommencing operations at Wonawinta, taking
advantage of the strengthening silver price environment.
Cautionary Statements
The Reserve Estimate comprises 100% Probable Reserves (derived from 17% Measured
and 83% Indicated Resources). No inferred resources were converted to reserves. The
estimated Ore Reserves and Mineral Resource have been prepared by a Competent
Person in accordance with the requirements in the JORC Code.
14
The economic outcomes associated with the implementation plan are based on certain
assumptions made for commodity prices and exchange rates and other economic variables,
which are not within the Company’s control and subject to change from time to time.
Changes in such assumptions may have a material impact on economic outcomes.
This announcement contains forward‐looking statements. Manuka has concluded it has a
reasonable basis for providing the forward‐looking statements included in this
announcement and believes it has a reasonable basis to expect it will be able to fund the
development of the Project. However, several factors could cause actual results, or
expectations to differ materially from the results expressed or implied in the forward-looking
statements. Given the uncertainties involved, investors should not make any investment
decisions based solely on the results of the Ore Reserve or the implementation plan.
COMPETENT PERSON SIGN-OFF
The information in this report that relates to Mineral Resources is based on, and fairly
represents, information and supporting documentation prepared by Ian Taylor, a
Competent Person who is a Member and Chartered Professional of The Australasian
Institute of Mining and Metallurgy, MAusIMM(CP). Mr Taylor is a full-time employee of
Mining Associates Pty Ltd. Mr Taylor has sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity being
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ Mr Taylor consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this report that relates to Mineral Processing, Infrastructure and Tailings
inputs into the Ore Reserves is based on information compiled by Dieter Engelhardt, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy,
MAusIMM. Mr Engelhardt is a full-time employee of Manuka Resources Limited. Mr
Engelhardt has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activities which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr Engelhardt consents to
the inclusion in this report of the matters based on his information in the form and context
in which it appears.
The information in this report that relates to Ore Reserves is based on information compiled
by Anthony Stepcich, a Competent Person who is a Fellow and Chartered Professional of
The Australasian Institute of Mining and Metallurgy, FAusIMM(CP). Mr Stepcich is an
Associate of Mining Associates Pty Ltd. Mr. Stepcich has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the
activities which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr Stepcich consents to the inclusion in this report of the matters based
on his information in the form and context in which it appears
15
APPENDIX 1: JORC CODE, 2012 EDITION – TABLE 1
I N 1. ING HNIQ N
JO pl • Commentary
Sampling
techniques
• Nature and quality of sampling
(e.g. cut channels, random
chips, or specific specialised
industry standard
measurement tools
appropriate to the minerals
under investigation, such as
down hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
• Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
• Aspects of the determination of
mineralisation that are
Material to the Public Report.
• Reverse circulation (RC), diamond coring (core) and aircore
(AC) drilling undertaken by Cobar Consolidated Resources
Limited (CCR) was used to obtain over 76% of the samples and
Manuka Resources Ltd (MRK) have obtained 15% of the
samples used in the resource estimate Grade control RC
drilling by Black Oak Minerals (BOK) in 2015 is also included.
The remaining samples were sourced from diamond and RC
undertaken by previous explorers Geopeko, CBH, Savage,
Pasminco and Triako. The drilling database within the
resource area comprises 2163 RC and 13 pre-collared core
holes and 49 diamond core holes. Also, in the database (not
used in the resource estimate) are 920 rotary air blast holes,
148 Air Core holes and 10,472 blast holes.
• RC and AC samples were predominantly collected over one
metre intervals and subsampled utilising a rig-mounted
cyclone/ cone splitter to provide a 1.5kg to 3.0kg assay
sample. Diamond core (NQ, HQ) was halved with a diamond
saw, PQ core was ¼ cored. In highly weathered material a
hammer and chisel were used to provide representative sub-
samples. Aircore samples were sub-sampled every metre
using a two-tier riffle splitter. MRK drill core was
photographed in the splits before placement into core trays.
• Measures taken to ensure the sample representivity
l m f s mpl v f l
pl s. Ass q l l m s s l
pl s, l ks f f s s. I
, h l s k h pl
s mpl s p f h l QA p ss s. Th
v l l QAQ m s h h s mpl
ss f pp p q l f s h
s m s.
• MKR used portable XRF readings to determine
v ls s f l s s, l k h l s h s
sh s lv h pX F s.
Drilling
techniques
• Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, face-
sampling bit or other type,
whether core is oriented and if
so, by what method, etc).
• All RC drilling used face sampling bits.
• Core holes were drilled PQ triple tube (83mm core diameter),
HQ (63mm core diameter) triple tube was trailed. The
diamond holes were surveyed using a multi-shot camera and
core orientations undertaken using an Ace orientation tool.
The core was photographed in detail, and the core remaining
after sampling was used in its entirety for metallurgical test
work.
Drill
sample
recovery
• Method of recording and
assessing core and chip
sample recoveries and results
assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists
between sample recovery and
grade and whether sample
bias may have occurred due
to preferential loss/gain of
fine/coarse material.
• RC drilling was closely monitored by field geologists and
used face-sampling bits, and generally had sufficient air
capacity to provide dry, high recovery samples. The RC
drilling rigs usually had access to booster compressors.
• For RC holes visual estimates were made of recovery and
wetness. It is estimated that less than 2% of samples were
damp or wet.
• Diamond drilling core recovery was estimated from
recovered core lengths and showed an average recovery of
89% within mineralised sections.
• The available sample recovery data shows generally
s l v s l sh p v
ss , f s f s s
s mpl l ss.
16
Logging • Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative
or quantitative in nature.
Core (or costean, channel,
etc) photography.
• The total length and percentage
of the relevant
intersections logged.
• All RC and AC samples were logged for lithology, texture,
grainsize, colour, alteration, regolith and wetness. In
addition core holes were geotechnically logged and had
density determinations undertaken. Logging of holes
drilled by explorers prior to MKR was undertaken in a
simi
Share your feedback
Discover