31 December 2024 Interim Financial Report
Released
Released
Announcement PDF
Manuka Resources Ltd ABN 80 611 963 225
HALF YEAR REPORT 2024
31 December 2024 Interim Financial
Report
For the 6-month period ended 31 December 2024
Manuka Resources Ltd and its
controlled entity
ABN 80 611 963 225
Manuka Resources Ltd
For the half-year ended 31 December 2024
i
CORPORATE DIRECTORY
Directors
Dennis Karp – Executive Chairman
Alan J Eggers – Executive Director
Lawyers
K&L Gates
Level 31, 1 O’Connell Street
Sydney NSW 2000
John Seton – Non-Executive Director
Key Management
Haydn Lynch – Chief Operating Officer
Company Secretary
Eryn Kestel
Registered Office
Level 4, Grafton Bond Building
201 Kent Street
Sydney NSW 2000
www.manukaresources.com.au
Auditor
RSM Australia Partners
Level 13, 60 Castlereagh Street
Sydney NSW 2000
Share Registry
Automic Group Pty Ltd
Level 5, 126 Phillip Street
Sydney NSW 2000
Stock Exchange Listing
Manuka Resources Limited shares (Code:
MKR) are listed on the Australian
Securities Exchange.
Manuka Resources Ltd
For the half-year ended 31 December 2024
ii
Contents
Page
Directors’ Report
3
Auditor’s Independence Declaration
10
Consolidated Statement of Profit or Loss and Other Comprehensive Income
11
Consolidated Statement of Financial Position
12
Consolidated Statement of Changes in Equity
14
Consolidated Statement of Cash Flows
15
Notes to the Financial Statements
16
Directors’ Declaration
31
Independent Auditor’s Report
32
Manuka Resources Ltd
For the half-year ended 31 December 2024
3
Directors’ Report
The Directors of Manuka Resources Ltd (‘Manuka Resources’) present their report together with the financial
statements of the Entity or the Group, being Manuka Resources (‘the Company’) and its subsidiaries Mt Boppy
Resources Pty Ltd (‘Mt Boppy’) and Trans-Tasman Resources Ltd (TTR) for the six months ended 31 December
2024.
Director details
The following persons were Directors of Manuka Resources during or since the end of the financial period and
up to the date of this report:
•
•
•
Mr Dennis Karp
Mr John Seton
Mr Alan J Eggers
Review of operations and financial results
The past six months of operations has focused on planning and preparatory works for the recommencement
of precious metal production within the Company. Gold production from the processing of Mt Boppy ores and
stockpiles at our 100% owned Wonawinta plant was suspended in February 2024 and the plant was placed on
‘care and maintenance’. The reason behind the suspension of operations was primarily due to deteriorating
gold grades, which when added to the haulage and processing costs, then rendered the returns from the gold
recoveries sub-economic. Over the past six months, considerable effort has been focussed on the
development of on-site processing at Mt Boppy which would eliminate the costs of haulage.
Manuka released its maiden silver reserve for its Wonawinta Silver Project in late October 20241. This is the
only silver reserve in existence in Australia and with the recent upward movement in the silver price in
Australian dollars, is becoming an increasingly valuable near-term production asset for the Company.
Manuka has a senior secured debt facility which initially expired on 31 January 2025 but was then extended
to 31 May 20252 during the half year. The Company is progressed in discussions with a replacement lender
and anticipates completing the refinance within the timeframe currently provided.
On 23 December 2024, the New Zealand government passed the Fast Track Approvals Act 2024 into law.
Manuka’s wholly owned subsidiary Trans-Tasman Resources’ Taranaki VTM Project is listed in Schedule 2 of
the Fast Track Act and is a mining project considered to meet the Fast Track Act’s purpose including being a
project of regional or national significance. Having our Taranaki iron sands project accepted for consideration
by the one-stop-shop Fast Track Act represents a huge step forward in gaining our final approvals to develop
this world class resource.
1 ASX release 29 October 2024
2 ASX release 23 December 2024
Manuka Resources Ltd
For the half-year ended 31 December 2024
4
New Zealand’s Prime Minister Christopher Luxon’s State of the Nation 2025 speech3 on 23 January 2025
highlighted the new Fast Track legislation and the importance of mining in the New Zealand economy moving
forward including the following:
“Fast Track will supercharge economic growth, enabling major investments and growth in energy, transport,
aquaculture, and a range of other sectors – but we can go further.”
“In regions like Taranaki and the West Coast there are big economic opportunities – higher incomes, support
for local business and families, and more investment in local infrastructure.”
“The minerals sector will also be critical for our climate transition – EVs, solar panels, and data centres aren’t
made out of thin air.”
Taranaki VTM Project
Manuka holds a 100% interest in the Taranaki VTM Iron Sands Project via its wholly owned subsidiary TTR.
Located offshore in the STB, within New Zealand’s Exclusive Economic Zone (“EEZ”), the project comprises a
3.2 billion tonne (“Bt”) veneniferous titanomagnetite (“VTM”) iron ore resource4 at 10.17% Fe2O3, 0.05% V2O5
(containing 1.6Mt V2O5) and 1.03% TiO2 (Table 2), ranking it as one of the largest drilled vanadium projects
globally. Indicated Resources comprise 65.7% of the total Resources with the balance being Inferred.
Table 2: Taranaki VTM Iron Sands Project Mineral Resource
Resource
Bt
Fe2O3 (%)
TiO2 (%)
V2O5 (%)
Indicated
2.1
10.45
1.06
0.05
Inferred
1.1
9.64
0.99
0.04
Total
3.2
10.17
1.03
0.05
TTR has granted mineral mining permit MMP55581 within the EEZ containing 1.88Bt VTM resource where the
current PFS mine plan can deliver production of 5Mt export concentrates a year grading 56-57%Fe, 0.5%V2O5
and 8.5%TiO2. TTR’s adjoining mineral exploration permit, MEP54068 inside the 12Nm limit within the Coastal
Management Area (“CMA”), contains a reported additional 1.29Bt VTM iron sands resource.
On 23 December the New Zealand government passed the Fast Track Approvals Act 2024 (the “Fast Track
Act”) into law. TTR’s Taranaki VTM Project is listed in Schedule 2 of the Fast Track Act to be considered by an
expert panel for final approvals to develop. Schedule 2 projects, including TTR’s, are considered to meet the
Fast Track Act’s purpose including being projects of regional or national significance.
Fast Track applications, to be considered for approval by an expert panel, opened on 7 February 2025. TTR is
now preparing to lodge its application under the Fast Track Act for consideration by a panel whose members
have relevant knowledge and expertise in mining projects, to consider the approval of the Marine and
Discharge Consents and apply any relevant conditions. This expert panel assessment is anticipated to be
undertaken in early 2025.
On 31 January 2025 the New Zealand government released the Critical Minerals List to identify minerals
essential to the economy and technological needs. Both vanadium and titanium are included in the Critical
Minerals List, which is a further positive for TTR’s Taranaki VTM Project.
3 https://www.beehive.govt.nz/speech/state-nation-2025
4 ASX release 1 March 2023
Manuka Resources Ltd
For the half-year ended 31 December 2024
5
The Critical Minerals List, alongside the Minerals Strategy for New Zealand 2040, also released on 31 January
2025, and the GNS Report on the NZ’s Potential Economic Mineral Deposits released on 29 August 2024, all
include offshore Taranaki VTM deposits containing vanadium and titanium in the STB controlled 100% by TTR.
The MBIE reports provide the government with insight and facts as to the potential for the development of
these mineral resources in New Zealand.
The New Zealand government has identified TTR’s world-class vanadium rich iron sands project as one of
national significance that has the ability to contribute to New Zealand’s economy and export earnings and to
the government’s resource objective of doubling the value of New Zealand’s mineral exports to $3 billion by
2035.
NZ Resources minister Shane Jones in a speech5, when he launched the finalised NZ Critical Minerals List6 and
the country’s Mineral Strategy to 20407 on 31 January 2025, he signalled a new direction for the growth of the
NZ minerals sector and the resources friendly policy of his government.
“The Minerals Strategy for New Zealand adopts a strategic lens out to 2040, focusing our approach to the
development of our minerals estate with a delivery roadmap to get us there. This is a holistic picture of minerals
production from the earth, from reprocessing waste material, and from potential recycling and recovery.”
“We have updated the goal of doubling our exports to $3 billion by 2035 from the previous goal of $2 billion.
Statistics NZ reports that mineral exports for the financial year ending June 2023 totalled $1.46 billion and our
submitters were clear – we needed a more ambitious goal.”
“This Government is taking an active, deliberate and co-ordinated approach to harnessing the potential of our
natural resources to take us from 'open for business' to 'doing business'.”
Geopolitical concerns exist over the security of vanadium supply from key producing nations of China with
39,210 tonnes vanadium metal a year (comprising 67% of global production), Russia with 11,760t (20%), South
Africa 4,480t (7.7%) and Brazil 2,800t (4.8%)8. Along with New Zealand, vanadium now has “critical mineral”
status in Australia, USA, Canada, UK and the EU.
The Taranaki VTM Project, when in production with an estimated annual production of 10,000t of vanadium,
will make Manuka one of the leading vanadium producers in the world and propel NZ into the third largest
producer of the metal after China and Russia.
Financial Summary
The loss for the consolidated entity for the half-year ended 31 December 2024 was $8,369,652 (2023 Loss:
$8,565,882). As at 31 December 2024, the consolidated entity had $2,038,521 in cash.
Resource Growth and Exploration Outlook
During the period under review the Company’s geological team has continued to implement in part, the
exploration work programmes established from the Q1 2023 Strategic Review. Specific targets were Au-Cu
south of Mt Boppy and a detailed review of the Pipeline Ridge historic drilling. Planned drilling of Pipeline
Ridge and Mt Boppy deeps was deferred to 2025. The MKR Resource Triangle (Fig. 1) shows the current
5 https://www.beehive.govt.nz/speech/new-direction-minerals-sector-grow-economy
6https://www.beehive.govt.nz/sites/default/files/202501/202501%20New%20Zealand%27s%20Critical%20Minerals%20List.pdf
7https://www.beehive.govt.nz/sites/default/files/202501/202501%20A%20Minerals%20Strategy%20for%20New%20Zealand%20to%202040.pdf
8 US Geological Survey, Mineral Commodity Summaries, January 2025: V vanadium metal
Manuka Resources Ltd
For the half-year ended 31 December 2024
6
classification of the exploration targets, and those in highlighted on which work was undertaken during Q3
and Q4 2024.
Figure 1: MKR Resource Triangle December 2024
Evaluation of the viability of mining the surface dumps at Mt Boppy continued during H2 2024. The mineral
resource estimates post the December 2023 sonic drilling programme were reviewed, and block models are
being revised for the main waste dump and the TSF3 tailings.
Metallurgical testwork was initiated on the main tailings impoundment TSF3, which is the main resource
component of the project. The testwork yielded average results, indicative of the need for more detailed
variability testwork on generating a payable flotation concentrate.
Other work programmes that have been progressed include:
• Continued geological modelling and assessment of historic drilling data of the Pipeline Ridge base
metal – gold deposit (Figure 2), including re-assessment of available diamond core. Pipeline Ridge
has potential for a gold opencast operation, and analysis and modelling of this target was
progressed during H2 2024. Work on Pipeline Ridge involved a comprehensive review of historic
reports plus all evaluation drilling to date. An assessment of developing an opencast gold operation
has been progressed, and an infill drilling programme for this purpose designed. Historic drilling
includes 32 diamond drill holes (6,590m) and 116 Reverse Circulation (RC) boreholes (6,059m).
Based on preliminary geological modelling the initial startup opencast target is between 2001,145Kt grading between 1.4 and 2.1 g/t Au, containing between 17 and 53 Koz Au. The
development of this operation is strategically aligned with future plans over the next 3-4 years at
Mt Boppy, located approximately 30km to the north.
Manuka Resources Ltd
For the half-year ended 31 December 2024
7
Figure 2: Pipeline Ridge exploration project, regional geology and Mt Boppy
•
Ground survey and pXRF soil orientation surveys on the Canbelego Cu – (Au) target south of Mt
Boppy on the Cobar Basin terrane boundary( Figure 3). Exploration field work involved establishing
a 200m line spacing and 100m sample spacing grid straddling the NW-SE terrane boundary
between the Baledmund Formation / Florida volcanics and the Girilambone Formation. The
boundary is marked by structural deformation related to thrusting and accompanying shearing.
Small historic shafts (e.g. The Priests, Canbelego Peak, Prendergast and Mouramba) exploited Cu
(Pb-Zn) mineralisation. The soil and auger sampling orientation programme yielded anomalous CuPb-Zn pXRF values (Figure 2). This phase of work will be followed up during H1 2025 with infill
sampling on a 50 x 50m grid spacing.
Figure 3: Canbelego – Boppy S Cu-(Au) exploration target
Manuka Resources Ltd
For the half-year ended 31 December 2024
•
8
Continued follow up examination of targets generated from a detailed regional geophysics synthesis of
the Mt Boppy and Wonawinta ML’s and exploration tenements, including conducting a merged data
reinterpretation of all available magnetic data and a revised IP interpretation for the McKinnons gold
prospect; and
Continued analysis and reorganisation of the Company’s extensive drilling and geochemical sampling
database.
•
Drill programmes for 2025 have been scoped in-line with prioritisation of the targets on Figure 1 with
encouraging engagement with local drilling contractors for these activities. Exploration of the Pipeline Ridge
prospect and Mt Boppy mine deeps drilling remain priority targets, and these activities are expected to start
during Calendar H2 2025. The possibility of reopening the Wonawinta Ag mine has fast tracked a review of
existing mineral resource delineation and exploration drilling on the project. Certain infill programmes
converting Inferred mineral resources to an Indicated classification are being assessed during H1 2025.
Significant changes in state of affairs
During the half-year there have been no significant changes in the state of affairs of the Group, but the
following events are noteworthy:
•
Further Extension of Secured Debt Facility
Since the end of the reporting period, the Company successfully negotiated to extend the term of the
secured debt facility to 31 May 2025. The extension has been granted on existing terms and rates with no
extension penalties or cash fees.
•
Maiden Ore Reserve – Wonawinta Silver Mine9
On 29 October 2024 Manuka released its Maiden Ore Reserve for its 100% owned Wonawinta Silver Mine.
This is the only primary silver reserve in Australia, with all mining approvals current and intact, plus a fully
constructed and (until recently), operating processing plant.
The Ore Reserve is 4.8Mt at 53.8g/t Ag containing 8.4Moz of silver comprising:
Proved Ore Reserves of 0.8Mtat 50.8g/t Ag; and
Probable Ore Reserves of 4.1Mt at 54.3g/t Ag (the breakdown on a per pit basis is shown in table 3 below)
The total Wonawinta Resource comprises 38.3Mt at 41.3g/t Ag for ~51Moz of silver10.
Table 3 Breakdown of silver reserve on a pit-by-pit basis
Ore Source
Proved
Probable
Total
Mt
g/t Ag
Moz
Mt
g/t Ag
Moz
Mt
g/t Ag
Moz
Belah Pit
-
-
-
1.0
60.6
1.9
1.0
60.6
1.9
Bimble Pit
-
-
-
0.7
57.4
1.3
0.7
57.4
1.3
Boundary Pit
0.4
50.1
0.6
1.3
49.7
2.1
1.8
49.8
2.9
Manuka Pit
0.4
51.5
0.7
1.1
52.5
1.9
1.5
52.3
2.5
Total
0.8
50.8
1.3
4.1
54.3
7.1
4.8
53.8
8.4
9 ASX release 29 October 2024
10 ASX release 1 April 2021
Manuka Resources Ltd
For the half-year ended 31 December 2024
9
Events arising since the end of the reporting period
There are no other matters or circumstances that have arisen since the end of the period that has significantly
affected or may significantly affect either:
•
•
•
the entity’s operations in future financial years;
the results of those operations in future financial years; or
the entity’s state of affairs in future financial years.
Dividends
No dividends were paid or declared during the period and no recommendation is made as to dividends.
Auditor’s Independence Declaration
A copy of the Auditor’s Independence Declaration as required under s.307C of the Corporations Act 2001 is
included on the following page of this financial report and forms part of this Director’s Report.
This report is made in accordance with a resolution of directors, pursuant to section 306(3)(a) of the
Corporations Act 2001
Signed in accordance with a resolution of the Directors.
Dennis Karp
Director
Date: 14 March 2025
10
RSM Australia Partners
Level 13, 60 Castlereagh Street Sydney NSW 2000
GPO Box 5138 Sydney NSW 2001
T +61 (0) 2 8226 4500
F +61 (0) 2 8226 4501
www.rsm.com.au
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the financial report of Manuka Resources Limited for the half-year ended 31
December 2024, I declare that, to the best of my knowledge and belief, there have been no contraventions of:
(i)
the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
(ii)
any applicable code of professional conduct in relation to the review.
RSM AUSTRALIA PARTNERS
Cameron Hume
Partner
Sydney, NSW
Dated: 14 March 2025
RSM Australia Partners is a member of the RSM network and trades as RSM. RSM is the trading name used by the
members of the RSM network. Each member of the RSM network is an independent accounting and consulting firm
which practices in its own right. The RSM network is not itself a separate legal entity in any jurisdiction.
RSM Australia Partners ABN 36 965 185 036
Liability limited by a scheme approved under Professional Standards Legislation
Manuka Resources Ltd
For the half-year ended 31 December 2024
11
Consolidated Condensed Interim Statement of Profit
or Loss and Other Comprehensive Income
For the half-year ended 31 December 2024
Notes
31 December
2024
31 December
2023
$
$
Sales revenue
5(a)
-
14,458,032
Cost of sales
6(a)
-
(17,992,997)
-
(3,534,965)
Operating loss
Other income
5(b)
347,441
260,122
Other expenses
6(b)
(3,241,818)
(2,209,733)
(2,046,073)
828,177
(4,940,450)
(4,656,399)
(3,429,202)
(3,909,483)
(8,369,652)
(8,565,882)
Foreign exchange gains / (losses)
Loss before finance expenses
Finance expenses
6(c)
Loss before income tax
Income tax expense
Loss for the period attributable to members of
Manuka Resources Limited
Other comprehensive income / (loss)
Total comprehensive loss for the period
attributable to members of Manuka Resources
Limited
-
-
(8,369,652)
(8,565,882)
(292,923)
320,790
(8,662,575)
(8,245,092)
Loss per share for loss attributable to the
ordinary equity holders of the Company
Basic profit /(loss) per share (cents per share)
15
(1.07)
(1.54)
Diluted profit /(loss) per share (cents per share)
15
(1.07)
(1.54)
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2024
12
Consolidated Condensed Interim Statement of
Financial Position
As of 31 December 2024
Notes
31 December
2024
30 June
2024
$
$
2,038,521
2,125,350
Assets
Current
Cash and cash equivalents
Trade and other receivables
Inventories
7
Prepayments
Other financial assets
8
Total current assets
17,386
14,332
238,022
226,451
138,393
54,683
46,000
95,565
2,478,322
2,516,381
Non-current
Mine properties and development assets
9
552,829
878,485
Exploration and evaluation assets
10
37,013,927
36,549,107
Property, plant and equipment
11
14,618,689
14,891,900
265,811
128,629
8
6,308,845
6,173,104
Total non-current assets
58,760,101
58,621,225
Total assets
61,238,423
61,137,606
Right-of-use Assets
Other financial assets
Liabilities
Current
Trade and other payables
12
7,352,026
7,241,172
Provisions
13
333,820
308,318
-
-
36,709,778
28,199,863
211,498
141,195
44,607,122
35,890,548
7,767,809
8,047,418
98,774
-
Contract liabilities
Borrowings
14
Lease liabilities
Total current liabilities
Non-current
Provisions
13
Lease liabilities
129,650
189,489
Total non-current liabilities
7,996,233
8,236,907
Total liabilities
52,603,355
44,127,455
Net assets
8,635,068
17,010,151
Borrowings
14
Manuka Resources Ltd
For the half-year ended 31 December 2024
13
Consolidated Condensed Interim Statement of
Financial Position (continued)
As of 31 December 2024
Notes
31 December
2024
30 June
2024
$
$
Equity
Share Capital
16
71,502,663
71,396,811
Share based payment reserve
17
5,435,349
5,253,710
(320,036)
(27,113)
(67,982,908)
(59,613,257)
8,635,068
17,010,151
Other reserves
Accumulated losses
Total equity
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2024
14
Consolidated Condensed Interim Statement of
Changes in Equity
For the half-year ended 31 December 2024
Share-based
payment reserve
Share
Capital
$
Other
reserves
Accumulated
losses
Total equity
$
$
$
$
57,038,387
4,242,049
40,160
(41,378,623)
19,941,973
Loss for the period
-
-
-
(8,565,882)
(8,565,882)
Other comprehensive loss
-
-
320,790
-
320,790
Total comprehensive loss for the period
-
-
320,790
(8,565,882)
(8,245,092)
Contribution of equity
1,313,399
-
-
-
1,313,399
Share based payments
-
524,516
-
-
524,516
Share issue costs
(172,979)
-
-
-
(172,979)
Balance at 31 December 2023
58,178,807
4,766,565
360,950
(49,944,505)
13,361,817
Balance at 1 July 2024
71,396,811
5,253,710
(27,113)
(59,613,257)
17,010,151
Loss for the period
-
-
-
(8,369,652)
(8,369,652)
Other comprehensive loss
-
-
(292,923)
-
(292,923)
Total comprehensive loss for the period
-
-
(292,923)
(8,369,652)
(8,662,575)
Contribution of equity
253,000
-
-
-
253,000
Share based payments
-
181,638
-
-
181,638
Share issue costs
(147,148)
-
-
-
(147,148)
Balance at 31 December 2024
71,502,663
5,435,349
(320,036)
(67,982,908)
8,635,068
Balance at 1 July 2023
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2024
15
Consolidated Condensed Interim Statement of Cash
Flows
For the half-year ended 31 December 2024
31 December
2024
31 December
2023
$
$
3,627
14,256,647
(3,345,209)
(15,001,051)
347,441
236,247
Operating activities
Receipts from customers
Payments to suppliers and employees
Other income
Finance costs paid
Net cash used in operating activities
(277,595)
(320,813)
(3,271,736)
(828,970)
-
(6,808)
Investing activities
Acquisition of property, plant and equipment
Disposal of property, plant and equipment
61,127
-
(204,743)
(557,787)
-
(23,565)
Exploration Bonds
26,000
-
Security Bond
23,565
-
Net cash used in investing activities
(94,051)
(588,160)
Repayments of borrowings
(15,915,895)
(2,491,141)
Proceeds from borrowings
19,224,285
3,425,980
Repayment of lease liabilities
(135,284)
(202,631)
Proceeds from issues of ordinary shares
253,000
1,047,500
Payments for development and exploration assets
Payment for other assets
Financing activities
Costs of issue of ordinary shares
(147,148)
(77,216)
Net cash from financing activities
3,278,958
1,702,492
Net change in cash and cash equivalents
(86,829)
285,362
Cash and cash equivalents, at beginning of the
period
2,125,350
265,833
Cash and cash equivalents, at end of period
2,038,521
551,195
This statement should be read in conjunction with the notes to the financial statements.
Manuka Resources Ltd
For the half-year ended 31 December 2024
16
Notes to the Financial Statements
1
Nature of operations
The principal activities of Manuka Resources Ltd comprise of exploration, mine development, mining and
processing of silver and gold, as well as completing the approval process and bringing its Taranaki VTM project
into production.
During the financial half-year ending 31 December 2024, the Company’s principal activities related to
preparatory works preparing the restart of the Mt Boppy gold project, with the processing of mineralised gold
material from Mt Boppy (Mt Boppy Stockpile Reprocessing) including bulk sampling and screening and haulage
of screened material. Field activities focused on a comprehensive review of all exploration prospects and
completion of a sonic drill programme. Works were also carried out completing the Company’s Maiden Silver
Reserve and assessing the potential restart of the Wonawinta silver project. Manuka has previously noted that
it was to restart Mt Boppy first, prior to commencing production at Wonawinta. However, the final restart
order may change depending on comparative financial forecasts and risk assessments due to be completed
beginning Q2 2025.
Trans-Tasman Resources Limited, Manuka’s 100% owned subsidiary continued to work through the final
approval stages of its Taranaki VTM project. Consistent NZ government communication surrounding the
implementation of its Fast Track legislation was encouraging, and finally on 23 December the New Zealand
government passed the Fast Track Approvals Act 2024 (the “Fast Track Act”) into law. TTR’s Taranaki VTM
Project is listed in Schedule 2 of the Fast Track Act to be considered by an expert panel for final approvals to
develop. Schedule 2 projects, including TTR’s, are considered to meet the Fast Track Act’s purpose including
being projects of regional or national significance.
2
Basis of preparation
The interim consolidated financial statements of the Group are for the six months ended 31 December 2024
and are presented in Australian dollars ($), which is the functional currency of the parent company.
These interim condensed consolidated financial statements have been prepared in accordance with the
requirements of the Corporations Act 2001 and AASB 134 Interim Financial Reporting. They do not include all
the information required in annual financial statements in accordance with Australian Accounting Standards
and should be read in conjunction with the consolidated financial statements of the Group for the year ended
30 June 2024 together with any public announcements made during the half-year ended 31 December 2024.
The interim financial report has been approved and authorised for issue by the board of directors on 14 March
2025.
2.1
Going Concern
The financial statements have been prepared on the going concern basis, which contemplates continuity of
normal business activities and the realisation of assets and discharge of liabilities in the normal course of
business.
Manuka Resources Ltd
For the half-year ended 31 December 2024
17
As disclosed in the financial statements, the group incurred a loss of $8,369,652 and had net cash outflows
from operating activities of $3,271,736 for the half-year ended 31 December 2024. As at that date the
company net current liabilities of $42,128,800.
These factors indicate a material uncertainty which may cast significant doubt as to whether the Group will
continue as a going concern and therefore whether it will realise its assets and extinguish its liabilities in the
normal course of business and at the amounts stated in the financial report.
The ability to continue as a going concern is dependent on a number of factors, including:
•
•
•
•
•
•
Continue to negotiate further loan extensions or raise additional funds in the capital markets, to the
extent that a debt restructure does not occur within the extension periods currently agreed.
Continue to manage the creditor book and repayment of long dated and past due creditors via funds
from capital raising, conversion of debt to equity or the use of working capital/short term loan facilities
as required.
Arranging and obtaining new funding from external non-bank lender.
the ability of the Group to commence silver production profitably and consistently as planned at
Wonawinta
raising additional funds in the capital markets
Sell down, divest or farm out its non-current assets.
The Directors are confident that the above steps can be achieved based on:
•
•
•
•
•
History of success in raising funds in the market, as previously demonstrated since Manuka’s IPO in
July 2020.
History of being able to successfully extend the current debt facilities, noting the facility with TransAsia
Private Capital Limited (as disclosed in Note 14) has been successfully extended twice previously;
The company has advanced discussions with an external lender to refinance the existing current debt
facilities.
The level of support extended from key suppliers and creditors to date all of whom are displaying a
strong interest in seeing the Company return to steady gold or silver production.
High gold and silver prices which both lend themselves to a profitable resumption of production from
material from either the Wonawinta silver project or the Mt Boppy gold project.
Accordingly, the Directors believe that the Group will be able to continue as a going concern and th
Share your feedback
Discover